PA/02958/25: construction of a penthouse instead of three in Zurrieq
Vacant Site, Triq San Martin c/w, Triq Zimmermann Barbaro, Zurrieq
Proposed construction of a penthouse instead of three washrooms at the fourth floor level as per PA 0083/21. Proposed minor amendments due to change in building alignment on Triq San Martin as per PC 47/21. Proposed access from the stairwell to the penthouse roof level to be used by apartment’s owners to access their service on the roof. Proposed opening of door apertures from three garages (1, 2 & 4) to the common corridor at ground floor level. Proposed change in the total height of building. Proposed sanctioning of the discovered reservoirs.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Vacant Site, Triq San Martin c/w, Triq Zimmermann Barbaro, Zurrieq
- Locality
- Zurrieq
- Applicant
- Carmel Bondin
- Perit
- Perit Ivan Zammit
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Height
- 5 floors
- Received
- 26 March 2025
- Validated
- 14 May 2025
- Published
- 14 May 2025
- Comments close
- 13 June 2025
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 14 January 2026
- Permit expires
- 28 January 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Vacant Site, Triq San Martin c/w, Triq Zimmermann Barbaro, Zurrieq
157 other applications within 300 m: 93 granted, 1 refused, 18 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03419/25).
On Triq San Martin: 19 other applications, 12 granted and 0 refused; granted buildings are typically 2 floors, the tallest 2.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 39 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02519/25 Zurrieq: To sanction facade apertures of pre-1968 dwelling.
- PA/00919/20 Zurrieq: To sanction differences from PA 2558/13 in view of connect two maisonettes into one maisonette including internal and external alterations.
- PA/07122/26 Zurrieq: Renewal of PA/04878/18 - Proposed first floor extension to house, skylight over central courtyard, room and pool at roof level, demolition of rooms in central…
- PA/01000/26 Zurrieq: To sanction the apartment as built from approved permit PA/02558/13.
- PA/06874/26 Zurrieq: Proposed subdivision of first floor duplex apartment.
- PA/00850/26 Zurrieq: Alterations to a pre-68 property including construction of first floor level, washroom and installation of pv panels at roof level.
- PA/07662/24 Zurrieq: Proposed change of materials of facade in relation to PA/02631/19.
- PA/02156/22 Zurrieq: Proposed alterations and extension to penthouse (within max building height) over block facing two streets. Work to include: Extension of balcony with terrace…
- PA/06585/23 Zurrieq: Proposed renovation of house, including the demolition of some rooms at ground floor and the construction of an extension at first floor and access to roof…
- PA/05818/26 Zurrieq: Proposed internal alteration to a pre-1967 garage.
- PA/05071/23 Zurrieq: Proposed internal & external alterations to existing pre-1967 dwelling, including replacement of ground floor slabs, construction of pool at back of property…
- PA/05965/26 Zurrieq: Proposed change of use from a Class 4B shop to a 1 bedroom maisonette, and sanctioning of internal alterations.
- PA/02070/21 Zurrieq: To sanction apartment with overlying airspace as built, including minor internal and external alterations.
- PA/04385/25 Zurrieq: Proposed construction of single residential unit following outline PA/05430/24. The proposal consists of a basement level, two car street level garage and…
- PA/05430/24 Zurrieq: Proposed terraced house [ Single family unit] in a vacant plot accessed from triq is-Sienja. The site is adjacent to a built 14.1m/17.5m high development…
More by Ivan Zammit
- PA/06778/26 Zurrieq: Proposed demolition of the existing cemetery front boundary wall and the proposed construction of a new front boundary wall.
- PA/00572/22 Zurrieq: Proposed part demolition of existing washroom and proposed construction of two (2) bedrooms, washroom and sanitary facility at third floor level.
- PA/00137/21 Mdina: Refurbishing of playing field. Removal of existing play equipment, safety rubber, concrete paving blocks, kerbs and outdoor furniture. Proposed new internal…
- PA/00083/21 Zurrieq: Proposed construction of four (4) garages and a Class 4B shop at ground floor level, three apartments one overlying the other and three washrooms at roof level.
- PA/00363/20 Birkirkara: Proposed sanctioning of all outdoor units situated within both sides and back curtilages as well as those at roof levels, Internal alterations and additions;…
All applications by Ivan Zammit
More from Carmel Bondin
- PA/03524/25 Vittoriosa (Birgu): Proposed formation of door on facade and installation of metal balcony at first floor level.
- PA/05646/24 Qala: Proposed change of use of private car garage as approved in PA1389/21 to public service car garage.
- PA/05375/24 Cospicua (Bormla): Proposed change of use from living room to Class 4A office at ground floor level, internal alterations and extension of residence at second and third floor…
- PA/00469/23 Zabbar: Proposed demolition of existing property and construction of ground floor garage, 3 apartments and a penthouse.
- PA/00083/21 Zurrieq: Proposed construction of four (4) garages and a Class 4B shop at ground floor level, three apartments one overlying the other and three washrooms at roof level.