---
title: "PA/03670/24: Alterations to building entrance and common parts in Rabat | PropertyList"
url: https://propertylist.mt/permit/PA-03670-24/rabat-alterations-to-building-entrance-and-common-parts
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-02
---

> Granted planning application in Rabat: Alterations to building entrance and common parts to facilitate accessibility for all. Perit Theresa Schembri.…

Planning applications › Rabat › PA0367024

# PA/03670/24: Alterations to building entrance and common parts in Rabat

Flats 1-8 Block C, Triq Ghajn Kajjet, Rabat

Alterations to building entrance and common parts to facilitate accessibility for all.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Flats 1-8 Block C, Triq Ghajn Kajjet, Rabat
- **Locality:** [Rabat](https://propertylist.mt/planning-applications/rabat)
- **Applicant:** [Ivan Pace](https://propertylist.mt/applicant/ivan-pace)
- **Perit:** [Perit Theresa Schembri](https://propertylist.mt/perit/theresa-schembri)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** New Construction
- **Received:** 26 March 2024
- **Validated:** 4 June 2025
- **Published:** 26 June 2024
- **Comments close:** 11 July 2024
- **Decision:** Acceptable
- **Permit expires:** 18 June 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/03670/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=03670&caseYear=24)

## Planning activity around Flats 1-8 Block C, Triq Ghajn Kajjet, Rabat

16 other applications within 300 m: 8 granted, 1 refused, 3 pending. 89% of decided applications nearby were granted.

On Triq Ghajn Kajjet: 9 other applications, 7 granted and 0 refused. Periti active on this street: [Duncan Formosa](https://propertylist.mt/perit/duncan-formosa), [Lauran Dimech](https://propertylist.mt/perit/lauran-dimech).

Approval estimate for new construction applications like this here: about 92% (likely range 62–100%, low reliability, from 2 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00677/24** Rabat](https://propertylist.mt/permit/PA-00677-24/rabat-modifications-by-dividing-the-property-into-2): Proposed modifications by dividing the property into 2 residential units including internal and external alterations with the construction of pools in lieu of… Granted, validated 14 February 2024, 29 m away
- [**PA/00082/24** Rabat](https://propertylist.mt/permit/PA-00082-24/rabat-alterations-and-extension-to-existing-farmhouse): Alterations and extension to existing farmhouse. Granted, validated 17 January 2024, 51 m away
- [**PA/06732/25** Rabat](https://propertylist.mt/permit/PA-06732-25/rabat-demolition-of-part-of-a-rubble-wall): Demolition of part of a Rubble Wall within the site, Construction of Greenhouse and below ground Water Reservoir, Sanctioning of Pre-1994 Water Reservoir and… Granted, validated 22 October 2025, 103 m away
- [**PA/03416/22** Rabat](https://propertylist.mt/permit/PA-03416-22/rabat-rehabilitation-of-existing-farmhouse): Rehabilitation of existing farmhouse, minor alterations and additions to same, construction of pool and rubble wall to delineate property from adjacent third… Status being checked, 127 m away
- [**PA/01556/23** Rabat](https://propertylist.mt/permit/PA-01556-23/rabat-internal-and-external-changes-in-office-building): Proposed internal and external changes in office building, demolition and reconstruction of garage and security area, addition of rubble wall in certain… Granted, validated 22 March 2023, 133 m away
- [**PA/04972/23** Rabat](https://propertylist.mt/permit/PA-04972-23/rabat-construction-of-store-within-field-with-underlying): Construction of store within field with underlying reservoir, replacement of roof in pre-existing structure, construction of new front wall with new gate… Pending, validated 23 August 2023, 206 m away
- [**PA/02814/21** Rabat](https://propertylist.mt/permit/PA-02814-21/rabat-restoration-of-the-existing-walls-and-re-building): Proposed restoration of the existing walls and re-building of the ceiling of the existing pre- 1967 room '' kalkara tal gir'' to be used as an agriculture… Status being checked, 210 m away
- [**PA/02730/22** Rabat](https://propertylist.mt/permit/PA-02730-22/rabat-sanction-internal-alterations): To sanction internal alterations (shifting of walls) and external alterations (façade alignment) to existing terraced house approved by PB515/90 and PA735/06.… Status being checked, 226 m away
- [**PA/04977/25** Rabat](https://propertylist.mt/permit/PA-04977-25/rabat-change-of-use-from-approved-store): Change of use from approved store (PB/01923/88) to public service garage, and proposed internal partitioning. Granted, validated 30 July 2025, 264 m away
- [**PA/01886/25** Rabat](https://propertylist.mt/permit/PA-01886-25/rabat-change-of-use-from-residential-garage-to): Change of use from residential garage to public service garage. Granted, validated 26 March 2025, 264 m away
- [**PA/00793/21** Rabat](https://propertylist.mt/permit/PA-00793-21/rabat-sanction-pre-1978-room-and-reservoir): To sanction pre-1978 room and reservoir. Status being checked, 271 m away
- [**PA/06679/26** Rabat](https://propertylist.mt/permit/PA-06679-26/rabat-release-parcel-of-land-tied-to-agricultural): To release parcel of land tied to agricultural store approved in PA/0793/21. The proposal includes the shifting of a water reservoir approved in PA/3336/24… Pending, validated 30 September 2026, 272 m away
- [**PA/03336/24** Rabat](https://propertylist.mt/permit/PA-03336-24/rabat-construct-a-green-house): To construct a green house. Proposal includes the installation of solar panels and the planting of trees. Granted, validated 12 June 2024, 272 m away
- [**PA/07707/24** Rabat](https://propertylist.mt/permit/PA-07707-24/rabat-cladding-of-the-existing-reservoir-with-rubble): Proposed cladding of the existing reservoir with rubble wall, installing a timber-clad gate, and laying existing PV panels flat. Pending, validated 20 November 2024, 284 m away
- [**PA/04755/26** Rabat](https://propertylist.mt/permit/PA-04755-26/rabat-construction-of-an-agricultural-store): Proposed construction of an agricultural store, with pump room, open top reservoir, underground reservoir and access ramp. Refused, validated 22 July 2026, 1 floor, 286 m away

