---
title: "PA/02822/26: sanction property as built from the approved in San Pawl il-Bahar | PropertyList"
url: https://propertylist.mt/permit/PA-02822-26/san-pawl-il-bahar-sanction-property-as-built-from-the-approved
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in San Pawl il-Bahar: To sanction property as built from the approved permit PA/6343/05, mainly including minor internal…

Planning applications › San Pawl il-Bahar › PA0282226

# PA/02822/26: sanction property as built from the approved in San Pawl il-Bahar

Flat No.3 first floor level, 'Water Edge', Triq it-Tonn, San Pawl il-Bahar

To sanction property as built from the approved permit PA/6343/05, mainly including minor internal alterations

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Flat No.3 first floor level, 'Water Edge', Triq it-Tonn, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** Angel Marie Licari
- **Perit:** [Perit Andrea Zerafa](https://propertylist.mt/perit/andrea-zerafa)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Residential units:** 1
- **Received:** 31 March 2026
- **Validated:** 6 July 2026
- **Published:** 6 May 2026
- **Comments close:** 21 May 2026
- **Decision:** Acceptable
- **Permit expires:** 22 July 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/02822/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=02822&caseYear=26)

## Planning activity around Flat No.3 first floor level, 'Water Edge', Triq it-Tonn, San Pawl il-Bahar

70 other applications within 300 m: 45 granted, 2 refused, 9 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/01181/24).

On Triq it-Tonn: 4 other applications, 1 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 11 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07819/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07819-24/san-pawl-il-bahar-proposal-of-minor-alterations-to-existing-structure): Proposal of minor alterations to existing structure including insertion of steel beams and sanctioning of entire apartment since no PB could be found.… Granted, validated 22 January 2025, 15 m away
- [**PA/07389/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07389-26/san-pawl-il-bahar-renew-pa-02227-18-in-order-to-construct-another): To renew PA/02227/18 in order to construct another three levels in order to create an apartment and a duplex apartment. To make minor internal alterations to… Pending, 33 m away
- [**PA/07200/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07200-26/san-pawl-il-bahar-sanctioning-for-the-correction-of-the-property): Sanctioning for the correction of the property outline from the approved permit PA6343/05, small internal and external shifts in walls and apertures, and a… Pending, 42 m away
- [**PA/06211/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06211-23/san-pawl-il-bahar-minor-internal-alterations-to-existing-maisonette-at): Proposed minor internal alterations to existing maisonette at first floor, and including proposed extension to same dwelling, at second floor. Granted, validated 25 October 2023, 3 floors, 45 m away
- [**PA/02382/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02382-23/san-pawl-il-bahar-demolition-of-roof-accretions): Demolition of roof accretions. Construction of 1 penthouse on the second-floor level, 1 duplex penthouse on the second and receded floor levels. Construction… Granted, validated 3 May 2023, 3 floors plus a receded floor, 53 m away
- [**PA/03931/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03931-23/san-pawl-il-bahar-internal-alterations-to-approved-layout-at-4th): Internal alterations to approved layout at 4th floor in PA7799/20 to convert 3 x 1 bedroom units into 2 x 3 bedroom units. Granted, validated 22 August 2023, 57 m away
- [**PA/05611/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05611-25/san-pawl-il-bahar-demolition-of-existing-terraced-house): Demolition of existing terraced house, excavation to create two lock up garages and store at semi basement level, construction of a one bedroom maisonette at… Granted, validated 3 September 2025, 6 floors plus a receded floor, 58 m away
- [**PA/01569/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01569-22/san-pawl-il-bahar-sanction-changes-from-approved-pa3361-00-extension): To sanction changes from approved PA3361/00 - extension in front terrace, internal configuration. Status being checked, 59 m away
- [**PA/00948/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00948-22/san-pawl-il-bahar-sanctioning-existing-property-as-built-from-pa): To sanctioning existing property as built from PA 02955/04. Proposed subdivision of dwelling. Proposed internal and external alterations, demolition and… Status being checked, 59 m away
- [**PA/08644/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08644-24/san-pawl-il-bahar-apartments-on-site-with-approved-permit-pa-09629-18): Proposed apartments on site with approved permit PA/09629/18 and to include garage floor, 5 apartments on 5 floors and 1 on a receded floor. Granted, validated 24 December 2024, 6 floors plus a receded floor, 67 m away
- [**PA/02766/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02766-22/san-pawl-il-bahar-sanctioning-from-pa02277-01-of-duplex-penthouse-as): Proposed sanctioning from PA02277/01 of duplex penthouse as built. Sanctioning includes; internal variances in wall layout at both levels, changes in levels… Status being checked, 69 m away
- [**PA/00783/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00783-24/san-pawl-il-bahar-renewal-to-pa9629-18-proposed-modifications-to): Renewal to PA9629/18 - Proposed modifications to permit PA2025/13 to include a common stairwell/lift with access from Triq San Pawl and eliminate access from… Granted, validated 12 April 2024, 5 floors plus a receded floor, 72 m away
- [**PA/04236/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04236-25/san-pawl-il-bahar-change-of-use-from-existing-maisonette-to): Change of use from existing maisonette to Class (3A) guesthouse construction. Work to include the construction of 3 additional floors and installation of lift. Granted, validated 25 June 2025, 74 m away
- [**PA/03922/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03922-26/san-pawl-il-bahar-sanction-minor-facade-changes-from-pre-1968): To sanction minor facade changes from pre-1968. Pending, validated 10 June 2026, 80 m away
- [**PA/07689/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07689-23/san-pawl-il-bahar-alterations-to-existing-dwelling-consisting-of): Alterations to existing dwelling consisting of; the demolition of roof slabs, internal modifications to existing floors and construction of two new floors… Granted, validated 3 January 2024, 81 m away

