propertylist

PA/02875/25: demolition of existing building and excavation of in Ta' Xbiex

Akkwarjumalfa, Triq Testaferrata, Ta' Xbiex

Proposed demolition of existing building and excavation of site. Proposed construction of hotel Class 3B, basement -2 and -1 parking and un/loading back of house, reception and ancillary facilities and breakfast area restaurant Class 4D at ground floor, 44 rooms at 1st-8th floor and pool with sundeck area at roof level.

Status
Pending (Awaiting Recommendation)
Location
Akkwarjumalfa, Triq Testaferrata, Ta' Xbiex
Locality
Ta' Xbiex
Applicant
Michael Bugeja
Perit
JG Periti
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
9 floors
Received
18 November 2024
Validated
7 May 2025
Published
2 September 2026
Comments close
2 October 2026

The public planning file has 64 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Akkwarjumalfa, Triq Testaferrata, Ta' Xbiex

263 other applications within 300 m: 166 granted, 4 refused, 27 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 11 floors (PA/03324/24).

On Triq Testaferrata: 18 other applications, 9 granted and 0 refused; granted buildings are typically 10 floors, the tallest 10. Periti active on this street: Edwin Mintoff, Joseph Bondin, Colin Zammit, David Paul Grima.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 28 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by JG Periti

All applications by JG Periti

More from Michael Bugeja

All planning applications in Ta' Xbiex