---
title: "PA/03609/26: sanction changes in layout to second floor in Birzebbuga | PropertyList"
url: https://propertylist.mt/permit/PA-03609-26/birzebbuga-sanction-changes-in-layout-to-second-floor
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Pending planning application in Birzebbuga: To sanction changes in layout to second floor apartment from approved PA7088/23, to sanction changes to third…

Planning applications › Birzebbuga › PA0360926

# PA/03609/26: sanction changes in layout to second floor in Birzebbuga

6 / 6B, Aquarius, Triq G. Marconi, Birzebbuga

To sanction changes in layout to second floor apartment from approved PA7088/23, to sanction changes to third floor converting a receded floor to an apartment and to construct a receded as a domestic store.

- **Status:** Pending (Awaiting Decision)
- **Location:** 6 / 6B, Aquarius, Triq G. Marconi, Birzebbuga
- **Locality:** [Birzebbuga](https://propertylist.mt/planning-applications/birzebbuga)
- **Applicant:** [Raymond Desira](https://propertylist.mt/applicant/raymond-desira)
- **Perit:** [Perit Robert Borg Hayman](https://propertylist.mt/perit/robert-borg-hayman)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Sanctioning
- **Received:** 10 April 2026
- **Validated:** 8 July 2026
- **Published:** 8 July 2026
- **Comments close:** 7 August 2026
- **Recommendation:** Refuse Permission

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03609/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03609&caseYear=26)

## Planning activity around 6 / 6B, Aquarius, Triq G. Marconi, Birzebbuga

43 other applications within 300 m: 27 granted, 0 refused, 4 pending. 100% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/05463/24).

On Triq G. Marconi: 1 other application, 1 granted and 0 refused.

Approval estimate for sanctioning applications like this here: about 95% (likely range 65–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07088/23** Birzebbuga](https://propertylist.mt/permit/PA-07088-23/birzebbuga-demolition-of-existing-roof-structure): Proposed demolition of existing roof structure, redevelopment of maisonette into three apartments and alterations to install lift. Granted, validated 29 November 2023, 24 m away
- [**PA/03616/25** Birzebbuga](https://propertylist.mt/permit/PA-03616-25/birzebbuga-sanctioning-of-residential-unit-as-built-from): Sanctioning of residential unit as built from approved permit PA3829/17. Granted, validated 24 June 2025, 40 m away
- [**PA/02175/23** Birzebbuga](https://propertylist.mt/permit/PA-02175-23/birzebbuga-sanction-property-as-built-from-that-approved): To sanction property as built from that approved in PB2575/88 and proposed construction of parapet wall above domestic store at roof level. Granted, validated 27 June 2023, 41 m away
- [**PA/01560/24** Birzebbuga](https://propertylist.mt/permit/PA-01560-24/birzebbuga-internal-and-external-amendments-to-property): Internal and external amendments to property, mainly alterations to partition walls, extension at first floor level, addition of staircase next to washroom,… Granted, validated 17 May 2024, 42 m away
- [**PA/01127/25** Birzebbuga](https://propertylist.mt/permit/PA-01127-25/birzebbuga-renewal-of-pa-09923-19-construction-of-room): Renewal of PA/09923/19 - Construction of room at first floor level, lowering of existing garage floor, construction of small internal pool. Granted, validated 20 March 2025, 2 floors, 56 m away
- [**PA/06372/25** Birzebbuga](https://propertylist.mt/permit/PA-06372-25/birzebbuga-sanction-changes-in-configuration-from-approved-permit): To sanction changes in configuration from approved permit PB/04742/87 as existing. Granted, validated 27 October 2025, 78 m away
- [**PA/07343/26** Birzebbuga](https://propertylist.mt/permit/PA-07343-26/birzebbuga-demolish-existing-terraced-house): To demolish existing terraced house, excavate, propose 5 private garages, reservoir, 2 maisonettes, 6 overlying apartments and 2 receded penthouses. Pending, validated 21 October 2026, 104 m away
- [**PA/00777/21** Birzebbuga](https://propertylist.mt/permit/PA-00777-21/birzebbuga-sanction-internal-and-external-changes-from-papb-01296-86): To sanction internal and external changes from PAPB/01296/86. Proposed minor external changes to façade. Status being checked, 110 m away
- [**PA/04306/26** Birzebbuga](https://propertylist.mt/permit/PA-04306-26/birzebbuga-sanction-minor-changes-to-the-terraced-house): To sanction minor changes to the terraced house as built from that approved by way of PB3054/90. Proposed extension at 2nd floor level. Granted, validated 24 June 2026, 112 m away
- [**PA/06204/26** Birzebbuga](https://propertylist.mt/permit/PA-06204-26/birzebbuga-internal-alterations-ground-and-first-floor-and): Internal alterations ground and first floor and new construction at second third and fourth floor to create 3 separate residential units. Pending, validated 9 September 2026, 4 floors, 118 m away
- [**PA/00146/22** Birzebbuga](https://propertylist.mt/permit/PA-00146-22/birzebbuga-formation-of-parapet-wall-at-roof-level): Proposed formation of parapet wall at roof level and proposed increase in height of backyard boundary walls. Proposed formation of pool in back yard. To… Status being checked, 119 m away
- [**PA/05579/26** Birzebbuga](https://propertylist.mt/permit/PA-05579-26/birzebbuga-part-demolition-of-existing-property): Part demolition of existing property (approved by PB/3759/89), re-construction of a garage at basement level and the construction of 5 residential units.… Pending, validated 19 August 2026, 3 floors plus a receded floor, 125 m away
- [**PA/03380/26** Birzebbuga](https://propertylist.mt/permit/PA-03380-26/birzebbuga-alterations-to-existing-terraced-house-to-form): Proposed alterations to existing terraced house to form maisonette at ground floor, overlying 2 apartments and 1 penthouse. Suspended, validated 27 May 2026, 3 floors plus a receded floor, 136 m away
- [**PA/00993/24** Birzebbuga](https://propertylist.mt/permit/PA-00993-24/birzebbuga-carry-out-alterations-to-existing-dwelling-approved): To carry out alterations to existing dwelling [approved in PAPB2452/88/4468/87] to split into ground floor maisonette and first floor maisonette. Granted, validated 21 February 2024, 2 floors, 149 m away
- [**PA/00609/23** Birzebbuga](https://propertylist.mt/permit/PA-00609-23/birzebbuga-sanction-property-as-built-from-what-was): To sanction property as built from what was approved in PA2942/07. Including sanctioning of site perimeter as per survey taken and internal alterations on… Granted, validated 11 April 2023, 150 m away