## More by Andrea Zerafa

- [**PA/06446/26** Zurrieq](https://propertylist.mt/permit/PA-06446-26/zurrieq-propose-the-conversion-of-the-existing-first-floor): To propose the conversion of the existing first-floor maisonette into an apartment; the demolition of the approved washroom; the construction of two overlying… Pending, validated 23 September 2026, 3 floors plus a receded floor
- [**PA/06408/26** Zabbar](https://propertylist.mt/permit/PA-06408-26/zabbar-rehabilitate-a-pre-1968-dilapidated-townhouse): To rehabilitate a pre-1968 dilapidated townhouse, including the creation of a new garage opening in the front façade, minor internal alterations, the… Pending, validated 23 September 2026
- [**PA/01008/26** Zurrieq](https://propertylist.mt/permit/PA-01008-26/zurrieq-reconfigure-a-dilapidated-townhouse): To reconfigure a dilapidated townhouse, including the demolition of post-1968 accretions and rebuilding other parts of the property, alteration works,… Granted, validated 18 February 2026
- [**PA/07925/25** Naxxar](https://propertylist.mt/permit/PA-07925-25/naxxar-renovation-of-an-existing-townhouse): Renovation of an existing townhouse, including extending the roof structure, adding a 1 car garage, installing a plunge pool at roof level and other internal… Withdrawn, validated 10 December 2025
- [**PA/05975/25** Hamrun](https://propertylist.mt/permit/PA-05975-25/hamrun-sanction-use-of-property-of-class-4b): To sanction use of property of Class 4B and to propose facade alterations including installation of sign. Granted, validated 17 September 2025
- [**PA/05935/25** Hamrun](https://propertylist.mt/permit/PA-05935-25/hamrun-sanction-use-of-property-of-class-4b): To sanction use of property of Class 4B and to propose facade alterations including installation of sign. Granted, validated 17 September 2025

[All applications by Andrea Zerafa](https://propertylist.mt/perit/andrea-zerafa)

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
