---
title: "PA/03020/23: parapet wall and spiral staircase in Rabat (Gozo) | PropertyList"
url: https://propertylist.mt/permit/PA-03020-23/rabat-gozo-parapet-wall-and-spiral-staircase
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Rabat (Gozo): Proposed parapet wall and spiral staircase. Perit Mario Cordina. Validated 31 May 2023.

Planning applications › Rabat (Gozo) › PA0302023

# PA/03020/23: parapet wall and spiral staircase in Rabat (Gozo)

Il migbha, Triq ta' Wara s-Sur, Rabat (Gozo)

Proposed parapet wall and spiral staircase.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Il migbha, Triq ta' Wara s-Sur, Rabat (Gozo)
- **Locality:** [Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
- **Applicant:** [Joseph Cordina](https://propertylist.mt/applicant/joseph-cordina)
- **Perit:** [Perit Mario Cordina](https://propertylist.mt/perit/mario-cordina)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Other
- **Received:** 19 April 2023
- **Validated:** 31 May 2023
- **Published:** 31 May 2023
- **Comments close:** 30 June 2023
- **Recommendation:** Refuse Permission
- **Decision:** Grant Permission
- **Decision date:** 28 November 2023
- **Permit expires:** 10 April 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03020/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03020&caseYear=23)

## Planning activity around Il migbha, Triq ta' Wara s-Sur, Rabat (Gozo)

173 other applications within 300 m: 110 granted, 1 refused, 21 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/01261/23).

On Triq ta' Wara s-Sur: 14 other applications, 10 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: [Cornelia Tabone](https://propertylist.mt/perit/cornelia-tabone), [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Deborah Busuttil](https://propertylist.mt/perit/deborah-busuttil), [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni).

Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00553/25** Rabat (Gozo)](https://propertylist.mt/permit/PA-00553-25/rabat-gozo-renew-permit-pa-06011-19-alterations-to-existing-dwelling): To renew permit PA/06011/19: Alterations to existing dwelling, extension to first floor as well as construction of second and third floor; To change use of… Granted, validated 25 February 2025, 4 floors, 19 m away
- [**PA/04341/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-04341-23/rabat-gozo-sanction-variation-in-facade): To sanction variation in facade, correct site configuration, and propose internal changes to Class 4A, including the orientation of the lift from the… Granted, validated 19 July 2023, 20 m away
- [**PA/01145/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-01145-26/rabat-gozo-change-the-use-from-sitting-room-to): To change the use from sitting room to Class 1D (hairdresser). Granted, validated 25 February 2026, 25 m away
- [**PA/04669/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04669-24/rabat-gozo-excavation-and-construction-of-reservoir): Proposed excavation and construction of reservoir, ground floor garage and 3 overlying apartments. Granted, validated 23 October 2024, 4 floors, 49 m away
- [**PA/03918/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-03918-26/rabat-gozo-internal-alterations): Internal alterations, proposal includes the shifting of walls and designation of rooms. Granted, validated 22 July 2026, 50 m away
- [**PA/05729/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-05729-23/rabat-gozo-renew-pa-03943-18-minor-demolition-at-ground): To renew PA/03943/18 - Minor demolition at ground and first floors. Additions and alterations to existing dwelling consisting of alterations at ground and… Granted, validated 9 November 2023, 3 floors, 50 m away
- [**PA/04382/26** Rabat (Gozo)](https://propertylist.mt/permit/PA-04382-26/rabat-gozo-changes-to-pa5927-24): Proposed changes to PA5927/24. Proposed demolition of existing residences. Proposed construction of 4 garages and 1 Class 4A offices, 24 apartments and… Pending, validated 24 June 2026, 66 m away
- [**PA/05927/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-05927-24/rabat-gozo-changes-to-pa-03088-19-by-changing-layouts-and): Proposed changes to PA/03088/19 by changing layouts and number of units. Proposed 2 garages and 1 Class 4A office at semi-basement, 14 apartments and washroom… Granted, validated 4 September 2024, 66 m away
- [**PA/03697/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-03697-24/rabat-gozo-sanction-change-of-use-from-boutique-to): To sanction change of use from boutique to Class 4B use - butcher and to sanction alterations to facade. Granted, validated 26 June 2024, 66 m away
- [**PA/01049/20** Rabat (Gozo)](https://propertylist.mt/permit/PA-01049-20/rabat-gozo-internal-additions-and-alterations-to-class-4a): Internal additions and alterations to Class 4A office. Status being checked, 66 m away
- [**PA/00852/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-00852-23/rabat-gozo-additions-and-alterations-to-dwelling-house-at): Proposed additions and alterations to dwelling house at first floor level and proposed washroom and stairs to roof. Granted, validated 12 April 2023, 68 m away
- [**PA/01261/23** Rabat (Gozo)](https://propertylist.mt/permit/PA-01261-23/rabat-gozo-demolish-existing-dwelling-and-to-construct-a): To demolish existing dwelling and to construct a terraced house on 5 floors. To also construct a pool. Granted, validated 8 March 2023, 5 floors, 71 m away
- [**PA/04937/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-04937-24/rabat-gozo-minor-alterations-and-extension-at-3rd-floor): Minor alterations and extension at 3rd floor to showroom approved in PA/9845/18. Granted, validated 28 August 2024, 75 m away
- [**PA/00834/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-00834-24/rabat-gozo-reconstruction-of-bastion-wall-and-consolidation): Proposed reconstruction of bastion wall and consolidation; reinstatement of gate, bridge, and railing; and construction of rubble wall and landscaping. Works… Granted, validated 14 February 2024, 76 m away
- [**PA/06332/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-06332-24/rabat-gozo-change-in-use-of-part-of-the): To change in use of part of the existing showroom into a public service garage including minor alterations and variations from building alignment in line with… Granted, validated 25 September 2024, 90 m away

