propertylist

PA/04150/25: demolition of the existing house and three in Paola

Casa Montebello, Triq Windsor c/w open space in, Triq Windsor, Paola

Proposed demolition of the existing house and three underlying garages. Excavation is proposed to create a basement for private car parking spaces and a car lift interconnected with the proposed ground-floor garage. Proposed construction of a ground-floor garage for private car parking, along with fifteen one-bedroom apartments on the first, second, and third floors. Additionally, three one-bedroom apartments are proposed at the receded fourth-floor level.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Casa Montebello, Triq Windsor c/w open space in, Triq Windsor, Paola
Locality
Paola
Applicant
Daniel Montebello
Perit
Perit Robert J. Ellul Sciberras
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Residential)
Height
4 floors plus a receded floor
Residential units
18
Received
21 March 2025
Validated
25 June 2025
Published
25 June 2025
Comments close
25 July 2025
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
30 October 2025
Permit expires
12 November 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Casa Montebello, Triq Windsor c/w open space in, Triq Windsor, Paola

151 other applications within 300 m: 102 granted, 3 refused, 19 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/03327/23).

On Triq Windsor: 8 other applications, 4 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: Pierre Poulton.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 27 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Robert J. Ellul Sciberras

All applications by Robert J. Ellul Sciberras

More from Daniel Montebello

All planning applications in Paola