> Granted planning application in San Pawl il-Bahar: Alterations to existing facade of building. Addition of 12 apartments and a lift over three levels and…

Planning applications › San Pawl il-Bahar › PA0267823

# PA/02678/23: Alterations to existing facade of building in San Pawl il-Bahar

Conzuelo Flats, Triq San Pawl c/w, Triq San Gorg, San Pawl il-Bahar

Alterations to existing facade of building. Addition of 12 apartments and a lift over three levels and two penthouses on one receded floor.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Conzuelo Flats, Triq San Pawl c/w, Triq San Gorg, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Charles Ebejer](https://propertylist.mt/applicant/charles-ebejer)
- **Perit:** [Perit Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 14
- **Received:** 2 March 2023
- **Validated:** 17 May 2023
- **Published:** 17 May 2023
- **Comments close:** 16 June 2023
- **Recommendation:** Refuse Permission
- **Decision:** Grant Permission
- **Decision date:** 21 November 2023
- **Permit expires:** 3 January 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/02678/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=02678&caseYear=23)

## Planning activity around Conzuelo Flats, Triq San Pawl c/w, Triq San Gorg, San Pawl il-Bahar

125 other applications within 300 m: 76 granted, 2 refused, 19 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/02674/25).

On Triq San Pawl: 91 other applications, 60 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: [JG Periti](https://propertylist.mt/perit/jg-periti), [Edwin Mintoff](https://propertylist.mt/perit/edwin-mintoff), [Maria Schembri Grima](https://propertylist.mt/perit/maria-schembri-grima), [Jean Azzopardi](https://propertylist.mt/perit/jean-azzopardi), [MODEL](https://propertylist.mt/perit/model).

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/02971/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02971-25/san-pawl-il-bahar-minor-internal-alterations): Proposed minor internal alterations, sanctioning of structure at roof level and proposed dismantling of existing enclosed gold aluminium balcony and proposed… Granted, validated 14 May 2025, 14 m away
- [**PA/00846/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00846-25/san-pawl-il-bahar-renewal-of-pa-06295-16-demolition-of-existing): Renewal of PA/06295/16 - Demolition of existing washrooms and construction of duplex unit at 4th and 5th floor from Triq San Pawl. Proposal also include… Granted, validated 12 February 2025, 6 floors, 15 m away
- [**PA/03465/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03465-23/san-pawl-il-bahar-division-of-the-existing-two-bedroom-ground-floor): Proposed division of the existing two-bedroom ground floor apartment into two separate units. A one-bedroom apartment and one-bedroom studio apartment. Granted, validated 16 August 2023, 15 m away
- [**PA/01246/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01246-26/san-pawl-il-bahar-changes-to-approved-permits-pa-06167-24-and-pa-01209): Proposed changes to approved permits PA/06167/24 and PA/01209/25. The changes include the addition of one garage (increasing the total number of garages from… Granted, validated 13 April 2026, 18 m away
- [**PA/01209/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01209-25/san-pawl-il-bahar-demolition-of-existing-property): Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first… Granted, validated 5 March 2025, 19 m away
- [**PA/06167/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06167-24/san-pawl-il-bahar-demolition-of-existing-property): Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first… Granted, validated 9 October 2024, 22 m away
- [**PA/07126/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07126-24/san-pawl-il-bahar-retention-of-facade): Retention of facade, demolition of the existing building and the construction of an office (Class 4A) at ground floor level and six overlying dwelling units. Granted, validated 23 October 2024, 24 m away
- [**PA/06221/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06221-23/san-pawl-il-bahar-renewal-of-pa7049-17-consisting-of-alterations-to): Renewal of PA7049/17 consisting of alterations to PA6143/16 including an additional floor, alterations to layout and modification of single storey apartment… Granted, validated 15 December 2023, 28 m away
- [**PA/03335/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03335-24/san-pawl-il-bahar-new-outdoor-cable-kiosk-to-replace-older): Proposed new outdoor cable kiosk to replace older kiosk to service an existing pumping station. Granted, validated 12 June 2024, 31 m away
- [**PA/05072/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05072-25/san-pawl-il-bahar-application-in-lieu-of-pa7049-17-as-renewed): Proposed application in lieu of PA7049/17 as renewed in PA6221/23 including the demolition of the existing ground floor and reconfiguration of levels to… Granted, validated 6 August 2025, 32 m away
- [**PA/07703/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07703-26/san-pawl-il-bahar-parapet-wall-at-roof-level-to-screen): Proposed parapet wall at roof level to screen roof services on a pre-1967 dwelling, including pv panels. Pending, 36 m away
- [**PA/01264/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01264-26/san-pawl-il-bahar-development-shall-include-alterations-and-additions): The development shall include alterations and additions to the development approved under PA/2674/25, namely: the demolition of the neighbouring two-storey… Suspended, validated 25 February 2026, 3 floors, 40 m away
- [**PA/02674/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02674-25/san-pawl-il-bahar-demolition-of-existing-structure): Demolition of existing structure, and construction of 7 floors of apartments. Granted, validated 23 April 2025, 7 floors, 45 m away
- [**PA/01102/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01102-23/san-pawl-il-bahar-consolidation-of-two-pre-1967-dwellings-into-a): Proposed consolidation of two pre-1967 dwellings into a two bedroom maisonette. The following includes alterations such as opening/closing of openings,… Granted, validated 1 March 2023, 48 m away
- [**PA/00004/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00004-21/san-pawl-il-bahar-construct-two-additional-floors-and-a-receded): To construct two additional floors and a receded floor and internal modifications to existing structure, to create three apartments and a duplex apartment. Granted, validated 13 January 2021, 51 m away

