> Granted planning application in San Pawl il-Bahar: Proposed excavation and construction of 1 garage at ground floor level and construction of 5 apartments…

Planning applications › San Pawl il-Bahar › PA0313524

# PA/03135/24: excavation and construction of 1 garage at in San Pawl il-Bahar

Vacant Land, Triq Burmarrad, Burmarrad, San Pawl il-Bahar

Proposed excavation and construction of 1 garage at ground floor level and construction of 5 apartments from ground floor level upwards, including a penthouse with pool on roof level.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Vacant Land, Triq Burmarrad, Burmarrad, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Peter Vella](https://propertylist.mt/applicant/peter-vella)
- **Perit:** [M&V Architects](https://propertylist.mt/perit/m-and-v-architects)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 5
- **Received:** 23 February 2024
- **Validated:** 29 May 2024
- **Published:** 27 November 2024
- **Comments close:** 6 January 2025
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 4 March 2025
- **Permit expires:** 18 March 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03135/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03135&caseYear=24)

## Planning activity around Vacant Land, Triq Burmarrad, Burmarrad, San Pawl il-Bahar

46 other applications within 300 m: 22 granted, 2 refused, 5 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00219/26).

On Triq Burmarrad: 44 other applications, 21 granted and 2 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: [Charles Buhagiar](https://propertylist.mt/perit/charles-buhagiar), [JG Periti](https://propertylist.mt/perit/jg-periti), [George Farrugia](https://propertylist.mt/perit/george-farrugia), [Gilbert Bartolo](https://propertylist.mt/perit/gilbert-bartolo), [Robert Grech](https://propertylist.mt/perit/robert-grech).

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01197/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01197-23/san-pawl-il-bahar-maintenance-and-re-construction-of-existing-rubble-w): Maintenance and re-construction of existing rubble walls. Removal of existing debris and proposed formation of timber gate. Granted, validated 8 March 2023, 118 m away
- [**PA/01709/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01709-21/san-pawl-il-bahar-sanction-pre-1978-reservoir-as-built): To sanction pre 1978 reservoir as built, proposed deposition of 0.5m depth of soil over existing concrete slab over reservoir, proposed demolition of… Status being checked, 170 m away
- [**PA/01305/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01305-21/san-pawl-il-bahar-sanction-rubble-walls-demarcating-existing-agricultu): To sanction rubble walls demarcating existing agricultural field, ramps formed in agricultural soil, access ramp formed in concrete, installation of timber… Status being checked, 237 m away
- [**PA/08218/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08218-24/san-pawl-il-bahar-demolition-of-existing-dwelling-and-construction-of): Demolition of existing dwelling and construction of terraced house including basement garage and pool. Granted, validated 4 December 2024, 2 floors, 434 m away
- [**PA/04014/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04014-25/san-pawl-il-bahar-installation-of-billboard): Installation of billboard. Refused, validated 18 June 2025, 669 m away
- [**PA/03986/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03986-23/san-pawl-il-bahar-sanction-agriculture-store): To sanction agriculture store, above ground reservoir and rubble wall, deposition of soil. Minor modification to rubble wall and fix timber gate. Withdrawn, validated 5 July 2023, 689 m away
- [**PA/00668/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00668-24/san-pawl-il-bahar-demolition-of-existing-dwelling-and-construction-of): Demolition of existing dwelling and construction of 5 basement garages, maisonette at ground floor and 1 street level garage and overlying 6 apartments, and 2… Granted, validated 7 February 2024, 2 floors plus a receded floor, 946 m away
- [**PA/08220/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-08220-24/san-pawl-il-bahar-sanction-internal-variations-from-approved-pa2888-17): To sanction internal variations from approved PA2888/17. To propose minor internal alterations to flat 2, flat 4 and flat 6 and Class 4B shop. Granted, validated 29 January 2025, 1020 m away
- [**PA/02006/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02006-25/san-pawl-il-bahar-sanction-changes-to-class-4c-bar-approved): To sanction changes to Class 4C bar approved in PA2206/94, including basement ancillary store. Alterations and change of use from Class 4C bar to Class 4B… Granted, validated 2 April 2025, 1023 m away
- [**PA/05576/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05576-26/san-pawl-il-bahar-sanction-external-variations-from-approved-pa2888-17): To sanction external variations from approved PA2888/17. Granted, validated 29 September 2026, 1027 m away
- [**PA/02959/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02959-23/san-pawl-il-bahar-sanction-minor-alterations-at-third-floor-level): To sanction minor alterations at third floor level penthouse. Proposed demolition of roof slab and proposed extension to existing penthouse at third floor… Granted, validated 24 May 2023, 4 floors plus a receded floor, 1048 m away
- [**PA/04666/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-04666-26/san-pawl-il-bahar-demolition-of-existing-dwelling): Demolition of existing dwelling, excavation and construction of 5 basement garages at level -1, construction of 2 Class 4B shops, 6 apartments and 2… Suspended, validated 15 July 2026, 3 floors plus a receded floor, 1060 m away
- [**PA/03908/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-03908-26/san-pawl-il-bahar-sanction-a-garden-centre-with-both-retail): To sanction a garden centre with both retail (Class 4B) and storage and distribution (Class 6A), consisting of: conversion of a greenhouse into a retail… Pending, 1076 m away
- [**PA/06726/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06726-24/san-pawl-il-bahar-sanction-confectionery-shop): To sanction confectionery shop (Class 4B) and bakery as built from that approved in PA/03592/19 and to sanction facade design and fascia sign. Granted, validated 9 October 2024, 1091 m away
- [**PA/02415/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02415-23/san-pawl-il-bahar-change-of-use-from-office-class-4a): Proposed change of use from office Class 4A to retail Class 4B and fixing of sign. Pending, validated 26 April 2023, 1116 m away

