# PA/03106/24: sanction site configuration in Rabat

No.20, Triq Pierre Muscat, Rabat

To sanction site configuration, internal alterations and alterations to facade. Proposal is to include change of use from Class 4B to 4A, minor internal alterations and alterations to façade.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** No.20, Triq Pierre Muscat, Rabat
- **Locality:** [Rabat](https://propertylist.mt/planning-applications/rabat)
- **Applicant:** Justin Cachia
- **Perit:** [Perit Matthew Gauci](https://propertylist.mt/perit/matthew-gauci)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 8 March 2024
- **Validated:** 29 May 2024
- **Published:** 29 May 2024
- **Comments close:** 28 June 2024
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 5 August 2024
- **Permit expires:** 28 August 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03106/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03106&caseYear=24)

## Planning activity around No.20, Triq Pierre Muscat, Rabat

152 other applications within 300 m: 104 granted, 1 refused, 14 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00561/25).

On Triq Pierre Muscat: 14 other applications, 11 granted and 0 refused; granted buildings are typically 5 floors, the tallest 5. Periti active on this street: [Carmel Farrugia](https://propertylist.mt/perit/carmel-farrugia), [Matthew Gauci](https://propertylist.mt/perit/matthew-gauci), [Mannie Galea](https://propertylist.mt/perit/mannie-galea).

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 38 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00965/25** Rabat](https://propertylist.mt/permit/PA-00965-25/rabat-sanction-minor-internal-modifications-at-the-basement): To sanction minor internal modifications at the basement level and the construction of a low wall along the ramp. Granted, validated 2 April 2025, 33 m away
- [**PA/05312/24** Rabat](https://propertylist.mt/permit/PA-05312-24/rabat-changes-to-elements-in-the-fa-ade-including): Proposed changes to elements in the façade including the replacement of existing apertures and parapet walls. Development also to include the installation of… Granted, validated 25 September 2024, 35 m away
- [**PA/01040/26** Rabat](https://propertylist.mt/permit/PA-01040-26/rabat-demolition-of-existing-premises): Demolition of existing premises, excavation of reservoir, construction of street-level garage, 10 overlying residential units and splash-pool at roof level. Granted, validated 25 February 2026, 1 floor, 41 m away
- [**PA/00070/23** Rabat](https://propertylist.mt/permit/PA-00070-23/rabat-sanction-changes-from-pa-04950-01-mainly-internal-shifting): To sanction changes from PA/04950/01 mainly internal shifting of walls, and to construct back balconies as originally approved in PA/04950/01 but never… Granted, validated 5 April 2023, 41 m away
- [**PA/02736/25** Rabat](https://propertylist.mt/permit/PA-02736-25/rabat-demolition-of-existing-building-and-proposed-construction): Demolition of existing building and proposed construction of domestic stores at basement level and residential units at ground, first, second, third and… Granted, validated 28 May 2025, 4 floors plus a receded floor, 43 m away
- [**PA/04616/25** Rabat](https://propertylist.mt/permit/PA-04616-25/rabat-sanction-an-as-built-apartment-and-washroom-at): To sanction an as-built apartment and washroom at roof level. Granted, validated 16 July 2025, 45 m away
- [**PA/03896/23** Rabat](https://propertylist.mt/permit/PA-03896-23/rabat-sanction-garage-complex-as-built-changes): To sanction garage complex as built - changes from PA/04950/01. Reconstruction of pavement fronting ramp including removal of concrete encroachment on tarmac. Granted, validated 28 June 2023, 48 m away
- [**PA/07977/24** Rabat](https://propertylist.mt/permit/PA-07977-24/rabat-sanctioning-of-internal-alterations-and-subdivision-of): Sanctioning of internal alterations and subdivision of approved dwelling (PA/03145/10) into two residential units. Granted, validated 20 November 2024, 50 m away
- [**PA/00362/24** Rabat](https://propertylist.mt/permit/PA-00362-24/rabat-demolish-existing-terraced-house-and-underlying-garage): To demolish existing terraced house and underlying garage and construct 4 basement garages, 2 maisonettes, 6 apartments and 2 penthouses. Granted, validated 31 January 2024, 51 m away
- [**PA/05195/26** Rabat](https://propertylist.mt/permit/PA-05195-26/rabat-demolish-existing-townhouse-approved-under-rg-01719-24-and): To demolish existing townhouse approved under RG/01719/24 and propose construction of a two storey house with a washroom at roof level and reservoir underneath. Pending, validated 29 July 2026, 2 floors, 55 m away
- [**PA/01523/23** Rabat](https://propertylist.mt/permit/PA-01523-23/rabat-sanction-internal-alterations-to-garage-complex-from): To sanction internal alterations to garage complex from PA04950/01 due to configuration of site. Granted, validated 31 May 2023, 55 m away
- [**PA/02198/26** Rabat](https://propertylist.mt/permit/PA-02198-26/rabat-demolition-of-existing-dwelling): Demolition of existing dwelling (keeping existing facade) and construction of 4 apartments including pool at roof level Pending, validated 1 April 2026, 2 floors plus a receded floor, 57 m away
- [**PA/06081/24** Rabat](https://propertylist.mt/permit/PA-06081-24/rabat-convert-the-existing-basement-level): To convert the existing basement level (pre-1967) into a domestic garage (Class 1) by removing internal partitions and recasting slab above. The removal of… Granted, validated 18 September 2024, 57 m away
- [**PA/06379/24** Rabat](https://propertylist.mt/permit/PA-06379-24/rabat-alterations-to-existing-townhouse): Alterations to existing townhouse. Demolition and shifting of internal walls and staircase, change of use of habitable rooms at basement level to garage for… Withdrawn, validated 6 November 2024, 59 m away
- [**PA/00841/22** Rabat](https://propertylist.mt/permit/PA-00841-22/rabat-alterations-to-facade): Proposed alterations to facade, creation of garage, change of room uses, and internal alterations. Status being checked, 60 m away

