# PA/02996/26: internal alterations in Mosta

24, Triq l-Antinni, Mosta

Proposed internal alterations. To sanction variations from PA2961/14.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 24, Triq l-Antinni, Mosta
- **Locality:** [Mosta](https://propertylist.mt/planning-applications/mosta)
- **Applicant:** [Matthew Muscat](https://propertylist.mt/applicant/matthew-muscat)
- **Perit:** [Perit Christian Cuschieri](https://propertylist.mt/perit/christian-cuschieri)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 7 April 2026
- **Validated:** 18 June 2026
- **Published:** 6 May 2026
- **Comments close:** 21 May 2026
- **Decision:** Acceptable
- **Permit expires:** 1 July 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/02996/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=02996&caseYear=26)

## Planning activity around 24, Triq l-Antinni, Mosta

54 other applications within 300 m: 36 granted, 0 refused, 6 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/01656/26).

On Triq l-Antinni: 3 other applications, 3 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 14 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/05950/23** Mosta](https://propertylist.mt/permit/PA-05950-23/mosta-this-application-seeks-to-carry-out-some): This application seeks to carry out some minor internal alterations, demolish existing roof structure, build a new washroom structure, build a small extension… Granted, validated 9 November 2023, 39 m away
- [**PA/03688/25** Mosta](https://propertylist.mt/permit/PA-03688-25/mosta-fibreglass-precast-pool-and-raised-flooring-to): Proposed fibreglass precast pool and raised flooring to backyard. Granted, validated 22 July 2025, 42 m away
- [**PA/01469/23** Mosta](https://propertylist.mt/permit/PA-01469-23/mosta-additions-and-modifications-to-existing-penthouse): Proposed additions and modifications to existing penthouse (PA4063/08) and proposed swimming pool at roof over. Granted, validated 18 April 2023, 79 m away
- [**PA/02130/26** Mosta](https://propertylist.mt/permit/PA-02130-26/mosta-erect-a-side-garden-boundary-wall-as): To erect a side garden boundary wall as per policy for privacy purposes. Pending, validated 22 July 2026, 94 m away
- [**PA/05503/25** Mosta](https://propertylist.mt/permit/PA-05503-25/mosta-sanctioning-of-terraced-house-as-built-in): Sanctioning of terraced house as built in view that previous PAPB number could not be traced. Granted, validated 22 September 2025, 109 m away
- [**PA/03059/26** Mosta](https://propertylist.mt/permit/PA-03059-26/mosta-sanction-property-as-surveyed-including-minor-variations): To sanction property as surveyed including minor variations and changes at all levels from PA2706/05, including change of use of room at ground floor to… Pending, validated 19 August 2026, 110 m away
- [**PA/08099/25** Mosta](https://propertylist.mt/permit/PA-08099-25/mosta-internal-and-external-alterations-to-an-existing): Internal and external alterations to an existing terraced house approved by PA5503/25 consisting of the demolition and extension to the washroom and a pool at… Granted, validated 13 January 2026, 112 m away
- [**PA/07014/23** Mosta](https://propertylist.mt/permit/PA-07014-23/mosta-sanction-changes-from-approved-permit-pb-1723-81-2569-80-includi): To sanction changes from approved permit PB/1723/81/2569/80 including implementing of beams for an open plan at ground floor, walk-in in main bedroom and… Granted, validated 14 February 2024, 115 m away
- [**PA/04092/24** Mosta](https://propertylist.mt/permit/PA-04092-24/mosta-construction-of-a-lift-within-a-lift): Proposed construction of a lift within a lift shaft, including internal and external alterations to the common parts in an existing government Block. Granted, validated 3 July 2024, 132 m away
- [**PA/06529/24** Mosta](https://propertylist.mt/permit/PA-06529-24/mosta-carry-out-internal-alterations-at-second-floor): To carry out internal alterations at second floor, to demolish existing washrooms and to construct extension at third floor level, and to interconnect the two… Granted, validated 25 September 2024, 135 m away
- [**PA/01358/25** Mosta](https://propertylist.mt/permit/PA-01358-25/mosta-demolish-existing-semi-basement): To demolish existing semi-basement, maisonette and apartment and construct 3 car garages, 1 maisonette, 3 apartments and 1 penthouse. Granted, validated 5 March 2025, 136 m away
- [**PA/03947/23** Mosta](https://propertylist.mt/permit/PA-03947-23/mosta-internal-alterations-and-sanctioning-of-solar-panels): Proposed internal alterations and sanctioning of solar panels at roof level. Granted, validated 3 August 2023, 137 m away
- [**PA/03627/21** Mosta](https://propertylist.mt/permit/PA-03627-21/mosta-construction-of-a-lift-shaft-in-common): Proposed construction of a lift shaft in common parts area Status being checked, 138 m away
- [**PA/02269/25** Mosta](https://propertylist.mt/permit/PA-02269-25/mosta-construction-of-lift-and-ramps-to-render): Proposed construction of lift and ramps to render common parts accessible. Granted, validated 22 May 2025, 140 m away
- [**PA/05524/25** Mosta](https://propertylist.mt/permit/PA-05524-25/mosta-alterations-and-construction-of-a-lift-shaft): Proposed alterations and construction of a lift shaft in the common parts. Granted, validated 10 October 2025, 145 m away

