propertylist

PA/02907/22: installation of passenger lift within existing stairwell in Floriana

103, Triq il-Miratur, Floriana

Proposed installation of passenger lift within existing stairwell, excavation for lift pit and change of roof slab over stairwell.

Status
Status being checked
Location
103, Triq il-Miratur, Floriana
Locality
Floriana
Applicant
Mr Dorian Mallia
Perit
Perit Diane M. Psaila
Type of works
Other

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 103, Triq il-Miratur, Floriana

157 other applications within 300 m: 98 granted, 3 refused, 23 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/02172/22).

On Triq il-Miratur: 12 other applications, 7 granted and 0 refused; granted buildings are typically 5 floors, the tallest 6. Periti active on this street: Charlo Briguglio.

More by Diane M. Psaila

All applications by Diane M. Psaila

All planning applications in Floriana