## More by M&V Architects

- [**PA/07434/26** Mgarr](https://propertylist.mt/permit/PA-07434-26/mgarr-excavation-and-construction-of-car-spaces-at): Proposed excavation and construction of car spaces at basement level accessible through a car lift. Proposed ground floor level car spaces, 2 units at levels… Pending, 4 floors plus a receded floor
- [**PA/07421/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07421-26/san-pawl-il-bahar-sanction-apartment-under-pa-5974-22-as-built-and): To sanction apartment under PA/5974/22 as built and proposed additional bedroom and internal partition. Pending
- [**PA/06992/26** Swieqi](https://propertylist.mt/permit/PA-06992-26/swieqi-stable): Proposed stable, tack room and paddock. Proposed 100CUM reservoir. Proposed restoration of existing rubble walls. To sanction access ramp. Pending, validated 14 October 2026
- [**PA/06822/26** Mtarfa](https://propertylist.mt/permit/PA-06822-26/mtarfa-sanction-construction-of-garage-and-domestic-store): To sanction construction of garage and domestic store to a pre-1967 dwelling, with an approved permit of PA/3675/94. Pending, validated 7 October 2026
- [**PA/06783/26** Sliema](https://propertylist.mt/permit/PA-06783-26/sliema-class-3a-tourism-accommodation-containing-24-rooms): Proposed Class 3A tourism accommodation containing 24 rooms. Proposed development shall include ancillary facilities such as breakfast area and pool at roof… Pending, validated 7 October 2026, 4 floors plus a receded floor
- [**PA/06735/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06735-26/san-pawl-il-bahar-extension-to-existing-domestic-store-of-penthouse): Proposed extension to existing domestic store of penthouse. Pending

[All applications by M&V Architects](https://propertylist.mt/perit/m-and-v-architects)

## More from Peter Vella

- [**PA/00272/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00272-26/san-pawl-il-bahar-demolition-of-existing-terraced-houses): Proposed demolition of existing terraced houses. Proposed excavation of basement garage and reservoir. Proposed construction of; garages at basement and… Granted, validated 11 March 2026, 1 floor
- [**PA/06701/25** Hamrun](https://propertylist.mt/permit/PA-06701-25/hamrun-alterations-at-ground-floor): Proposed alterations at ground floor. Proposed demolition of existing first floor and washroom at second floor. Proposed retention and restoration of facade,… Granted, validated 15 October 2025, 4 floors plus a receded floor
- [**PA/03177/25** Xaghra](https://propertylist.mt/permit/PA-03177-25/xaghra-excavate-and-to-construct-a-pump-room): To excavate and to construct a pump room with an underlying water reservoir. To also reconstruct rubble walls. Granted, validated 21 May 2025
- [**PA/07126/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07126-24/san-pawl-il-bahar-retention-of-facade): Retention of facade, demolition of the existing building and the construction of an office (Class 4A) at ground floor level and six overlying dwelling units. Granted, validated 23 October 2024
- [**PA/06683/24** Balzan](https://propertylist.mt/permit/PA-06683-24/balzan-1-to-block-off-staircase-from-underlying): 1) To block off staircase from underlying offices to 3rd floor; 2) Change of use from Class 4A to Class 1 and extension of existing receded 3rd floor to full… Granted, validated 2 October 2024, 4 floors
- [**PA/06154/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06154-23/san-pawl-il-bahar-alteration-to-approved-permits-pa3010-22-and-pa2873): Proposed alteration to approved permits PA3010/22 and PA2873/19. Proposed demolition of existing dwellings. Proposed excavation and construction of seven… Granted, validated 14 December 2023, 4 floors plus a receded floor

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)