> Granted planning application in Fontana: To excavate site, proposed basement garages for private cars; maisonette at ground floor and four flats at first,…

Planning applications › Fontana › PA0304825

# PA/03048/25: excavate site in Fontana

Vacant plot, Triq Mons. Mikiel F. Buttigieg, Fontana

To excavate site, proposed basement garages for private cars; maisonette at ground floor and four flats at first, second, third and receded floor levels.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Vacant plot, Triq Mons. Mikiel F. Buttigieg, Fontana
- **Locality:** [Fontana](https://propertylist.mt/planning-applications/fontana)
- **Applicant:** Wayde Francis Camilleri
- **Perit:** [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Alterations & Extensions (Residential)
- **Height:** 4 floors plus a receded floor
- **Residential units:** 5
- **Received:** 26 March 2025
- **Validated:** 14 May 2025
- **Published:** 14 May 2025
- **Comments close:** 13 June 2025
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 24 February 2026
- **Permit expires:** 11 March 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03048/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03048&caseYear=25)

## Planning activity around Vacant plot, Triq Mons. Mikiel F. Buttigieg, Fontana

8 other applications on the same street: 5 granted, 0 refused, 3 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00457/25).

On Triq Mons. Mikiel F. Buttigieg: 8 other applications, 5 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: [Leonard Spiteri](https://propertylist.mt/perit/leonard-spiteri), [Mannie Galea](https://propertylist.mt/perit/mannie-galea).

- [**PA/07158/26** Fontana](https://propertylist.mt/permit/PA-07158-26/fontana-change-of-use-of-the-two-class): Change of use of the two Class 4A offices at ground-floor level, approved under PA/06591/25, to Class 4B (beautician) and a residential unit. Pending, validated 14 October 2026
- [**PA/05740/26** Fontana](https://propertylist.mt/permit/PA-05740-26/fontana-construction-of-a-ground-floor-garage-and): Construction of a ground floor garage and maisonette, 3 overlying apartments and a penthouse over site covered by PA/00457/25. Pending, validated 19 August 2026, 4 floors plus a receded floor
- [**PA/06591/25** Fontana](https://propertylist.mt/permit/PA-06591-25/fontana-demolish-the-existing-dwelling-and-construct-three): To demolish the existing dwelling and construct three garages and two Class 4A offices at ground-floor level, with five overlying residential units and a… Granted, validated 15 October 2025
- [**PA/04804/25** Fontana](https://propertylist.mt/permit/PA-04804-25/fontana-construct-11-residential-units-with-underlying-garages): To construct 11 residential units with underlying garages at ground floor level. Proposal includes excavation and construction of reservoirs. Granted, validated 12 August 2025
- [**PA/03989/25** Fontana](https://propertylist.mt/permit/PA-03989-25/fontana-excavate-and-to-construct-12-residential-units): To excavate and to construct 12 residential units with underlying garages. Granted, validated 5 July 2025
- [**PA/03192/25** Fontana](https://propertylist.mt/permit/PA-03192-25/fontana-construct-ground-floor-garage-with-overlying-4): To construct ground floor garage with overlying 4 apartments. Granted, validated 21 June 2025, 2 floors
- [**PA/00457/25** Fontana](https://propertylist.mt/permit/PA-00457-25/fontana-construct-ground-floor-garage-with-overlying-3): To construct ground floor garage with overlying 3 flats and 1 penthouse. Granted, validated 29 January 2025, 4 floors plus a receded floor
- [**PA/06280/23** Fontana](https://propertylist.mt/permit/PA-06280-23/fontana-sanction-internal-and-external-alterations-to-flat): To sanction internal and external alterations to flat consisting of changes in floor levels and internal layout from application permit in PA5531/02. Pending, validated 16 February 2024

## More by Vella + Grech Periti

- [**PA/07745/26** Fontana](https://propertylist.mt/permit/PA-07745-26/fontana-excavation-of-site): Proposed excavation of site, garage at basement level; maisonette at ground floor; two flats at first and second floors and receded flat at setback floor… Pending, 3 floors plus a receded floor
- [**PA/07737/26** Xaghra](https://propertylist.mt/permit/PA-07737-26/xaghra-washroom-and-domestic-store-at-roof-level): Proposed washroom and domestic store at roof level to development approved in PA5486/25. Pending
- [**PA/07689/26** Ghajnsielem](https://propertylist.mt/permit/PA-07689-26/ghajnsielem-add-class-6a-at-ground-floor-level): To add Class 6A at ground floor level only, to existing development approved in PA4237/25. Pending, 1 floor
- [**PA/07684/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07684-26/zebbug-gozo-changes-to-existing-facade-at-ground): Changes to existing facade at ground, first and second floor levels; internal alterations in common area and additional floors at third, fourth, fifth and… Pending, 6 floors plus a receded floor
- [**PA/07676/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07676-26/zebbug-gozo-extension-to-pre-1968-dwelling-house-consisting-of): Proposed extension to pre-1968 dwelling house consisting of construction of second floor and washroom. Pending, 3 floors
- [**PA/07661/26** Ghajnsielem](https://propertylist.mt/permit/PA-07661-26/ghajnsielem-extension-to-pre-1968-dwelling): Proposed extension to pre-1968 dwelling, consisting of erection of room at first floor and external stairs. Pending, 2 floors

[All applications by Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)

[All planning applications in Fontana](https://propertylist.mt/planning-applications/fontana)