propertylist

PA/02777/24: Replacement of damaged concrete ceiling with new in Santa Venera

47, Marlene garage, Triq Carini, Santa Venera

Replacement of damaged concrete ceiling with new concrete ceiling in same location.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
47, Marlene garage, Triq Carini, Santa Venera
Locality
Santa Venera
Applicant
Mauro Busuttil
Perit
Perit Adrian Buttigieg
Application type
Full development permission
Zone
Within Development Zone
Type of works
Other
Received
16 February 2024
Validated
15 May 2024
Published
15 May 2024
Comments close
14 June 2024
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
29 November 2024
Permit expires
11 December 2029

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 47, Marlene garage, Triq Carini, Santa Venera

123 other applications within 300 m: 77 granted, 4 refused, 18 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/02134/23).

On Triq Carini: 20 other applications, 13 granted and 2 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Rowena Gauci, Stephen Farrugia, Robert Grech.

Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 4 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Adrian Buttigieg

All applications by Adrian Buttigieg

All planning applications in Santa Venera