## More by Robert Borg Hayman

- [**PA/07708/26** Qormi](https://propertylist.mt/permit/PA-07708-26/qormi-roof-over-basement-driveway): To roof-over basement driveway. Pending
- [**PA/07673/26** Marsaskala](https://propertylist.mt/permit/PA-07673-26/marsaskala-install-aluminum-louvers-on-facade-to-screen): To install aluminum louvers on facade to screen ac compressors. Pending
- [**PA/07396/26** Zejtun](https://propertylist.mt/permit/PA-07396-26/zejtun-demolish-existing-terraced-house): To demolish existing terraced house, excavate to form basement garage interconnected with a car lift to a public services garage at ground floor, construct… Pending, validated 21 October 2026, 4 floors plus a receded floor
- [**PA/07265/26** Qormi](https://propertylist.mt/permit/PA-07265-26/qormi-sanction-extension-in-front-terrace-of-an): To sanction extension in front terrace of an existing penthouse built with PA/749/07 and sanctioned with PA/6022/17, and to construct a parapet wall to screen… Pending
- [**PA/07244/26** Qormi](https://propertylist.mt/permit/PA-07244-26/qormi-renewal-of-pa-09636-17-to-install-pv): Renewal of PA/09636/17 - To install pv panels with required structure above existing garage and driveway. Pending, validated 21 October 2026
- [**PA/06635/26** Zurrieq](https://propertylist.mt/permit/PA-06635-26/zurrieq-sanction-changes-carried-out-differently-from-what): To sanction changes carried out differently from what was approved with PA/04377/23 to pre-1967 Terraced house. Proposal included correction of height of… Pending

[All applications by Robert Borg Hayman](https://propertylist.mt/perit/robert-borg-hayman)

## More from Raymond Desira

- [**PA/03936/26** Zejtun](https://propertylist.mt/permit/PA-03936-26/zejtun-renewal-to-pa10927-17-and-pa2444-12-and-pa5922-07): Renewal to PA10927/17 and PA2444/12 and PA5922/07 - To construct semi-basement garages and overlying apartments and penthouse. Granted, validated 21 July 2026, 2 floors plus a receded floor
- [**PA/02273/26** Pieta](https://propertylist.mt/permit/PA-02273-26/pieta-extension-to-block-e): Extension to Block E (as approved in PA/04022/23) to add a shop (Class 4B at ground level with independent separate entrance) and another 6 units (5… Pending, validated 22 July 2026
- [**PA/01902/24** Pieta](https://propertylist.mt/permit/PA-01902-24/pieta-develop-pool-and-move-staircase-at-roof): To develop pool and move staircase at roof level of penthouse as approved in permits PA/1188/22 and PA/2761/21. Reduction of apartment 9 from two-bedroom to… Granted, validated 3 April 2024
- [**PA/07088/23** Birzebbuga](https://propertylist.mt/permit/PA-07088-23/birzebbuga-demolition-of-existing-roof-structure): Proposed demolition of existing roof structure, redevelopment of maisonette into three apartments and alterations to install lift. Granted, validated 29 November 2023
- [**PA/04022/23** Pieta](https://propertylist.mt/permit/PA-04022-23/pieta-construct-block-of-2-maisonettes): To construct block of 2 maisonettes, 15 apartments and overlying penthouse (18 units in total) and underlying 2 stories of garages and to replace one parking… Granted, validated 5 July 2023
- [**PA/02038/23** Pieta](https://propertylist.mt/permit/PA-02038-23/pieta-construct-basement-garages): To construct basement garages, 2 maisonettes, 15 apartments and 2 penthouses and to sanction ramp at basement -1. Granted, validated 12 April 2023

[All planning applications in Birzebbuga](https://propertylist.mt/planning-applications/birzebbuga)
