PA/03497/21: construction of additional intermediate floor offices Class in Qormi
8, Triq Hal Luqa, Qormi
Proposed construction of additional intermediate floor offices Class 4A within development approved by PA8924/19 and minor changes to external finishes.
- Status
- Status being checked
- Location
- 8, Triq Hal Luqa, Qormi
- Locality
- Qormi
- Applicant
- Mr Philip Agius
- Perit
- JG Periti
- Type of works
- New Construction (Commercial)
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 8, Triq Hal Luqa, Qormi
11 other applications within 300 m: 9 granted, 0 refused, 1 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00863/23).
On Triq Hal Luqa: 11 other applications, 9 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: JG Periti, George Farrugia.
Approval estimate for new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 1 comparable decision nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/03455/26 Qormi: Proposed alterations to facade of pre-1967 garage and to construct shower room in back yard and horizontal subdivision of garage (to create storage space)…
- PA/00099/26 Qormi: Proposed removal of cladding as approved by PA5295/23 and to sanction other minor changes.
- PA/05295/23 Qormi: Proposed internal layout of storage (Class 6A) at basement, relocation of toilets, change of part use retail (Class 4B), placing of tables and chairs at…
- PA/05531/24 Qormi: To construct an additional room and a pool at second floor level, as well as to raise the parapet wall to 1m at roof floor level as well as minor internal and…
- PA/02077/25 Qormi: To sanction fuel station (as built) including but not limited to sanctioning of basement garage, ground floor show room and first floor class 4A offices and…
- PA/03138/26 Qormi: To demolish first floor maisonette and construct 5 apartments and overlying penthouse at receded level.
- PA/00894/21 Qormi: Construction of washroom and domestic store at 3rd and 4th floor level
- PA/00863/23 Qormi: Changes to approved permit PA/09417/19 at third floor, extension of floor at receded floor level to create a separate duplex unit at 3rd and fourth floor.
- PA/04427/25 Qormi: To sanction extension of existing premises at ground floor level [utilised for car parking].
- PA/00542/26 Qormi: The proposal involves demolishing the existing houses, carrying out excavation works, and constructing a new building with one basement level, four floors,…
- PA/02148/24 Qormi: Demolition of existing structures and construction of 2 Class 4B shops with u/l storage including fixing of signs and a/c’s; 6 apartments and 2 penthouses.
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…
More from Philip Agius
- PA/05298/26 Zebbug: Proposed sanctioning of existing building to that approved in PA3723/94. Proposal includes variations from the official building alignments.
- PA/08272/25 Zebbug: To sanction minor internal alterations at basement -1 level and minor alterations at third floor level, and proposed changes of approved aperture on the…
- PA/07014/25 Mqabba: Alterations and extention to pre-1967 dwelling including garage on Triq ix-Xriek.
- PA/00465/21 San Pawl il-Bahar: To propose the construction of a French opening in an existing apartment block and the removal of the A.C extractor from the facade.