## More by Matthew Gauci

- [**PA/07240/26** Sliema](https://propertylist.mt/permit/PA-07240-26/sliema-sanction-variations-from-previously-approved-permit-pa1797-08): To sanction variations from previously approved permit PA1797/08. Pending
- [**PA/07238/26** Sliema](https://propertylist.mt/permit/PA-07238-26/sliema-sanction-variations-from-previously-approved-permit-pa1797-08): To sanction variations from previously approved permit PA1797/08. Pending
- [**PA/07145/26** Mosta](https://propertylist.mt/permit/PA-07145-26/mosta-propose-demolition-of-existing-building-with-retention): Propose demolition of existing building with retention of the facade and excavation of two levels to construct of garages at basement, 1 bedroom unit at… Pending, validated 14 October 2026
- [**PA/07002/26** Birzebbuga](https://propertylist.mt/permit/PA-07002-26/birzebbuga-amendment-to-pa3173-24): Amendment to PA3173/24, to include additional property in the redevelopment of both sites including demolition of existing structures and construction of… Pending, validated 14 October 2026, 3 floors plus a receded floor
- [**PA/06929/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06929-26/san-pawl-il-bahar-sanctioning-of-internal-variations-from-approved-per): Sanctioning of internal variations from approved permit PA/1653/17 (MA), including the reinstatement of the third bedroom in accordance with the layout… Pending
- [**PA/06547/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06547-26/san-pawl-il-bahar-amendment-to-pa-6301-23-previously-approved-in-pa-13): Amendment to PA/6301/23 previously approved in PA/1311/18 including demolition of roof above 5th floor and extension of same floor, construction of 6th floor… Pending, 6 floors plus a receded floor

[All applications by Matthew Gauci](https://propertylist.mt/perit/matthew-gauci)

[All planning applications in Rabat](https://propertylist.mt/planning-applications/rabat)