---
title: "PA/03294/24: Construction of washrooms at roof level including in Mosta | PropertyList"
url: https://propertylist.mt/permit/PA-03294-24/mosta-construction-of-washrooms-at-roof-level-including
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Mosta: Construction of washrooms at roof level including internal amendments over site covered by PA/06858/23. Relocation of…

Planning applications › Mosta › PA0329424

# PA/03294/24: Construction of washrooms at roof level including in Mosta

20 Morning Glory and 24 Cyrean Block, Triq il-Harifa c/w, Triq Ponsonby, Mosta

Construction of washrooms at roof level including internal amendments over site covered by PA/06858/23. Relocation of lift.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 20 Morning Glory and 24 Cyrean Block, Triq il-Harifa c/w, Triq Ponsonby, Mosta
- **Locality:** [Mosta](https://propertylist.mt/planning-applications/mosta)
- **Applicant:** [Ray Cini](https://propertylist.mt/applicant/ray-cini)
- **Perit:** [Perit Mannie Galea](https://propertylist.mt/perit/mannie-galea)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** New Construction
- **Received:** 8 April 2024
- **Validated:** 31 July 2024
- **Published:** 12 June 2024
- **Comments close:** 27 June 2024
- **Decision:** Acceptable
- **Permit expires:** 28 August 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03294/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03294&caseYear=24)

## Planning activity around 20 Morning Glory and 24 Cyrean Block, Triq il-Harifa c/w, Triq Ponsonby, Mosta

166 other applications within 300 m: 115 granted, 7 refused, 11 pending. 94% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/07374/25).

On Triq il-Harifa: 4 other applications, 3 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4.

Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/06858/23** Mosta](https://propertylist.mt/permit/PA-06858-23/mosta-demolition-of-existing-roof-structures): Demolition of existing roof structures. Sanctioning of configuration of site and common parts as built over PA/00863/96. Construction of three third floor… Granted, validated 1 February 2024, 4 floors, 17 m away
- [**PA/04696/23** Mosta](https://propertylist.mt/permit/PA-04696-23/mosta-sanctioning-of-internal-height-of-existing-third): Sanctioning of internal height of existing third floor apartment. Internal and external changes to third-floor apartment approved by PA3371/08 to change it… Granted, validated 9 August 2023, 4 floors plus a receded floor, 20 m away
- [**PA/01416/26** Mosta](https://propertylist.mt/permit/PA-01416-26/mosta-minor-internal-alterations-and-extension-at-roof): Minor internal alterations and extension at roof level including changes to elements in facade, together with variations from the official building alignments. Granted, validated 20 May 2026, 33 m away
- [**PA/08461/20** Mosta](https://propertylist.mt/permit/PA-08461-20/mosta-carry-out-alterations-including-alteration-to-the): To carry out alterations including alteration to the main facade and construction of open balcony. Granted, validated 17 February 2021, 36 m away
- [**PA/00332/23** Mosta](https://propertylist.mt/permit/PA-00332-23/mosta-internal-and-external-alterations-including-raising-of): Proposed internal and external alterations including raising of parapet wall over setback floor level and spiral stairs leading to roof level. Application… Granted, validated 20 March 2023, 39 m away
- [**PA/03477/25** Mosta](https://propertylist.mt/permit/PA-03477-25/mosta-demolish-the-existing-building-and-construct-ground): To demolish the existing building and construct ground floor garages, one (1) Class 4A office, one (1) Class 4B shop, and a proposed sign; to construct six… Granted, validated 11 June 2025, 4 floors plus a receded floor, 40 m away
- [**PA/01819/26** Mosta](https://propertylist.mt/permit/PA-01819-26/mosta-sanction-variations-from-pa-01544-18-as-built): To sanction variations from PA/01544/18 as built. Granted, validated 18 March 2026, 47 m away
- [**PA/05570/26** Mosta](https://propertylist.mt/permit/PA-05570-26/mosta-propose-sanctioning-of-signage-from-previously-approved): To propose sanctioning of signage from previously approved permit PA/06528/18. Granted, validated 11 September 2026, 48 m away
- [**PA/05862/24** Mosta](https://propertylist.mt/permit/PA-05862-24/mosta-sanction-a-sign-on-the-facade): To sanction a sign on the facade. Granted, validated 28 October 2024, 48 m away
- [**PA/06405/25** Mosta](https://propertylist.mt/permit/PA-06405-25/mosta-change-an-existing-commercial-outlet): To change an existing commercial outlet (Class 4B) into a pastizzeria, and to fix a sign and security shutter, and proposed minor internal alterations. Refused, validated 1 October 2025, 55 m away
- [**PA/03082/23** Mosta](https://propertylist.mt/permit/PA-03082-23/mosta-sanction-internal-alterations-to-apartment-with-approved): To sanction internal alterations to apartment with approved permit PA7111/05 together with changes to facade of same property. Granted, validated 24 October 2023, 56 m away
- [**PA/06763/25** Mosta](https://propertylist.mt/permit/PA-06763-25/mosta-change-of-use-from-private-garage-to): Proposed change of use from private garage to public service garage. Granted, validated 22 October 2025, 59 m away
- [**PA/05525/25** Mosta](https://propertylist.mt/permit/PA-05525-25/mosta-construction-of-pool-at-roof-level-over): Construction of pool at roof level over penthouse covered by PA/8803/19. Granted, validated 27 August 2025, 5 floors, 59 m away
- [**PA/07112/23** Mosta](https://propertylist.mt/permit/PA-07112-23/mosta-excavation-and-extension-to-existing-reservoir-in): Proposed excavation and extension to existing reservoir in an existing pre-1967 street level garage. Granted, validated 17 January 2024, 60 m away
- [**PA/05133/23** Mosta](https://propertylist.mt/permit/PA-05133-23/mosta-minor-internal-alterations-including-removal-of-glazed): Minor internal alterations including removal of glazed aluminium structure in backyard. Granted, validated 30 August 2023, 60 m away

