propertylist

PA/02893/24: Demolition of existing washroom at fourth floor in San Pawl il-Bahar

95, Triq San Luqa, San Pawl il-Bahar

Demolition of existing washroom at fourth floor level and staircase in common parts, construction of a duplex apartment and a duplex penthouse at receded floor level, construction of a new staircase and installation of lift.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
95, Triq San Luqa, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Ms Maria Luisa Borg
Perit
Perit Alistair Avallone
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
4 floors plus a receded floor
Residential units
2
Received
30 March 2024
Validated
22 May 2024
Published
22 May 2024
Comments close
21 June 2024
Recommendation
Refuse Permission
Decision
Grant Permission
Decision date
25 March 2025
Permit expires
9 April 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 95, Triq San Luqa, San Pawl il-Bahar

229 other applications within 300 m: 140 granted, 9 refused, 27 pending. 94% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq San Luqa: 8 other applications, 6 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: Colin Zammit.

Approval estimate for demolition & new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 23 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Alistair Avallone

All applications by Alistair Avallone

All planning applications in San Pawl il-Bahar