---
title: "PA/04169/25: renew PA/9772/19 - To demolish existing dwelling in San Pawl il-Bahar |…"
url: https://propertylist.mt/permit/PA-04169-25/san-pawl-il-bahar-renew-pa-9772-19-to-demolish-existing-dwelling
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in San Pawl il-Bahar: Application to renew PA/9772/19 - To demolish existing dwelling and construction of ground floor Class 4A…

Planning applications › San Pawl il-Bahar › PA0416925

# PA/04169/25: renew PA/9772/19 - To demolish existing dwelling in San Pawl il-Bahar

29/31, Triq San Luqa, San Pawl il-Bahar

Application to renew PA/9772/19 - To demolish existing dwelling and construction of ground floor Class 4A offices and overlying 7 apartments.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** 29/31, Triq San Luqa, San Pawl il-Bahar
- **Locality:** [San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
- **Applicant:** [Christian Granata](https://propertylist.mt/applicant/christian-granata)
- **Perit:** [Perit Samuel Formosa](https://propertylist.mt/perit/samuel-formosa)
- **Application type:** Renewal of development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Permit Renewal
- **Residential units:** 7
- **Received:** 21 March 2025
- **Validated:** 15 July 2025
- **Published:** 25 June 2025
- **Comments close:** 10 July 2025
- **Decision:** Acceptable
- **Permit expires:** 30 July 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04169/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04169&caseYear=25)

## Planning activity around 29/31, Triq San Luqa, San Pawl il-Bahar

229 other applications within 300 m: 140 granted, 9 refused, 27 pending. 94% of decided applications nearby were granted. Tallest granted nearby: 8 floors (PA/05349/23).

On Triq San Luqa: 8 other applications, 6 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: [Colin Zammit](https://propertylist.mt/perit/colin-zammit).

Approval estimate for permit renewal applications like this here: about 95% (likely range 65–100%, low reliability, from 7 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/02780/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02780-21/san-pawl-il-bahar-sanction-receded-floor-at-5th-floor-level): To sanction receded floor at 5th floor level as built from that as approved in PA/01982/09 Status being checked, 5 floors plus a receded floor, 22 m away
- [**PA/01858/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01858-25/san-pawl-il-bahar-demolition-of-existing-houses-and-excavation-of): Proposed demolition of existing houses and excavation of 3 levels to develop 20 garages at basement Levels -1, -2 and -3, two maisonettes at ground floor, 17… Granted, validated 18 March 2025, 7 floors plus a receded floor, 28 m away
- [**PA/07871/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07871-24/san-pawl-il-bahar-convert-an-approved-duplex-penthouse-pa2856-07-into): To convert an approved duplex penthouse PA2856/07 into a duplex apartment including demolishing of penthouse, internal and external alterations and… Granted, validated 20 November 2024, 4 floors, 28 m away
- [**PA/02773/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02773-23/san-pawl-il-bahar-sanction-internal-and-external-variations-for-proper): To sanction internal and external variations for property as built from RG2118/18, PA313/13. Granted, validated 17 May 2023, 31 m away
- [**PA/02893/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02893-24/san-pawl-il-bahar-demolition-of-existing-washroom-at-fourth-floor): Demolition of existing washroom at fourth floor level and staircase in common parts, construction of a duplex apartment and a duplex penthouse at receded… Granted, validated 22 May 2024, 4 floors plus a receded floor, 34 m away
- [**PA/02855/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02855-26/san-pawl-il-bahar-replace-ceilings-and-carry-out-minor-internal): To replace ceilings and carry out minor internal alterations. Granted, validated 8 June 2026, 45 m away
- [**PA/07592/23** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07592-23/san-pawl-il-bahar-sanction-variations-in-existing-apartment): To sanction variations in existing apartment, including a retractable awning from approved permit PA5835/07. Granted, validated 14 February 2024, 46 m away
- [**PA/02573/25** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02573-25/san-pawl-il-bahar-demolish-existing-ground-floor-garage-and-reconstruc): To demolish existing ground floor garage and reconstruction of an underground reservoir, ground floor Class 4A office and overlying seven residential units. Granted, validated 16 April 2025, 58 m away
- [**PA/01381/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01381-22/san-pawl-il-bahar-sanctioning-of-ground-floor-apartment-as-built): Proposed sanctioning of ground floor apartment as built; together with proposed internal alterations and an extension at the back of the property. Status being checked, 59 m away
- [**PA/01406/22** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01406-22/san-pawl-il-bahar-correction-of-site-plan-to-pa9501-18-and): Correction of site plan to PA9501/18 and PA10179/17. Status being checked, 70 m away
- [**PA/00090/21** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00090-21/san-pawl-il-bahar-sanction-existing-ground-floor-level-and-constructio): To sanction existing ground floor level and construction of a new dwelling Status being checked, 70 m away
- [**PA/02102/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-02102-24/san-pawl-il-bahar-demolish-existing-dwelling-and-construct-ground-floo): To demolish existing dwelling and construct ground floor garages, 5 apartments and a duplex apartment. Refused, validated 10 April 2024, 71 m away
- [**PA/05967/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-05967-26/san-pawl-il-bahar-alterations-to-fa-ade-balconies): Alterations to façade balconies. Granted, validated 8 October 2026, 77 m away
- [**PA/01679/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01679-26/san-pawl-il-bahar-demolish-existing-terraced-house-and-construct-apart): To demolish existing terraced house and construct apartment block consisting of ground floor maisonette and overlying seven apartments (one receded). Pending, validated 11 March 2026, 2 floors plus a receded floor, 77 m away
- [**PA/06177/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06177-24/san-pawl-il-bahar-modifications-to-approved-pa-3598-22-consisting-of): Modifications to approved PA 3598/22 consisting of alteration to internal balcony's for third party property's first and second floors, construction of… Granted, validated 3 September 2025, 77 m away

