PA/03821/24: demolish existing rubble wall in San Pawl il-Bahar
309, Triq Burmarrad, Burmarrad, San Pawl il-Bahar
To demolish existing rubble wall (recent construction) plus other alterations to site approved by PA4616/20 and installation of gate to adjacent site approved by PA3182/20.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- 309, Triq Burmarrad, Burmarrad, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Vanessa Deguara
- Perit
- Falzon & Cutajar
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Demolition & New Construction
- Received
- 27 March 2024
- Validated
- 9 October 2024
- Published
- 9 October 2024
- Comments close
- 8 November 2024
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 8 January 2025
- Permit expires
- 29 January 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 309, Triq Burmarrad, Burmarrad, San Pawl il-Bahar
46 other applications within 300 m: 22 granted, 2 refused, 5 pending. 92% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/00219/26).
On Triq Burmarrad: 44 other applications, 21 granted and 2 refused; granted buildings are typically 4 floors, the tallest 5. Periti active on this street: Charles Buhagiar, JG Periti, George Farrugia, Gilbert Bartolo, Robert Grech.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 5 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/01197/23 San Pawl il-Bahar: Maintenance and re-construction of existing rubble walls. Removal of existing debris and proposed formation of timber gate.
- PA/01709/21 San Pawl il-Bahar: To sanction pre 1978 reservoir as built, proposed deposition of 0.5m depth of soil over existing concrete slab over reservoir, proposed demolition of…
- PA/01305/21 San Pawl il-Bahar: To sanction rubble walls demarcating existing agricultural field, ramps formed in agricultural soil, access ramp formed in concrete, installation of timber…
- PA/08218/24 San Pawl il-Bahar: Demolition of existing dwelling and construction of terraced house including basement garage and pool.
- PA/04014/25 San Pawl il-Bahar: Installation of billboard.
- PA/03986/23 San Pawl il-Bahar: To sanction agriculture store, above ground reservoir and rubble wall, deposition of soil. Minor modification to rubble wall and fix timber gate.
- PA/00668/24 San Pawl il-Bahar: Demolition of existing dwelling and construction of 5 basement garages, maisonette at ground floor and 1 street level garage and overlying 6 apartments, and 2…
- PA/08220/24 San Pawl il-Bahar: To sanction internal variations from approved PA2888/17. To propose minor internal alterations to flat 2, flat 4 and flat 6 and Class 4B shop.
- PA/02006/25 San Pawl il-Bahar: To sanction changes to Class 4C bar approved in PA2206/94, including basement ancillary store. Alterations and change of use from Class 4C bar to Class 4B…
- PA/05576/26 San Pawl il-Bahar: To sanction external variations from approved PA2888/17.
- PA/02959/23 San Pawl il-Bahar: To sanction minor alterations at third floor level penthouse. Proposed demolition of roof slab and proposed extension to existing penthouse at third floor…
- PA/04666/26 San Pawl il-Bahar: Demolition of existing dwelling, excavation and construction of 5 basement garages at level -1, construction of 2 Class 4B shops, 6 apartments and 2…
- PA/03908/26 San Pawl il-Bahar: To sanction a garden centre with both retail (Class 4B) and storage and distribution (Class 6A), consisting of: conversion of a greenhouse into a retail…
- PA/06726/24 San Pawl il-Bahar: To sanction confectionery shop (Class 4B) and bakery as built from that approved in PA/03592/19 and to sanction facade design and fascia sign.
- PA/02415/23 San Pawl il-Bahar: Proposed change of use from office Class 4A to retail Class 4B and fixing of sign.
More by Falzon & Cutajar
- PA/02901/25 Qrendi: Change of use from store ancillary with operating poultry farm to hatchery, excavation and construction of reservoir and store in lieu of store being proposed…
- PA/01969/25 Iklin: To demolish existing residential unit and construct fuel service station, relocating an existing fuel station, including a take away (drive through) facility…
- PA/01773/25 Qormi: To excavate and construct garage at basement level, public service garage at ground floor, apartments at 1st, 2nd and 3rd floor levels plus overlying penthouse.
- PA/01231/25 Gudja: To construct stairs at ground and first floors, internal alterations at first floor, restoration to facade including alterations, construction of pool at roof…
- PA/01122/25 Sliema: Proposed additions and alterations to a Class 3B 4-star hotel approved by PA/03614/18, consisting of extension of restaurant at intermediate level, extension…
- PA/01077/25 Naxxar: Proposed construction of sheep farm, installation of gate and construction of dry random rubble wall. Proposal includes the excavation and construction of…