propertylist

PA/02371/21: Construction of garage for private use at in Balzan

San Frangisk, Triq Antonio Bosio, Balzan

Construction of garage for private use at street level

Status
Status being checked
Location
San Frangisk, Triq Antonio Bosio, Balzan
Locality
Balzan
Applicant
Mr Victor Camilleri
Perit
Perit Andrew Agius Delicata
Type of works
New Construction (Commercial)

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around San Frangisk, Triq Antonio Bosio, Balzan

123 other applications within 300 m: 75 granted, 1 refused, 12 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/02867/25).

On Triq Antonio Bosio: 4 other applications, 2 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: MASStudio.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Andrew Agius Delicata

All applications by Andrew Agius Delicata

More from Victor Camilleri

All planning applications in Balzan