PA/03462/26: Demolition of first floor maisonette and construction in San Pawl il-Bahar
15, Triq Toni Bajada, San Pawl il-Bahar
Demolition of first floor maisonette and construction of 5 one-bedroom units.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 15, Triq Toni Bajada, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Daryl Borg
- Perit
- Perit Kurt Camilleri Burlo'
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Demolition & New Construction (Residential)
- Height
- 1 floor
- Residential units
- 5
- Received
- 17 April 2026
- Validated
- 27 May 2026
- Published
- 27 May 2026
- Comments close
- 26 June 2026
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 26 October 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 15, Triq Toni Bajada, San Pawl il-Bahar
167 other applications within 300 m: 98 granted, 10 refused, 23 pending. 91% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/06087/24).
On Triq Toni Bajada: 12 other applications, 6 granted and 1 refused.
Approval estimate for demolition & new construction applications like this here: about 94% (likely range 64–100%, low reliability, from 14 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/04097/26 San Pawl il-Bahar: Modifications to balcony dimensions as approved in PA/06184/19.
- PA/03918/23 San Pawl il-Bahar: To sanction changes from approved permit PA1349/95.
- PA/03368/24 San Pawl il-Bahar: Sanctioning of minor variations in Class 4B shop from plans approved in PA01349/95, including relocation of toilet facilities and erection of light-weight…
- PA/00538/22 San Pawl il-Bahar: Change of use to Class 4B unit, alterations works and installation of sign.
- PA/00832/20 San Pawl il-Bahar: To sanction minor external finishes to facade.
- PA/06212/24 San Pawl il-Bahar: Proposed alterations to PA/02702/16 and PA/03972/19. The latter includes subdivision of unit into two, and internal wall configuration of all.
- PA/07428/23 San Pawl il-Bahar: Proposed greengrocer to approved Class 4B. Application includes minor internal and external alterations.
- PA/06087/24 San Pawl il-Bahar: To carry out alterations at first floor level and to construct overlying apartments from second floor level to seventh floor level.
- PA/02574/24 San Pawl il-Bahar: To demolish 2no dwellings and construct 2no garages and 2no maisonettes at ground floor level and 12no apartments at first, second, third, fourth, fifth and…
- PA/00079/21 San Pawl il-Bahar: Minor internal alterations to existing maisonette
- PA/05163/24 San Pawl il-Bahar: To convert a pre-1967 property to a Class 4A office space including storage space. The proposal shall include the installation of new apertures and a sign on…
- PA/02844/25 San Pawl il-Bahar: Proposed alterations to create a common basement garage (6no 1 car and 3no 2 car) and retaining the same layouts of the overlying two apartment blocks with a…
- PA/01820/25 San Pawl il-Bahar: Proposed demolition of existing and proposed construction of 3 duplex apartments.
- PA/00881/25 San Pawl il-Bahar: Minor alterations from PA 6104/98 and change of use of first floor shop from Class 4B (sale of appliances) to Class 4A (office).
- PA/05730/26 San Pawl il-Bahar: Proposed construction of a storage room on the first floor level above ground floor level garage.
More by Kurt Camilleri Burlo'
- PA/07423/26 Zebbug: To sanction correction to site boundary wall and pavement alignment approved in PA1292/19 and addition of planter.
- PA/06522/26 Santa Venera: Demolition of apartment and construction of two 3-bed flats and one penthouse and construction of lift.
- PA/05168/26 Kirkop: Demolition of existing terraced house, excavation and construction of 3 lock up garages, one three-bed maisonette, six two bed flats and one three bed…
- PA/04637/26 Balzan: Changes to lift shaft size approved in PA6791/24 and construction of washroom and addition of steel railings at roof level.
- PA/04196/26 Marsa: Change of use from ancillary stores to jockey restrooms.
- PA/03999/26 Sliema: Replacement of closed Timber balcony with pvc material, minor internal changes and sanctioning of awning at roof level.
All applications by Kurt Camilleri Burlo'
More from Daryl Borg
- PA/06540/26 San Pawl il-Bahar: To make alterations to existing common parts including the installation of lift at first floor level. To make alterations to existing third floor level,…
- PA/06522/26 Santa Venera: Demolition of apartment and construction of two 3-bed flats and one penthouse and construction of lift.
- PA/02074/26 San Pawl il-Bahar: Construction of 1 x 2-bedroom flat and 1 x 1 bedroom penthouse over existing block of flats and variation from the official alignment.
- PA/04826/25 San Pawl il-Bahar: Construction of 1 x 2-bedroom flat and 1 x 1 bedroom penthouse over existing block of flats.
- PA/04030/25 Fgura: Excavation of basement level and construction of 2 (in no.) Class 4B shops, 3 (in no.) two bedroom flats, 3 (in no.) one-bedroom flats, and 1 (in no.)…
- PA/01674/21 Attard: To construct semi-detached villa and underlying basement garage