propertylist

PA/03304/24: Demolition of the existing commercial premises in Swieqi

47, Torre Paulina, Triq il-Madliena c/w, Triq ix-Xiber, Swieqi

Demolition of the existing commercial premises, and construction of 3 fully detached Villas.

Status
Withdrawn (This screening request has been withdrawn.)
Location
47, Torre Paulina, Triq il-Madliena c/w, Triq ix-Xiber, Swieqi
Locality
Swieqi
Applicant
Tempesta Limited Attn: Neil Psaila
Perit
Dr Edwin Mintoff
Type of works
Demolition & New Construction (Commercial)
Residential units
3
Received
5 April 2024

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 47, Torre Paulina, Triq il-Madliena c/w, Triq ix-Xiber, Swieqi

81 other applications within 300 m: 54 granted, 2 refused, 6 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/03116/25).

On Triq il-Madliena: 21 other applications, 11 granted and 2 refused; granted buildings are typically 2 floors, the tallest 2. Periti active on this street: Japheth Luke Borg, Elena Borg Costanzi, Damian Vella Lenicker, Anthony Fenech Vella, Kerstien Micallef.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Edwin Mintoff

All applications by Edwin Mintoff

More from Tempesta Ltd

All planning applications in Swieqi