## More by Theresa Schembri

- [**PA/01419/26** St Julians](https://propertylist.mt/permit/PA-01419-26/st-julians-construction-of-a-lift-shaft-and-formation): Construction of a lift shaft and formation of an external ramp at an existing government block. Granted, validated 15 May 2026
- [**PA/01147/26** Zejtun](https://propertylist.mt/permit/PA-01147-26/zejtun-construction-of-lift-shaft-and-alterations-to): Construction of lift shaft and alterations to facade. Granted, validated 27 March 2026
- [**PA/07856/25** Qormi](https://propertylist.mt/permit/PA-07856-25/qormi-alterations-to-existing-common-parts-to-allow): Alterations to existing common parts to allow for the installation of a lift. Granted, validated 9 March 2026
- [**PA/07495/25** Luqa](https://propertylist.mt/permit/PA-07495-25/luqa-alterations-to-existing-common-parts-to-allow): Alterations to existing common parts to allow for the installation of a lift. Granted, validated 11 December 2025
- [**PA/06881/25** Qormi](https://propertylist.mt/permit/PA-06881-25/qormi-alterations-for-a-lift-shaft): Proposed alterations for a lift shaft. Granted, validated 3 June 2026
- [**PA/05925/25** Qormi](https://propertylist.mt/permit/PA-05925-25/qormi-alterations-for-the-construction-of-a-lift): Proposed alterations for the construction of a lift shaft and an external ramp. Granted, validated 30 September 2025

[All applications by Theresa Schembri](https://propertylist.mt/perit/theresa-schembri)

## More from Ivan Pace

- [**PA/00930/25** Belt Valletta](https://propertylist.mt/permit/PA-00930-25/belt-valletta-alterations-to-common-parts-to-construct-lift): Alterations to common parts to construct lift shaft. Granted, validated 17 September 2025
- [**PA/00488/25** Mosta](https://propertylist.mt/permit/PA-00488-25/mosta-change-of-use-from-retail): Change of use from retail (Class 4B) to residential (Class 1). Proposal include minor internal alterations consisting of dividing walls in gypsum partition. Granted, validated 4 March 2025
- [**PA/08009/24** Siggiewi](https://propertylist.mt/permit/PA-08009-24/siggiewi-proposal-for-the-construction-of-a-lift): Proposal for the construction of a lift shaft, external ramp and internal alterations to the common parts in an existing government block. Granted, validated 27 November 2024
- [**PA/08008/24** Birkirkara](https://propertylist.mt/permit/PA-08008-24/birkirkara-construction-of-a-lift-shaft): Proposed construction of a lift shaft, formation of an external ramp, internal and external alterations to the common parts in an existing government block. Granted, validated 27 November 2024
- [**PA/07785/24** Floriana](https://propertylist.mt/permit/PA-07785-24/floriana-internal-alterations-and-extension-of-stairwell-at): Internal alterations and extension of stairwell at roof level for the construction of a lift serving common parts. Granted, validated 23 January 2025
- [**PA/04087/24** Belt Valletta](https://propertylist.mt/permit/PA-04087-24/belt-valletta-propose-widening-of-opening-and-minor-internal): To propose widening of opening and minor internal alterations. Granted, validated 7 October 2024

[All planning applications in Rabat](https://propertylist.mt/planning-applications/rabat)
