> Granted planning application in San Pawl il-Bahar: Demolition of roof accretions. Construction of 1 penthouse on the second-floor level, 1 duplex penthouse…

Planning applications › San Pawl il-Bahar › PA0238223

# PA/02382/23: Demolition of roof accretions in San Pawl il-Bahar

Porto Vita Flats, Triq ix-Xaghra tal-Bandieri/, Triq San Pawl, San Pawl il-Bahar

Demolition of roof accretions. Construction of 1 penthouse on the second-floor level, 1 duplex penthouse on the second and receded floor levels. Construction of pool and planters on the second receded floor level.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Porto Vita Flats, Triq ix-Xaghra tal-Bandieri/, Triq San Pawl, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Alexie Tabone](https://propertylist.mt/applicant/alexie-tabone)
- **Perit:** [Perit Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 3 floors plus a receded floor
- **Residential units:** 2
- **Received:** 8 February 2023
- **Validated:** 3 May 2023
- **Published:** 3 May 2023
- **Comments close:** 2 June 2023
- **Recommendation:** Refuse Permission
- **Decision:** Grant Permission
- **Decision date:** 21 January 2025
- **Permit expires:** 5 February 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/02382/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=02382&caseYear=23)

## Planning activity around Porto Vita Flats, Triq ix-Xaghra tal-Bandieri/, Triq San Pawl, San Pawl il-Bahar

47 other applications within 300 m: 32 granted, 2 refused, 6 pending. 94% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/01181/24).

On Triq ix-Xaghra tal-Bandieri: 5 other applications, 3 granted and 1 refused. Periti active on this street: [Daniel Grima](https://propertylist.mt/perit/daniel-grima).

Approval estimate for demolition & new construction applications like this here: about 94% (likely range 64–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/04161/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04161-24/san-pawl-il-bahar-demolition-of-disused-rooms): Proposed demolition of disused rooms, excavation and construction of basement and semi-basement garage interconnected by a car lift plus overlying terraced… Refused, validated 3 July 2024, 2 floors plus a receded floor, 160 m away
- [**PA/03319/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03319-21/san-pawl-il-bahar-extend-curtilage-of-site-approved-in-pa2476-20): To extend curtilage of site approved in PA2476/20 and dismantle of derelict rooms located within the new curtilage. Proposed modification of layouts and… Status being checked, 167 m away
- [**PA/04033/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04033-23/san-pawl-il-bahar-construction-of-dwelling-with-changes-from-that): Proposed construction of dwelling with changes from that approved in PA3319/21 which includes changes to the internal layout, changes to the levels and to the… Granted, validated 5 July 2023, 1 floor, 170 m away
- [**PA/00661/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00661-24/san-pawl-il-bahar-sanctioning-of-pre-1978-structures-including-the-pre): Proposed sanctioning of pre-1978 structures including the pre-1994 extensions to the same (referred to in EC/01632/96) - the latter have a footprint area… Granted, validated 14 February 2024, 175 m away
- [**PA/05742/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05742-23/san-pawl-il-bahar-extension-to-a-pre-1967-garage): Proposed extension to a pre-1967 garage, the former is visible on the 1978 orthophoto. Granted, validated 4 October 2023, 211 m away
- [**PA/07317/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07317-25/san-pawl-il-bahar-rehabilitation-of-vacant-agricultural-field-that-is): Proposed rehabilitation of vacant agricultural field that is to be included with house approved in PA5741/18 along with repositioning of pool and deck area,… Granted, validated 12 November 2025, 214 m away
- [**PA/02766/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02766-22/san-pawl-il-bahar-sanctioning-from-pa02277-01-of-duplex-penthouse-as): Proposed sanctioning from PA02277/01 of duplex penthouse as built. Sanctioning includes; internal variances in wall layout at both levels, changes in levels… Status being checked, 214 m away
- [**PA/04955/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04955-25/san-pawl-il-bahar-sanction-minor-changes-to-apartment): To sanction minor changes to apartment. Granted, validated 11 September 2025, 215 m away
- [**PA/05165/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05165-26/san-pawl-il-bahar-sanction-site-configuration): To sanction site configuration; additional excavation at rear of site resulting in a larger footprint and the retention of the two and a half feet from… Pending, validated 29 July 2026, 216 m away
- [**PA/05208/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05208-24/san-pawl-il-bahar-demolish-existing-house-and-excavate-one-floor): To demolish existing house and excavate one floor basement level for garages and car spaces, and construct one maisonette at ground floor level, overlying… Granted, validated 7 August 2024, 218 m away
- [**PA/01734/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01734-26/san-pawl-il-bahar-sanction-minor-internal-and-external-changes-from): To sanction minor internal and external changes from approved permit PA7001/05 ‘to demolish existing premises and erect semi-basement garage and overlying… Granted, validated 4 May 2026, 220 m away
- [**PA/03931/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03931-23/san-pawl-il-bahar-internal-alterations-to-approved-layout-at-4th): Internal alterations to approved layout at 4th floor in PA7799/20 to convert 3 x 1 bedroom units into 2 x 3 bedroom units. Granted, validated 22 August 2023, 226 m away
- [**PA/00783/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00783-24/san-pawl-il-bahar-renewal-to-pa9629-18-proposed-modifications-to): Renewal to PA9629/18 - Proposed modifications to permit PA2025/13 to include a common stairwell/lift with access from Triq San Pawl and eliminate access from… Granted, validated 12 April 2024, 5 floors plus a receded floor, 229 m away
- [**PA/08644/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08644-24/san-pawl-il-bahar-apartments-on-site-with-approved-permit-pa-09629-18): Proposed apartments on site with approved permit PA/09629/18 and to include garage floor, 5 apartments on 5 floors and 1 on a receded floor. Granted, validated 24 December 2024, 6 floors plus a receded floor, 231 m away
- [**PA/05611/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05611-25/san-pawl-il-bahar-demolition-of-existing-terraced-house): Demolition of existing terraced house, excavation to create two lock up garages and store at semi basement level, construction of a one bedroom maisonette at… Granted, validated 3 September 2025, 6 floors plus a receded floor, 233 m away

