> Granted planning application in Zebbug (Gozo): Proposed flat at fifth floor level. Perit Vella + Grech Periti. Validated 28 July 2026.

Planning applications › Zebbug (Gozo) › PA0346926

# PA/03469/26: flat at fifth floor level in Zebbug (Gozo)

Seaside Apartments, Triq ir-Rabat, Marsalforn, Zebbug (Gozo)

Proposed flat at fifth floor level.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Seaside Apartments, Triq ir-Rabat, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** Sonia Theuma
- **Perit:** [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Other
- **Residential units:** 1
- **Received:** 28 April 2026
- **Validated:** 28 July 2026
- **Published:** 3 June 2026
- **Comments close:** 18 June 2026
- **Decision:** Acceptable
- **Permit expires:** 19 August 2031

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03469/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03469&caseYear=26)

## Planning activity around Seaside Apartments, Triq ir-Rabat, Marsalforn, Zebbug (Gozo)

135 other applications within 300 m: 85 granted, 0 refused, 6 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/00494/24).

On Triq ir-Rabat: 21 other applications, 14 granted and 0 refused; granted buildings are typically 5 floors, the tallest 6. Periti active on this street: [Annamaria Attard Montalto](https://propertylist.mt/perit/annamaria-attard-montalto), [Joseph Stellini](https://propertylist.mt/perit/joseph-stellini), [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Saviour Micallef](https://propertylist.mt/perit/saviour-micallef), [Mariella Xuereb](https://propertylist.mt/perit/mariella-xuereb).

Approval estimate for other applications like this here: about 94% (likely range 64–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00808/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00808-22/zebbug-gozo-demolish-an-existing-guesthouse-and-bar-spread): To demolish an existing guesthouse and bar spread over four floors. To excavate a basement level and construct a Class 4D restaurant and a Class 3A guesthouse… Status being checked, 6 floors, 13 m away
- [**PA/05651/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05651-25/zebbug-gozo-carry-out-alterations-to-residential-units-approved): To carry out alterations to residential units approved in PA/07599/18 which have not been built yet. Alterations include changes to layout, to facade and to… Granted, validated 3 September 2025, 30 m away
- [**PA/04826/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04826-23/zebbug-gozo-sanction-minor-internal-alterations-from-previously-approv): To sanction minor internal alterations from previously approved in PA5375/07. Granted, validated 5 October 2023, 30 m away
- [**PA/04145/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04145-25/zebbug-gozo-carry-out-internal-and-external-modifications-including): To carry out internal and external modifications including the replacing of ceiling and the demolition and reconstruction of the facade. Granted, validated 12 August 2025, 32 m away
- [**PA/03505/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03505-25/zebbug-gozo-renew-permission-pa3495-17-to-amend-permission): To renew permission PA3495/17 - To amend permission PA317/14 by demolishing and re-constructing exact replica of damaged facade on ground and first floor and… Granted, validated 13 June 2025, 2 floors, 32 m away
- [**PA/01782/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01782-26/zebbug-gozo-add-4-apartments-and-2-penthouses-over): To add 4 apartments and 2 penthouses over existing 4-storey block. Granted, validated 27 May 2026, 6 floors, 38 m away
- [**PA/00524/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00524-22/zebbug-gozo-construct-two-additional-flats-at-third-and): To construct two additional flats at third and fourth floor. Status being checked, 5 floors, 39 m away
- [**PA/06029/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06029-26/zebbug-gozo-carry-out-additions-and-alterations-to-the): To carry out additions and alterations to the development previously approved under permits PA/4705/23, PA 3003/14 and PA/3342/10, comprising of Class 1,… Pending, validated 2 September 2026, 40 m away
- [**PA/01458/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01458-24/zebbug-gozo-construct-penthouse-at-fifth-floor): To construct penthouse at fifth floor. Granted, validated 6 June 2024, 6 floors, 40 m away
- [**PA/01323/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01323-24/zebbug-gozo-construct-two-additional-flats-at-third-and): To construct two additional flats at third and fourth floor and installation of lift. Granted, validated 22 May 2024, 5 floors, 40 m away
- [**PA/05402/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05402-24/zebbug-gozo-area-for-tables-and-chairs-enclosed-by): Area for tables and chairs enclosed by semi-permanent canopy. Granted, validated 28 August 2024, 42 m away
- [**PA/01462/21** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01462-21/zebbug-gozo-minor-internal-alterations-and-alterations-to-facade): Minor internal alterations and alterations to facade. Status being checked, 42 m away
- [**PA/01459/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01459-24/zebbug-gozo-construct-penthouse-at-receded-floor-level): To construct penthouse at receded floor level. Granted, validated 19 June 2024, 46 m away
- [**PA/02167/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02167-23/zebbug-gozo-sanctioning-of-minor-variations-from-the-approved): Sanctioning of minor variations from the approved permit (PA 4426/17). Variations include shifting of walls and apertures along the façade as well as a… Granted, validated 6 June 2023, 47 m away
- [**PA/06721/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06721-26/zebbug-gozo-demolish-existing-building): To demolish existing building, retaining facade and construct ground floor shop (Class 4B) with overlying 3 units and washrooms. Pending, validated 30 September 2026, 2 floors, 49 m away

## More by Vella + Grech Periti

- [**PA/07745/26** Fontana](https://propertylist.mt/permit/PA-07745-26/fontana-excavation-of-site): Proposed excavation of site, garage at basement level; maisonette at ground floor; two flats at first and second floors and receded flat at setback floor… Pending, 3 floors plus a receded floor
- [**PA/07737/26** Xaghra](https://propertylist.mt/permit/PA-07737-26/xaghra-washroom-and-domestic-store-at-roof-level): Proposed washroom and domestic store at roof level to development approved in PA5486/25. Pending
- [**PA/07689/26** Ghajnsielem](https://propertylist.mt/permit/PA-07689-26/ghajnsielem-add-class-6a-at-ground-floor-level): To add Class 6A at ground floor level only, to existing development approved in PA4237/25. Pending, 1 floor
- [**PA/07684/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07684-26/zebbug-gozo-changes-to-existing-facade-at-ground): Changes to existing facade at ground, first and second floor levels; internal alterations in common area and additional floors at third, fourth, fifth and… Pending, 6 floors plus a receded floor
- [**PA/07676/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07676-26/zebbug-gozo-extension-to-pre-1968-dwelling-house-consisting-of): Proposed extension to pre-1968 dwelling house consisting of construction of second floor and washroom. Pending, 3 floors
- [**PA/07661/26** Ghajnsielem](https://propertylist.mt/permit/PA-07661-26/ghajnsielem-extension-to-pre-1968-dwelling): Proposed extension to pre-1968 dwelling, consisting of erection of room at first floor and external stairs. Pending, 2 floors

[All applications by Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti)

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)