PA/03530/21: sanction change of use from retail in Luqa
SML Blu Building, Triq Hal Qormi c/w Triq l-Astun Iswed, Triq id-Daqquqa Kahla, Luqa
To sanction change of use from retail (4B) to offices (4A) and classroom/training room ancillary to same offices. Proposed minor alterations to front elevation.
- Status
- Status being checked
- Location
- SML Blu Building, Triq Hal Qormi c/w Triq l-Astun Iswed, Triq id-Daqquqa Kahla, Luqa
- Locality
- Luqa
- Applicant
- Mr Saviour Magro
- Perit
- JG Periti
- Type of works
- Sanctioning
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around SML Blu Building, Triq Hal Qormi c/w Triq l-Astun Iswed, Triq id-Daqquqa Kahla, Luqa
33 other applications within 300 m: 18 granted, 0 refused, 5 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/04108/23).
On Triq Hal Qormi: 13 other applications, 8 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Claire Bezzina.
Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/05497/26 Luqa: To demolish terraced house, to excavate basement for private garages and reservoir, and to construct 2 overlying maisonettes, 6 apartments and penthouse at…
- PA/07634/26 Luqa: To sanction minor alterations at ground floor level from approved permit PA/005037/17. To propose minor internal alterations at ground floor level.
- PA/04108/23 Luqa: Demolition of terraced house and construction of basement garage, maisonette at ground floor, two two bedroomed apartments at first and second floors, one…
- PA/02783/25 Luqa: To sanction internal changes from approved permit PB0080/84.
- PA/02354/26 Luqa: Minor alterations to façade, replacement of deteriorated stairwell at the backyard and building of a small store at the back of the basement.
- PA/06818/24 Luqa: Proposal includes sanctioning of internal alterations in the un / loading area and a change to the facade.
- PA/02643/21 Luqa: Removal of existing signage and proposed billboard and cladding on façade. Proposal also includes sanctioning of minor internal alterations to Class 4A offices.
- PA/02604/26 Luqa: Sanctioning of internal alterations and of minor alterations to the facade of Class 4A offices. The proposal also includes alterations at the penthouse level.
- PA/05765/25 Luqa: Installation of an LED screen on the front façade and relocation of the existing sign.
- PA/02948/21 Luqa: Sanctioning internal and external alterations to terrace house built on two floors plus basement plus washroom
- PA/01601/26 Luqa: Changes to approved permit GD1932/99 for the formation of a back terrace at ground floor level.
- PA/08175/24 Luqa: Alterations to approved PA/4583/18 (Proposed extension at first floor to existing ground floor showroom, facade alterations, addition of two basement parking…
- PA/06280/25 Luqa: To change part of a garage into a public service garage.
- PA/00928/22 Luqa: To sanction the installation of a pv solar system at roof level.
- PA/04480/26 Luqa: To sanction minor internal and external alterations to the approved terraced house under PA/05422/01.
More by JG Periti
- PA/07460/26 San Pawl il-Bahar: Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building.
- PA/07376/26 Rabat: Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and…
- PA/07328/26 San Pawl il-Bahar: Proposed construction of pump chamber.
- PA/07217/26 Swieqi: Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes.
- PA/06980/26 Tarxien: Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse.
- PA/06947/26 Iklin: Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and…