propertylist

PA/03162/25: Modification to approved drawings in PA/3920/23 by in St Julians

32, Shaolin, Triq Claire E. Engel, San Giljan

Modification to approved drawings in PA/3920/23 by the addition of a roof overhang on the façade, and an increase in overall building height by one course.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
32, Shaolin, Triq Claire E. Engel, San Giljan
Locality
St Julians
Applicant
Kenneth Scerri
Perit
Perit Louis Borg
Application type
Full development permission - Summary Process
Zone
Within Development Zone
Type of works
New Construction
Received
22 March 2025
Validated
1 July 2025
Published
21 May 2025
Comments close
5 June 2025
Decision
Acceptable
Permit expires
16 July 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 32, Shaolin, Triq Claire E. Engel, San Giljan

21 other applications on the same street: 16 granted, 0 refused, 2 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03920/23).

On Triq Claire E. Engel: 21 other applications, 16 granted and 0 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: Joseph Bondin, Colin Zammit, Michael Anastasi, Roxanne Buttigieg.

Approval estimate for new construction applications like this here: about 94% (likely range 64–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Louis Borg

All applications by Louis Borg

All planning applications in St Julians