PA/02912/22: interconnection of two adjacent Class 4B shops in Zabbar
Morris Garage & Blessed, Triq Villabate, Zabbar
Proposed interconnection of two adjacent Class 4B shops.
- Status
- Status being checked
- Location
- Morris Garage & Blessed, Triq Villabate, Zabbar
- Locality
- Zabbar
- Applicant
- Mr Daniel Abela
- Perit
- Perit Randolph Nicholas Bartoli
- Type of works
- Other
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Morris Garage & Blessed, Triq Villabate, Zabbar
36 other applications within 300 m: 17 granted, 2 refused, 8 pending. 89% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04372/24).
On Triq Villabate: 33 other applications, 16 granted and 2 refused; granted buildings are typically 3 floors, the tallest 4. Periti active on this street: Charles Buhagiar, Patrick Refalo, Adriana Zammit, JG Periti, Randolph Nicholas Bartoli.
Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/03702/23 Zabbar: Proposed construction of water reservoir and rubble walls, installation of a windmill, sanctioning of rubble walls and soil deposition.
- PA/04635/25 Zabbar: To construct gated access, constructed an underground reservoir and pump room, to construct perimeter rubble walls.
- PA/07008/25 Zabbar: To propose a static 6 m x 3 m billboard.
- PA/03734/26 Zabbar: Proposed four stables including ancillary facilities, including planting of trees, boundary wall, and gate.
- PA/03295/26 Zabbar: To demolish and re-construct pre-1968 agricultural store on same footprint. Proposed roofing of an existing pre-1994 reservoir and construction of a research…
- PA/06922/25 Zabbar: To propose double sided 6 x 3 m canvas billboard with external lighting.
- PA/07546/26 Zabbar: Proposed change of internal uses and layout to farmhouse from that approved in permission PA4564/22, and proposed construction of ancillary garage for private…
- PA/01602/21 Zabbar: Changes in layout to agricultural store approved in PA/3711/19 which include extension to the store, basement and construction of demountable timber structure.
- PA/03725/26 Zabbar: Proposed construction of an agricultural store, pump room and underlying reservoir. Proposal includes the demolition and reconstruction of the front walls,…
- PA/04374/25 Zabbar: Proposed installation of external Illuminated billboard - static billboard with external lighting.
- PA/03277/22 Zabbar: To sanction slight shifting in layout, increase in internal height and changes to openings on facade of agricultural stores approved in PA7554/16.
- PA/02067/22 Zabbar: To sanction existing reservoir. To propose the construction of a greenhouse and roofing over existing reservoir.
- PA/04290/25 Zabbar: Change of use from disturbed land to boatyard (Class 6B), including sanctioning of gate, boundary walls and other additions and alterations.
- PA/04170/26 Zabbar: Proposed installation of billboard (solar powered external illumination).
- PA/02648/22 Zabbar: Internal alterations to an existing terraced house, including removal of wall at ground floor level to accommodate a larger street level garage, construction…
More by Randolph Nicholas Bartoli
- PA/07103/26 Zabbar: Proposed minor internal alterations to dwelling and replacement of roofs.
- PA/06641/26 Xghajra: To sanction garage as built from PA/06629/05.
- PA/06151/26 Zabbar: Demolition of roof structures, proposed formation of lift to serve all levels, alterations at first floor level, construction of second/third/roof level to…
- PA/06061/26 Marsaskala: Proposed placing of pergola on front terrace.
- PA/05874/26 Zabbar: To demolish existing dwelling and excavate site to lower levels and formation of water cistern. Proposed construction of Class 4B shop at ground floor and…
- PA/05596/26 Qormi: Proposed changes to PA/04791/25 to re-design layout of first floor unit and construction of 2 overlying apartments and a receded floor penthouse including…
All applications by Randolph Nicholas Bartoli
More from Daniel Abela
- PA/05874/26 Zabbar: To demolish existing dwelling and excavate site to lower levels and formation of water cistern. Proposed construction of Class 4B shop at ground floor and…
- PA/02780/25 Birzebbuga: To sanction internal alterations to residence (from approved PA/04429/22). Proposed division of house into 2 apartments.