PA/03363/22: sanction washroom built with a different layout in Zabbar
Orion Flats, 9, Triq Lia, Zabbar
To sanction washroom built with a different layout to that approved in PA05314/05; to construct roofed area adjacent to existing washroom.
- Status
- Status being checked
- Location
- Orion Flats, 9, Triq Lia, Zabbar
- Locality
- Zabbar
- Applicant
- Mr Mario Sciberras
- Perit
- Perit Wallace Farrugia
- Type of works
- Sanctioning
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Orion Flats, 9, Triq Lia, Zabbar
177 other applications within 300 m: 114 granted, 4 refused, 19 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/00167/25).
On Triq Lia: 21 other applications, 13 granted and 1 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Randolph Nicholas Bartoli, Patrick Refalo.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, medium reliability, from 48 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/07501/24 Zabbar: Sanctioning of existing dwelling from approved PA/06414/19. Changes include - slight shift in wall layouts resulting in existing property being slightly…
- PA/00753/26 Zabbar: Proposed internal alterations at first-floor level, extension of the existing second floor, and construction of an additional floor at roof level.
- PA/02881/24 Zabbar: To demolish existing townhouse and construct a street level garage, 3 apartments and a penthouse at a receded floor level.
- PA/00913/24 Zabbar: Correction of site from that approved in PA/05946/99.
- PA/06586/24 Zabbar: Demolition of existing structure, dismantling and reconstruction of existing architectural features including niche, gavda moulding, hallway arch and…
- PA/00622/26 Zabbar: Proposed extension at second floor, replacement of roof over second floor, facade alteration to form garage door and internal changes.
- PA/02086/24 Zabbar: Construction of domestic store at roof level.
- PA/01709/23 Zabbar: Proposed construction of domestic store at roof level.
- PA/06870/25 Zabbar: To demolish existing, and propose 6 garages at basement level, Class 4B shop and 2 maisonettes at ground floor, 9 apartments at first, second and third, and…
- PA/05807/25 Zabbar: To sanction differences from PA2824/15 mainly correction of site layout following survey, shifting of internal walls, roofing of part of yards, extension of…
- PA/03415/26 Zabbar: Proposed construction of basement garage for parking of private vehicles, Class 4A unit for professional services at ground floor, three residential units…
- PA/01039/23 Zabbar: To sanction differences from PA2824/15 mainly correction of site layout following survey, shifting of internal walls, roofing of part of yards, extension of…
- PA/01591/24 Zabbar: To demolish existing residential unit and construct garage at basement level, class 4B shop and garage at ground floor level, six apartments at first, second…
- PA/02534/23 Zabbar: Proposed demolition and reconstruction of staircase, proposed demolition of washroom, proposed alterations at first floor, extension at second and third floor…
- PA/01938/23 Zabbar: Change of use from approved Class 4B retail to proposed Class 4A office and sanctioning of the as built internal layout in gypsum/aluminum partition walls.
More by Wallace Farrugia
- PA/07726/26 Swieqi: Change of use from office to two residential maisonettes, sanctioning railing at street level and proposed alterations.
- PA/06995/26 Paola: Installation of telecommunications equipment and safety railing.
- PA/06748/26 Qormi: Internal and external alterations to layouts approved in PA/02137/18, including redesign of common area and addition of lift; extension of unit 2 at second…
- PA/05960/26 Qormi: Internal alterations to existing stairwell, demolition of existing mezzanine level above first floor and construction of additional warehousing unit (Class…
- PA/04058/26 Rabat: Installation of telecommunications mast and pole.
- PA/03875/26 St Julians: Sanctioning of variations to previous approved PA/3152/22 and installation of new lift in common parts.
All applications by Wallace Farrugia
More from Mario Sciberras
- PA/02212/26 Naxxar: To sanction minor changes from PA/05544/23 and proposed new construction of four new residential unit from first floor upwards.
- PA/03027/24 San Gwann: To propose demolition of existing terraced house, excavation for reservoir and 3 garages at semi basement and construction of maisonette, 3 apartments and…
- PA/05544/23 Naxxar: Demolition of existing property; excavation for semi basement garage, construction of garage and overlying maisonette.
- PA/03822/23 Attard: Sanctioning of existing basement, ground and first floor level from PB/00850/79. Proposed minor internal alterations to basement level and alterations to…
- PA/00587/22 Xaghra: To sanction refurbishment of licensed fixed kiosk including the placing of tables, chairs and umbrellas. Changes consist in roofing of yard and replacing of…
- PA/03268/21 Xaghra: To relocate the site for reservation of land for use of hawker (sunbeds and umbrellas), from site previously approved in PA 4556/15.