PA/03152/21: Internal alterations in Pieta
80/81; 35, Triq ix-Xatt, Triq Zammit Clapp, Pieta
Internal alterations, removal of slabs at first floor whilst retaining façades and construction of above lying apartments (9 in number) using a shared common area, including lift. Change of use of ground floor maisonette into a Class 4A Office.
- Status
- Status being checked
- Location
- 80/81; 35, Triq ix-Xatt, Triq Zammit Clapp, Pieta
- Locality
- Pieta
- Applicant
- J & J Holdings Ltd Attn: Mr Josef Dimech
- Perit
- Perit Elena Borg Costanzi
- Type of works
- Change of Use
- Residential units
- 9
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 80/81; 35, Triq ix-Xatt, Triq Zammit Clapp, Pieta
54 other applications on the same street: 26 granted, 5 refused, 7 pending. 84% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/00050/26).
On Triq ix-Xatt: 54 other applications, 26 granted and 5 refused; granted buildings are typically 8 floors, the tallest 8. Periti active on this street: Sapienza & Sullivan, Ruben Sciortino, Maurizio Ascione, Elena Borg Costanzi, William Lewis.
Approval estimate for change of use applications like this here: about 89% (likely range 59–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07013/26 Pieta: To propose a solar-powered, single-sided, externally illuminated billboard at Triq ix-Xatt, Pieta
- PA/06648/26 Pieta: Part demolition of the existing building and construction of an apartment block with a commercial ground floor. Ground floor to be Class 4C (food and drink…
- PA/06574/26 Pieta: To replace collapsed and dilapidated roofs and construct new residential units at second, third and fourth floor.
- PA/05991/26 Pieta: Proposed part change of use from commercial warehouse to part 5A car valeting limited to 50 sqm including office, signage and minor alterations.
- PA/05115/26 Pieta: Dismantling of existing facade and removal of dilapidated building, construction of semi-basement, reconstruction of 4 apartments, and proposed extension of a…
- PA/04752/26 Pieta: To sanction cellar found during works and position of slab above ramp having a different layout from PA8126/24.
- PA/03063/26 Pieta: To sanction internal changes to Class 4B approved in PB851/91. These changes consist of removal of partitions and formation of new ones and an extension at…
- PA/02299/26 Pieta: Change of use from Class 4B shop to a maisonette. Works include the erection of gypsum partitions.
- PA/01207/26 Pieta: Sanctioning of replaced wall at washroom level and the replacement of part of the parapet wall from stone to stone (like with like).
- PA/01792/26 Pieta: To partially excavate the site to the required depth to accommodate the construction of a four level underground car park designated for private vehicle use.…
- PA/07519/25 Pieta: To sanction as built showroom against that approved in PB4560/89 and to sanction as built canopy in the backyard.
- PA/00697/26 Pieta: To sanction use from that approved in PA/4514/18 (Class 4B) to Class 3C (gymnasium) including sanctioning of internal layout and fascia sign.
- PA/00583/26 Pieta: Proposed installation of Internal Illuminated billboard (static billboard with internal lighting).
- PA/00050/26 Pieta: Proposed demolition of existing building, clearing of site and construction of reservoir, parking and Class 4B at ground floor, 21 apartments at 1st-7th floor…
- PA/08249/25 Pieta: To roof over existing terrace and construct an additional overlying penthouse level.
More by Elena Borg Costanzi
- PA/07721/26 Sliema: To develop existing airspace into 2 apartments and to alter some back areas in the existing house to accommodate a further two apartments, adding up to a…
- PA/07477/26 Sliema: Restoration of facades and non-illuminated sign to Class 4A offices on both streets.
- PA/07292/26 Balzan: Introduction of wall lining (low height) at ground floor and first floor, split level at ground floor and to include a small basement discovered during the…
- PA/07044/26 Pembroke: Demolition of existing dwelling, excavation and construction of basement garages, and overlying four apartments and a penthouse at receded level.
- PA/06795/26 Swieqi: To excavate and construct semi-basement garages, Class 4B retail shop including sign and secondary access to garages approved in PA/02370/16, 8 overlying…
- PA/06752/26 St Julians: Proposed facade changes to, materials, railings, and apertures.