---
title: "PA/04220/24: greenhouses in Rabat | PropertyList"
url: https://propertylist.mt/permit/PA-04220-24/rabat-greenhouses
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Withdrawn planning application in Rabat: Proposed greenhouses, new rubble wall along the common access to other sites, leveling of soil, fence and entrance…

Planning applications › Rabat › PA0422024

# PA/04220/24: greenhouses in Rabat

Site at, Raba Nemel, Limiti tar-, Rabat

Proposed greenhouses, new rubble wall along the common access to other sites, leveling of soil, fence and entrance gate and security room.

- **Status:** Withdrawn (This application for development permission has been withdrawn by the applicant.)
- **Location:** Site at, Raba Nemel, Limiti tar-, Rabat
- **Locality:** [Rabat](https://propertylist.mt/planning-applications/rabat)
- **Applicant:** Clayton Zarb
- **Perit:** [Dr Edwin Mintoff](https://propertylist.mt/perit/edwin-mintoff)
- **Application type:** Full development permission
- **Zone:** Outside Development Zone
- **Type of works:** Other
- **Received:** 4 April 2024
- **Validated:** 3 July 2024
- **Published:** 3 July 2024
- **Comments close:** 2 August 2024

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04220/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04220&caseYear=24)

## Planning activity around Site at, Raba Nemel, Limiti tar-, Rabat

2 other applications on the same street: 0 granted, 0 refused, 0 pending.

On Raba Nemel: 2 other applications, 0 granted and 0 refused. Periti active on this street: [Robert Musumeci LL.D., Perit](https://propertylist.mt/perit/robert-musumeci-ll-d-perit).

Approval estimate for other applications like this here: about 92% (likely range 62–100%, low reliability, from 0 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00925/21** Rabat](https://propertylist.mt/permit/PA-00925-21/rabat-renewal-of-pa1083-16): Renewal of PA1083/16 – (Renewal of PA366/08 - Alterations to existing and a proposed overlying dwelling (outline PA 7994/06 approved). Status being checked
- [**PA/02544/22** Rabat](https://propertylist.mt/permit/PA-02544-22/rabat-partial-demolition-of-existing-building): Partial demolition of existing building (in a dangerous state) and construction of two dwellings and swimming pools in a Category 3 settlement. Status being checked

## More by Edwin Mintoff

- [**PA/07655/26** Munxar](https://propertylist.mt/permit/PA-07655-26/munxar-extension-and-changes-to-approved-permit-pa-01661-20): Proposed extension and changes to approved permit PA/01661/20. Proposal consists of the excavation of part of garden, water reservoir under ground floor pool… Pending
- [**PA/07457/26** Gzira](https://propertylist.mt/permit/PA-07457-26/gzira-amendments-to-facade-for-structural-integrity): Amendments to facade for structural integrity. Pending
- [**PA/07455/26** Sliema](https://propertylist.mt/permit/PA-07455-26/sliema-redesign-of-bar-cafeteria-entrance): Proposed redesign of bar/cafeteria entrance, including new sign. Pending, validated 28 October 2026
- [**PA/07431/26** St Julians](https://propertylist.mt/permit/PA-07431-26/st-julians-sanction-the-change-of-use-from-showroom): To sanction the change of use from showroom approved in PA03705/99 to a convenience shop Class 4B including internal layout changes, added signage,… Pending, validated 28 October 2026
- [**PA/07407/26** Sliema](https://propertylist.mt/permit/PA-07407-26/sliema-demolish-the-existing-staircase-and-carry-out): To demolish the existing staircase and carry out internal and external alterations to the development approved under PA/06318/23, including the provision of… Pending, validated 28 October 2026, 5 floors
- [**PA/07388/26** Marsaskala](https://propertylist.mt/permit/PA-07388-26/marsaskala-demolition-of-existing-hotel-and-proposed-construction): Proposed demolition of existing hotel and proposed construction of Class 3B 4 star hotel. Pending, validated 21 October 2026

[All applications by Edwin Mintoff](https://propertylist.mt/perit/edwin-mintoff)

[All planning applications in Rabat](https://propertylist.mt/planning-applications/rabat)
