> Withdrawn planning application in Qala: Proposed excavation and construction of two terraced houses as per policy P6 ’Transition solutions between DZ edge…

Planning applications › Qala › PA0316824

# PA/03168/24: excavation and construction of two terraced houses in Qala

Site at, Trejqa ta' Hatar, Qala

Proposed excavation and construction of two terraced houses as per policy P6 ’Transition solutions between DZ edge and ODZ'.

- **Status:** Withdrawn (This application for development permission has been withdrawn by the applicant.)
- **Location:** Site at, Trejqa ta' Hatar, Qala
- **Locality:** [Qala](https://propertylist.mt/planning-applications/qala)
- **Applicant:** [Christian Debono](https://propertylist.mt/applicant/christian-debono)
- **Perit:** [Perit Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni)
- **Application type:** Full development permission
- **Zone:** Outside Development Zone
- **Type of works:** New Construction
- **Residential units:** 2
- **Received:** 19 April 2024
- **Validated:** 29 May 2024
- **Published:** 29 May 2024
- **Comments close:** 28 June 2024

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03168/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03168&caseYear=24)

## Planning activity around Site at, Trejqa ta' Hatar, Qala

42 other applications within 300 m: 28 granted, 0 refused, 4 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00982/25).

On Trejqa ta' Hatar: 4 other applications, 2 granted and 0 refused. Periti active on this street: [Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni).

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 5 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00370/21** Qala](https://propertylist.mt/permit/PA-00370-21/qala-addition-of-basement-below-development-approved-in): Addition of basement below development approved in PA/5310/19 Status being checked, 15 m away
- [**PA/02004/21** Qala](https://propertylist.mt/permit/PA-02004-21/qala-sanction-surfacing-of-site-with-sand-like): To sanction surfacing of site with sand like concrete, to construct franka stone walls and to remove existing wide gate and install three new narrow front… Status being checked, 20 m away
- [**PA/00192/25** Qala](https://propertylist.mt/permit/PA-00192-25/qala-carry-out-alterations-and-extensions-to-residential): To carry out alterations and extensions to residential unit approved in PA/05401/06. Alterations include changes to layout. Granted, validated 12 March 2025, 23 m away
- [**PA/06978/24** Qala](https://propertylist.mt/permit/PA-06978-24/qala-remove-car-lift-approved-in-pa-00370-21-and): To remove car lift approved in PA/00370/21 and to carry out other alterations to layout. Granted, validated 20 November 2024, 25 m away
- [**PA/06966/24** Qala](https://propertylist.mt/permit/PA-06966-24/qala-demolish): To demolish, to excavate and to construct a terraced house with a garage at ground floor level. Granted, validated 27 November 2024, 39 m away
- [**PA/00266/20** Qala](https://propertylist.mt/permit/PA-00266-20/qala-demolition-of-existing-structures): Proposed demolition of existing structures. Proposed excavation and construction of basement garage, swimming pool, and 8 apartments. Status being checked, 62 m away
- [**PA/03335/23** Qala](https://propertylist.mt/permit/PA-03335-23/qala-sanction-shifts-in-apartment-plan): To sanction shifts in apartment plan, opening between kitchen and dining, and internal height from the approved drawings in PA/2867/08. Granted, validated 24 July 2023, 105 m away
- [**PA/05751/25** Qala](https://propertylist.mt/permit/PA-05751-25/qala-sanction-extension-to-washroom-and-the-increased): To sanction extension to washroom and the increased height of party wall approved in PA/04886/20. To also enlarge the same washroom approved in PA/04886/20. Granted, validated 3 September 2025, 123 m away
- [**PA/06111/26** Qala](https://propertylist.mt/permit/PA-06111-26/qala-demolish-an-existing-townhouse): To demolish an existing townhouse, excavate and construct a reservoir and a basement below street level and a 30-room Class 3A guesthouse from ground to third… Pending, validated 9 September 2026, 4 floors plus a receded floor, 146 m away
- [**PA/00767/20** Qala](https://propertylist.mt/permit/PA-00767-20/qala-additions-and-alterations-to-vacant-site-approved): Proposed additions and alterations to vacant site approved in PA 2292/13; consisting of extension of third floor to full floor and proposed flat at receded… Status being checked, 4 floors plus a receded floor, 154 m away
- [**PA/01791/26** Qala](https://propertylist.mt/permit/PA-01791-26/qala-developing-of-plot-into-private-vehicle-garage): Developing of plot into private vehicle garage basement at level -1 (one floor below road level). maisonette at ground floor, six 2-bedroom apartment on… Suspended, validated 25 March 2026, 4 floors plus a receded floor, 156 m away
- [**PA/04185/23** Qala](https://propertylist.mt/permit/PA-04185-23/qala-construction-of-2-garages-and-8-residential): Proposed construction of 2 garages and 8 residential units. Granted, validated 22 August 2023, 162 m away
- [**PA/03417/22** Qala](https://propertylist.mt/permit/PA-03417-22/qala-sub-divide-duplex-into-two-flats-by-the): To sub-divide duplex into two flats by the carrying out of minor internal alterations and to increase the number of units from 12 to 13. Granted, validated 25 May 2022, 175 m away
- [**PA/05610/25** Qala](https://propertylist.mt/permit/PA-05610-25/qala-extend-the-site-area-approved-in-pa): To extend the site area approved in PA 7982/24 by demolishing an existing dwelling, to excavate this part of site (under the dwelling) and to construct the… Granted, validated 3 September 2025, 3 floors plus a receded floor, 182 m away
- [**PA/07982/24** Qala](https://propertylist.mt/permit/PA-07982-24/qala-excavate-site-and-proposed-garages-for-private): To excavate site and proposed garages for private cars and Class 4B shop at ground floor level; two flats at first floor; two flats at second floor and two… Granted, validated 27 November 2024, 3 floors plus a receded floor, 185 m away