## More by Samuel Formosa

- [**PA/07801/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07801-26/san-pawl-il-bahar-renew-pa-00339-18-to-sanction-garage-at): To renew PA/00339/18 - To sanction garage at basement level and construct an overlying room at ground floor level as an extension to existing dwelling and… Pending, 1 floor
- [**PA/07590/26** Pieta](https://propertylist.mt/permit/PA-07590-26/pieta-sanction-existing-garage-as-built): To sanction existing garage as built. Pending
- [**PA/07299/26** Pieta](https://propertylist.mt/permit/PA-07299-26/pieta-sanctioning-of-existing-minor-internal-alterations-to): Sanctioning of existing minor internal alterations to garage. Pending
- [**PA/07246/26** Zebbug](https://propertylist.mt/permit/PA-07246-26/zebbug-excavation-of-part-of-site-to-form): Proposed excavation of part of site to form a basement level, minor internal alterations to the existing dwelling, construction of an additional floor and… Pending, validated 21 October 2026
- [**PA/07114/26** Birzebbuga](https://propertylist.mt/permit/PA-07114-26/birzebbuga-change-of-use-from-class-1a-residential): Proposed change of use from Class 1A residential unit to Class 2C childcare including internal and external alterations. Pending, validated 14 October 2026
- [**PA/07083/26** Qormi](https://propertylist.mt/permit/PA-07083-26/qormi-modification-to-existing-staircase-at-receded-floor): Proposed modification to existing staircase at receded floor level and proposed addition of pool at roof floor level. Pending

[All applications by Samuel Formosa](https://propertylist.mt/perit/samuel-formosa)

## More from Christian Granata

- [**PA/00467/25** Attard](https://propertylist.mt/permit/PA-00467-25/attard-sanction-differences-in-the-construction-of-villa): To sanction differences in the construction of villa from approved permit PA/3292/15. Pending, validated 29 January 2025
- [**PA/01534/21** Attard](https://propertylist.mt/permit/PA-01534-21/attard-renewal-of-pa-03292-15-to-demolish-existing): Renewal of PA/03292/15 - To demolish existing semi-detached villa and erect a 2-storey semi-detached villa plus semi-basement garage and fresh water pool Status being checked, 2 floors

[All planning applications in San Pawl il-Bahar](https://propertylist.mt/planning-applications/san-pawl-il-bahar)