## More by Mario Cordina

- [**PA/06404/26** Birkirkara](https://propertylist.mt/permit/PA-06404-26/birkirkara-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of underground reservoir. Proposed construction of 4 Class 4D shops with signage… Pending, validated 16 September 2026
- [**PA/06289/26** Birkirkara](https://propertylist.mt/permit/PA-06289-26/birkirkara-sanction-changes-from-approved-pa3588-19-consisting-of): To sanction changes from approved PA3588/19 consisting of stairwell at roof level and internal layout changes. Pending, validated 16 September 2026
- [**PA/06015/26** Munxar](https://propertylist.mt/permit/PA-06015-26/munxar-private-swimming-pool-on-roof-and-private): Proposed private swimming pool on roof and private open stairwell to roof. Proposed change from washroom/pantry to bathroom in recessed floor unit. Granted, validated 15 October 2026
- [**PA/05496/26** Qormi](https://propertylist.mt/permit/PA-05496-26/qormi-demolish-existing-dilapidated-factory): To demolish existing dilapidated factory. Proposed excavation and construction of underground reservoir, 9 basement garages and 14 residential units. Pending, validated 19 August 2026, 1 floor
- [**PA/05450/26** Xewkija](https://propertylist.mt/permit/PA-05450-26/xewkija-demolition-of-existing-ruins): Proposed demolition of existing ruins. Proposed excavation and construction of reservoir, ground floor garage and 5 residential units. Pending, validated 5 August 2026, 1 floor
- [**PA/05444/26** Santa Venera](https://propertylist.mt/permit/PA-05444-26/santa-venera-demolition-of-existing-house): Proposed demolition of existing house. Proposed excavation and construction of reservoir, 2 garages and 8 residential units. Pending, validated 5 August 2026, 1 floor

[All applications by Mario Cordina](https://propertylist.mt/perit/mario-cordina)

## More from Joseph Cordina

- [**PA/06015/26** Munxar](https://propertylist.mt/permit/PA-06015-26/munxar-private-swimming-pool-on-roof-and-private): Proposed private swimming pool on roof and private open stairwell to roof. Proposed change from washroom/pantry to bathroom in recessed floor unit. Granted, validated 15 October 2026
- [**PA/01097/26** Munxar](https://propertylist.mt/permit/PA-01097-26/munxar-demolition-of-existing-residence-and-garage): Proposed demolition of existing residence and garage. Proposed construction of 29 residential units, 7 garages and 2 Class 4B shops with signage. Proposed… Granted, validated 25 February 2026

[All planning applications in Rabat (Gozo)](https://propertylist.mt/planning-applications/rabat-gozo)