## More by Karl Ebejer

- [**PA/07131/26** Msida](https://propertylist.mt/permit/PA-07131-26/msida-correction-of-site-plan-for-pa-03679-16): Correction of site plan for PA/03679/16. Pending
- [**PA/07010/26** Hamrun](https://propertylist.mt/permit/PA-07010-26/hamrun-demolition-of-existing-first-floor-maisonette-excluding): Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese… Pending, validated 14 October 2026, 4 floors
- [**PA/06307/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06307-26/san-pawl-il-bahar-construction-of-three-additional-full-floors-and): Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and… Pending, validated 16 September 2026, 6 floors plus a receded floor
- [**PA/06122/26** Swieqi](https://propertylist.mt/permit/PA-06122-26/swieqi-extension-to-the-existing-third-floor-penthouse): Proposed extension to the existing third-floor penthouse, including minor internal alterations, the construction of an additional recessed penthouse at… Pending, validated 9 September 2026, 4 floors plus a receded floor
- [**PA/06008/26** Marsaskala](https://propertylist.mt/permit/PA-06008-26/marsaskala-sanctioning-of-changes-from-approved-permits-pa-00889-07): Proposed sanctioning of changes from approved permits PA/00889/07. Granted, validated 24 September 2026
- [**PA/05704/26** Floriana](https://propertylist.mt/permit/PA-05704-26/floriana-sanction-minor-existing-discrepancies-from-approved-drawings): To sanction minor existing discrepancies from approved drawings. Granted, validated 19 August 2026

[All applications by Karl Ebejer](https://propertylist.mt/perit/karl-ebejer)

## More from Charles Ebejer

- [**PA/07010/26** Hamrun](https://propertylist.mt/permit/PA-07010-26/hamrun-demolition-of-existing-first-floor-maisonette-excluding): Demolition of existing first floor maisonette excluding the facade wall. Replacing existing aluminum apertures with pvc apertures and the aluminum Maltese… Pending, validated 14 October 2026, 4 floors
- [**PA/06307/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06307-26/san-pawl-il-bahar-construction-of-three-additional-full-floors-and): Construction of three additional full floors and one receded floor over the existing building, comprising four apartments at each of the fourth and… Pending, validated 16 September 2026, 6 floors plus a receded floor
- [**PA/05599/26** Fgura](https://propertylist.mt/permit/PA-05599-26/fgura-demolition-of-the-existing-first-floor-maisonette-and): Demolition of the existing first-floor maisonette and construction of six apartments and two penthouses over the first, second, third and receded floor… Pending, validated 19 August 2026, 3 floors plus a receded floor
- [**PA/04491/26** Birkirkara](https://propertylist.mt/permit/PA-04491-26/birkirkara-demolition-of-the-existing-garage-and-first-floor): Demolition of the existing garage and first-floor maisonette, excavation of one basement level, and construction of a residential development comprising… Granted, validated 1 July 2026, 4 floors plus a receded floor
- [**PA/04475/26** Gzira](https://propertylist.mt/permit/PA-04475-26/gzira-partial-demolition-of-property-retaining-facade): Partial demolition of property retaining facade. Excavation and construction of 42 underground parking garages, five overlying floors and a receded floor… Suspended, validated 1 July 2026, 5 floors plus a receded floor
- [**PA/02539/26** Birkirkara](https://propertylist.mt/permit/PA-02539-26/birkirkara-demolition-of-the-existing-common-area): Proposed demolition of the existing common area, first floor and roof level, and the construction of new first, second and third floor levels, each consisting… Granted, validated 22 April 2026, 4 floors plus a receded floor

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)