## More by Alexander Bigeni

- [**PA/07798/26** Nadur](https://propertylist.mt/permit/PA-07798-26/nadur-excavate-and-to-construct-9-residential-units): To excavate and to construct 9 residential units with underlying garages. Pending, 1 floor
- [**PA/07769/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07769-26/san-pawl-il-bahar-carry-out-alterations-and-additions-to-a): To carry out alterations and additions to a pre-1967 a residential dwelling. Alterations include changes to internal layout. Pending
- [**PA/07733/26** Qala](https://propertylist.mt/permit/PA-07733-26/qala-carry-out-alterations-to-internal-layout-and): To carry out alterations to internal layout and to facade of residential units approved in PA/07213/22 and PA/05532/24. To also sanction further excavation… Pending
- [**PA/07652/26** Nadur](https://propertylist.mt/permit/PA-07652-26/nadur-excavate-and-to-construct-an-agricultural-store): To excavate and to construct an agricultural store with an underlying basement. To also construct an underground water reservoir. Pending, 1 floor
- [**PA/07646/26** Xaghra](https://propertylist.mt/permit/PA-07646-26/xaghra-carry-out-alterations-and-extentions-to-dwelling): To carry out alterations and extentions to dwelling approved in PA/06703/22. Alterations include changes to layout and to facade. Pending
- [**PA/07631/26** Ghajnsielem](https://propertylist.mt/permit/PA-07631-26/ghajnsielem-demolish-existing-dwelling): To demolish existing dwelling, to excavate and to construct 12 residential units and 3 shops (Class 4B) with underlying garages. To also install signage. Pending

[All applications by Alexander Bigeni](https://propertylist.mt/perit/alexander-bigeni)

## More from Christian Debono

- [**PA/04316/26** Qormi](https://propertylist.mt/permit/PA-04316-26/qormi-demolish-part-of-existing-buildings): To demolish part of existing buildings, and to dismantle and reconstruct the other parts to create a dwelling unit. Refused, validated 24 June 2026
- [**PA/04276/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04276-26/zebbug-gozo-extend-a-penthouse-into-an-apartment-and): To extend a penthouse into an apartment and construct an overlying set-back unit. Proposal includes alterations to the common staircase area. Also to sanction… Pending, validated 24 June 2026, 4 floors plus a receded floor
- [**PA/01310/26** Birkirkara](https://propertylist.mt/permit/PA-01310-26/birkirkara-additional-bedroom-with-gypsum-partition-at-first): Additional bedroom with gypsum partition at first floor and penthouse level to approved permit PA/05246/16. Granted, validated 27 March 2026
- [**PA/07269/24** Rabat (Gozo)](https://propertylist.mt/permit/PA-07269-24/rabat-gozo-excavate-site): To excavate site, and to construct 3 dwellings with garages for private cars and pools. Proposal includes alterations to an existing garage to connect it to… Pending, validated 23 October 2024
- [**PA/03861/24** Sannat](https://propertylist.mt/permit/PA-03861-24/sannat-excavation-of-site-and-proposed-construction-of): Proposed excavation of site and proposed construction of a house at basement, ground and first floor. Granted, validated 5 February 2025, 2 floors
- [**PA/06833/23** Birkirkara](https://propertylist.mt/permit/PA-06833-23/birkirkara-construct-swimming-pool-at-roof-level-and): To construct swimming pool at roof level and staircase to provide better access to roof level. Granted, validated 18 January 2024

[All planning applications in Qala](https://propertylist.mt/planning-applications/qala)