PA/02872/23: sanction property from approved PA3888/96 in Hamrun
69, Sqaq il-Kubrit, Hamrun
To sanction property from approved PA3888/96.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 69, Sqaq il-Kubrit, Hamrun
- Locality
- Hamrun
- Applicant
- Mr Charles Pace
- Perit
- Perit Matthew Briffa
- Application type
- Full development permission - Summary Process
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Received
- 21 April 2023
- Validated
- 17 July 2023
- Published
- 24 May 2023
- Comments close
- 8 June 2023
- Decision
- Acceptable
- Permit expires
- 26 July 2028
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 69, Sqaq il-Kubrit, Hamrun
58 other applications within 300 m: 32 granted, 2 refused, 8 pending. 94% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/00124/25).
On Sqaq il-Kubrit: 3 other applications, 2 granted and 0 refused.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07815/26 Hamrun: Internal and external alterations to the ground floor maisonette.
- PA/01868/25 Hamrun: Proposed development including the replacement of the existing closed balcony (aluminum structure) and other minor changes to elements in facade.
- PA/04668/25 Hamrun: To renew PA/04699/19 (To demolish existing first floor and construct apartment at first, second and third floor levels plus overlying domestic stores at…
- PA/05864/26 Hamrun: Proposed introduction of splash pool and retractable canopy at fourth floor and introduction of pv panels at roof level.
- PA/00756/24 Hamrun: To renew approved permit PA732/19 which included minor alterations to approved PA7415/18 and proposed additional level.
- PA/05210/26 Hamrun: Renewal of PA/04780/21 - Proposed extension of existing penthouse to a full floor apartment and construction of new penthouse at setback level plus other…
- PA/01950/21 Hamrun: To construct Class 4A Offices at 5th and penthouse levels, plus alterations to existing stairwell including other additions and alterations. Development had…
- PA/05229/24 Hamrun: Conversion of 1 Class 4A office to 2 Class 4A offices.
- PA/03352/22 Hamrun: Proposed alterations and construction of a lift shaft in common parts and extension to roof level ante-room.
- PA/00963/22 Hamrun: Removal of existing vehicle access ramp and installation of car lift to serve basement parking levels, including internal alterations at basement levels.
- PA/07370/25 Hamrun: Sanctioning of variations from approved permit PA/03007/92. Internal and external alterations to meet fire safety requirements.
- PA/07312/24 Hamrun: Transforming 4 penthouses into 4 apartments and develop 4 new penthouses at roof floor level.
- PA/07826/24 Hamrun: Sanctioning the property as built, which differs from PA/02248/03, and minor internal alterations.
- PA/00580/26 Hamrun: Proposed semi-detached villa, excavation of basement level for the parking of cars and installation of pool at ground floor level.
- PA/01976/26 Hamrun: To construct part of 2nd floor.
More by Matthew Briffa
- PA/07781/26 Zurrieq: Sanctioning of the common area layout as approved under permits PA/1976/25 and PA/1109/98, the demolition of accretions at roof level, and the construction of…
- PA/07715/26 Hamrun: Proposed internal alterations to the approved dwelling RG/360/26, together with the construction of two additional residential units at third and fourth floor…
- PA/07598/26 Zurrieq: To sanction the first-floor apartment as existing and the proposed internal alterations from approved PA/01109/98.
- PA/07583/26 Zabbar: Demolition of the existing terraced house, excavation for six basement garages, and construction of two ground-floor maisonettes, two apartments each on the…
- PA/07459/26 San Pawl il-Bahar: To sanction the internal change of layout as built from the approved RG/00820/18.
- PA/07248/26 Rabat: Change of use pre-1967 residential dwelling to Class 3A guesthouse, which includes internal and external alterations and extension from first floor upwards.
All applications by Matthew Briffa
More from Charles Pace
- PA/07330/26 Zabbar: Renewal of PA8680/17 -To rehabilitate existing dwelling with alteration and additions, to remove accretions, including excavation and demolishing works.
- PA/02700/26 Hamrun: Proposed clearing of site from debris following collapse, removal of fill material up to rock level (as required for structural purposes), and construction of…