## More by Karl Ebejer

- [**PA/07131/26** Msida](https://propertylist.mt/permit/PA-07131-26/msida-correction-of-site-plan-for-pa-03679-16): Correction of site plan for PA/03679/16. Pending
- [**PA/07010/26** Hamrun](https://propertylist.mt/permit/PA-07010-26/hamrun-demolition-of-existing-first-floor-maisonette-excluding): Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese… Pending, validated 14 October 2026, 4 floors
- [**PA/06307/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06307-26/san-pawl-il-bahar-construction-of-three-additional-full-floors-and): Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and… Pending, validated 16 September 2026, 6 floors plus a receded floor
- [**PA/06122/26** Swieqi](https://propertylist.mt/permit/PA-06122-26/swieqi-extension-to-the-existing-third-floor-penthouse): Proposed extension to the existing third-floor penthouse, including minor internal alterations, the construction of an additional recessed penthouse at… Pending, validated 9 September 2026, 4 floors plus a receded floor
- [**PA/06008/26** Marsaskala](https://propertylist.mt/permit/PA-06008-26/marsaskala-sanctioning-of-changes-from-approved-permits-pa-00889-07): Proposed sanctioning of changes from approved permits PA/00889/07. Granted, validated 24 September 2026
- [**PA/05704/26** Floriana](https://propertylist.mt/permit/PA-05704-26/floriana-sanction-minor-existing-discrepancies-from-approved-drawings): To sanction minor existing discrepancies from approved drawings. Granted, validated 19 August 2026

[All applications by Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)

## More from Alexie Tabone

- [**PA/05040/26** Mosta](https://propertylist.mt/permit/PA-05040-26/mosta-proposal-includes-the-sanctioning-of-a-pre-1967): The proposal includes the sanctioning of a pre-1967 building entrance. The works also comprise the demolition of two maisonettes at first-floor level and one… Pending, validated 22 July 2026, 4 floors plus a receded floor
- [**PA/07164/25** Hamrun](https://propertylist.mt/permit/PA-07164-25/hamrun-demolition-of-internal-walls-and-slabs-at): Proposed demolition of internal walls and slabs at both levels, removal of internal citrus tree; proposed excavation to construct domestic stores at basement… Granted, validated 5 November 2025, 4 floors
- [**PA/01665/25** Hamrun](https://propertylist.mt/permit/PA-01665-25/hamrun-internal-alterations-to-apartments-approved-through-pa-00277-23): Proposed internal alterations to apartments approved through PA/00277/23. Alterations shall change the internal layouts at all levels and include additional… Granted, validated 23 April 2025
- [**PA/05817/23** Qormi](https://propertylist.mt/permit/PA-05817-23/qormi-sanctioning-of-changes-from-pa-05715-21-including): Proposed sanctioning of changes from PA/05715/21 including; changes to facade, front facade built in stone cladding and back facade in plastered white paint,… Granted, validated 4 October 2023
- [**PA/04170/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04170-23/san-pawl-il-bahar-convert-an-existing-hotel-into-a-block): To convert an existing hotel into a block of 27 no. apartments, 3 no. penthouses; domestic stores, games rooms and study at the basement level interconnected… Granted, validated 12 July 2023
- [**PA/00277/23** Hamrun](https://propertylist.mt/permit/PA-00277-23/hamrun-demolition-of-existing-pre-1967-house): Proposed demolition of existing pre-1967 house, whilst retaining the existing front elevation. Proposed excavation of water reservoir to the rear of the site.… Granted, validated 1 February 2023, 4 floors plus a receded floor

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)