propertylist

PA/03598/22: erection of 5 new residential levels over in San Pawl il-Bahar

Charles Joe Flats, Triq Efesu, San Pawl il-Bahar

Proposed erection of 5 new residential levels over existing apartment block that include 2 in no. 1 bedroom apartments, 1 in no. 3 bedroom (duplex) apartment, 2 in no. 2 bedroom (duplex) apartments, 1 in no. 2 bedroom recessed unit. Works to also include replacement of common vertical circulation to introduce new lift. Proposal also includes sanctioning of existing façade from that approved in PB00587/79.

Status
Status being checked
Location
Charles Joe Flats, Triq Efesu, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Mr Daniel Zahra
Perit
Perit James Bonnici Camilleri
Type of works
Sanctioning
Residential units
6

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Charles Joe Flats, Triq Efesu, San Pawl il-Bahar

296 other applications within 300 m: 186 granted, 10 refused, 31 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/07562/24).

On Triq Efesu: 16 other applications, 12 granted and 1 refused; granted buildings are typically 6 floors, the tallest 7. Periti active on this street: James Bonnici Camilleri, Analisa Lombardi.

Approval estimate for sanctioning applications like this here: about 92% (likely range 62–100%, medium reliability, from 80 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by James Bonnici Camilleri

All applications by James Bonnici Camilleri

More from Daniel Zahra

All planning applications in San Pawl il-Bahar