PA/02763/21: demolition and construction of ground floor garage in Paola
70, Triq Hal Saflieni, Paola
Proposed demolition and construction of ground floor garage and overlying one bedroom unit, retaining existing uses and configuration on site. Application proposes retaining existing facade with minor alteration to balcony.
- Status
- Status being checked
- Location
- 70, Triq Hal Saflieni, Paola
- Locality
- Paola
- Applicant
- Mr Robert Hewitt
- Perit
- JG Periti
- Type of works
- Demolition & New Construction (Commercial)
- Height
- 2 floors
- Residential units
- 1
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 70, Triq Hal Saflieni, Paola
222 other applications within 300 m: 149 granted, 7 refused, 17 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/07264/23).
On Triq Hal Saflieni: 5 other applications, 5 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4.
Approval estimate for demolition & new construction applications like this here: about 88% (likely range 58–100%, low reliability, from 19 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/04793/25 Paola: Sanctioning of existing layout, change of use from previous commercial use to two apartments, and minor changes in facade. The latest approved permit on this…
- PA/04923/24 Paola: Sanctioning building as built not as previously approved in PA/03528/95, sanctioning includes internal and external variations after site survey. Proposed…
- PA/04161/26 Paola: Proposed internal alterations on the ground and first floors, and a proposed extension at roof level to the existing pre-1967 townhouse.
- PA/05196/23 Paola: Proposed modifications to approved permit PA2160/20 (Modifications include; shifting of walls and small increase to the washroom area).
- PA/00843/23 Paola: Removal of existing open balcony and reinstating timber balcony as previously installed.
- PA/01820/24 Paola: Proposed demolition of rooms in the backyard, construction of an extension to a townhouse and restoration of the facade.
- PA/08417/24 Paola: To renew PA/00339/20 (Renewal of PA/02691/13) demolition of two dwellings at St. Monica Street, modifications of their facades, construction of Class 4 shop…
- PA/00339/20 Paola: Request for renewal for PA/02691/13 - Demolition of two dwellings at St Monica Street, modifications of their facades, construction of Class 4 shop and…
- PA/04885/25 Paola: To sanction Class 1A dwelling as built from that approved in permit PA/06314/99 of clinic and boutique (Class 4B) including proposed new internal alterations.
- PA/05598/25 Paola: This proposal seeks to carry out minor internal alterations, extend the room at roof level, convert the front room into a garage and to demolish and…
- PA/05586/26 Paola: Change of use from Class 4B shop to residential, interconnection of two units from previous permit PA/00688/16 and proposed minor internal alterations.
- PA/01815/24 Paola: Proposed joining of two properties as a 4B grocer and convenience shop, as well as proposed internal alterations at ground, intermediate and first floor level…
- PA/00833/25 Paola: To open up shop front (Class 4B) approved in PA 9642/19 and fixing of sign.
- PA/00980/22 Paola: To sanction alteration to basement, GF entrance steps and construction of new disabled ramp, replacement of two apertures at GF, replacement of shop sign and…
- PA/00451/25 Paola: To change existing Class 4B use to Class 4D, demolish internal walls and construct a wc. To install signage on facade.
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…