PA/04049/25: Partial excavation of site and reconstruction of in Mqabba
Site at, Sqaq tal-Kanonku c/w, Sqaq tax-Xatba l-Hamra, Mqabba
Partial excavation of site and reconstruction of two levels of warehouses (Class 6A) in existing quarry including landscaping, parking provisions and ancillary facilities at ground floor level. (Amendments in lieu of PA/1174/09).
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Site at, Sqaq tal-Kanonku c/w, Sqaq tax-Xatba l-Hamra, Mqabba
- Locality
- Mqabba
- Applicant
- Maurizio Baldacchino
- Perit
- Perit Samuel Formosa
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Quarry
- Height
- 2 floors
- Received
- 7 May 2025
- Validated
- 4 March 2026
- Published
- 4 March 2026
- Comments close
- 10 April 2026
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 30 July 2026
- Permit expires
- 2 September 2031
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Site at, Sqaq tal-Kanonku c/w, Sqaq tax-Xatba l-Hamra, Mqabba
No other applications recorded nearby yet.
More by Samuel Formosa
- PA/07801/26 San Pawl il-Bahar: To renew PA/00339/18 - To sanction garage at basement level and construct an overlying room at ground floor level as an extension to existing dwelling and…
- PA/07590/26 Pieta: To sanction existing garage as built.
- PA/07299/26 Pieta: Sanctioning of existing minor internal alterations to garage.
- PA/07246/26 Zebbug: Proposed excavation of part of site to form a basement level, minor internal alterations to the existing dwelling, construction of an additional floor and…
- PA/07114/26 Birzebbuga: Proposed change of use from Class 1A residential unit to Class 2C childcare including internal and external alterations.
- PA/07083/26 Qormi: Proposed modification to existing staircase at receded floor level and proposed addition of pool at roof floor level.
All applications by Samuel Formosa
More from Maurizio Baldacchino
- PA/00512/26 Zurrieq: To sanction Class 5B carpentry factory at basement level. Proposed construction of new substation and stairs leading to ground floor.
- PA/04861/25 Zurrieq: To demolish existing buildings, excavate as necessary and construct Class 3A bungalows with pools for tourist accommodation, of the same area of existing…
- PA/07375/24 Zejtun: To propose construction of the house on vacant plot.
- PA/03748/24 Santa Venera: Construction of 8 apartments at third floor and 8 penthouses at set-back floor on airspace.
- PA/00331/24 Zurrieq: To sanction changes from approved permit PB/2465/89 as built and propose columns at ground floor and overlying terrace, lift and store Class 6A at first floor…
- PA/03177/23 Zurrieq: To propose excavation for ramp and underground parking, including proposal of substation.