## More by Mannie Galea

- [**PA/07794/26** Naxxar](https://propertylist.mt/permit/PA-07794-26/naxxar-excavate-and-construct-a-domestic-store-at): To excavate and construct a domestic store at basement level over site covered by PA/07034/23. Pending
- [**PA/07662/26** Marsa](https://propertylist.mt/permit/PA-07662-26/marsa-alterations-to-a-past-class-4b-shop): Alterations to a past Class 4B shop. Change of use to a Class 4B convenience shop including fixing of internally illuminated sign and a/c’s Pending
- [**PA/07522/26** Birkirkara](https://propertylist.mt/permit/PA-07522-26/birkirkara-sanctioning-of-internal-alterations-to-a-class): Sanctioning of internal alterations to a Class 4A office for use of a Class 4B (EMS) - electrical muscle stimulation studio. Pending
- [**PA/07488/26** Rabat](https://propertylist.mt/permit/PA-07488-26/rabat-sanctioning-of-an-agricultural-store): Sanctioning of an agricultural store. Pending, validated 28 October 2026
- [**PA/07454/26** Birkirkara](https://propertylist.mt/permit/PA-07454-26/birkirkara-change-of-use-of-a-garage-into): Change of use of a garage into a Class 4B salon including alterations, fixing of internally illuminated sign and a/c. Pending, validated 28 October 2026
- [**PA/07356/26** Birkirkara](https://propertylist.mt/permit/PA-07356-26/birkirkara-renewal-to-pa-04630-18-formation-of-a): Renewal to PA/04630/18 - Formation of a shower room and fixing of an internal partition at first floor level. Demolition pf existing third floor penthouse;… Pending, validated 21 October 2026, 4 floors plus a receded floor

[All applications by Mannie Galea](https://propertylist.mt/perit/mannie-galea)

## More from Ray Cini

- [**PA/07587/23** Marsa](https://propertylist.mt/permit/PA-07587-23/marsa-outline-application-to-demolish-existing-structure-and): Outline application to demolish existing structure and construct a ground floor maisonette, two overlying apartments and one receded penthouse. Granted, validated 20 December 2023, 3 floors plus a receded floor
- [**PA/06858/23** Mosta](https://propertylist.mt/permit/PA-06858-23/mosta-demolition-of-existing-roof-structures): Demolition of existing roof structures. Sanctioning of configuration of site and common parts as built over PA/00863/96. Construction of three third floor… Granted, validated 1 February 2024, 4 floors

[All planning applications in Mosta](https://propertylist.mt/planning-applications/mosta)