## More by Christian Cuschieri

- [**PA/06558/26** Birzebbuga](https://propertylist.mt/permit/PA-06558-26/birzebbuga-demolition-of-existing-building-and-construction-of): Demolition of existing building and construction of 1 no. garages at basement level, 1 no. maisonette at ground floor level, 2 no. apartments at first and… Pending, 4 floors plus a receded floor
- [**PA/05691/26** Mgarr](https://propertylist.mt/permit/PA-05691-26/mgarr-demolition-of-existing-terraced-house): Demolition of existing terraced house, excavation and construction of 4 no. garages at basement level, 1 no. maisonette, and 1no. Class 4B outlet, including… Pending, validated 19 August 2026, 4 floors plus a receded floor
- [**PA/05255/26** Zabbar](https://propertylist.mt/permit/PA-05255-26/zabbar-subdivision-into-2-no): Proposed subdivision into 2 no. separate dwellings. Proposed alterations and to sanction variations from PA6309/23. Proposed restoration of existing facade. Pending, validated 29 July 2026
- [**PA/04918/26** Qormi](https://propertylist.mt/permit/PA-04918-26/qormi-demolition-of-existing-building-and-construction-of): Demolition of existing building and construction of 3 no. garages and 1 no. Class 4B outlet at ground floor level and 3 no. apartments at first, second and… Pending, validated 15 July 2026, 3 floors plus a receded floor
- [**PA/04800/26** Mosta](https://propertylist.mt/permit/PA-04800-26/mosta-sanction-other-internal-and-external-alterations-from): To sanction other internal and external alterations from PA46/23. Granted, validated 26 August 2026
- [**PA/04754/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04754-26/san-pawl-il-bahar-demolition-of-existing-building-and-construction-of): Demolition of existing building and construction of 2 no. garages at ground floor level and 2 no. apartments at first and second floor levels. Suspended, validated 8 July 2026, 3 floors

[All applications by Christian Cuschieri](https://propertylist.mt/perit/christian-cuschieri)

## More from Matthew Muscat

- [**PA/05777/24** Qormi](https://propertylist.mt/permit/PA-05777-24/qormi-change-of-use-of-garage-into-class): Change of use of garage into Class 5B workshop and increasing internal height by lowering the floor. Granted, validated 28 August 2024
- [**PA/03720/24** Siggiewi](https://propertylist.mt/permit/PA-03720-24/siggiewi-demolish-existing-first-floor-and-overlying-wash): To demolish existing first floor and overlying wash room and construct 7 apartments. Granted, validated 29 August 2024
- [**PA/03170/22** Qormi](https://propertylist.mt/permit/PA-03170-22/qormi-sanction-minor-changes-from-approved): To sanction minor changes from approved, and to propose minor alterations at ground and first floor level, an extension at roof level and a new receded floor… Status being checked

[All planning applications in Mosta](https://propertylist.mt/planning-applications/mosta)