propertylist

PA/04294/26: minor demolition of few internal walls and in Sliema

54, Triq il-Lunzjata, Sliema

Proposed minor demolition of few internal walls and construction of a Class 3A Guesthouse distributed on the existing 4 floors and consisting of: ground floor with Hotel amenities and three rooms, of which one AADG, two overlying floors with two rooms each, and a receded floor with one room. Minor changes to the facade include the removal of the existing aluminium apertures at ground floor to be substituted with timber apertures, and the addition of a sign.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
54, Triq il-Lunzjata, Sliema
Locality
Sliema
Applicant
Jairo Caruana
Perit
Perit George Farrugia
Application type
Full development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction
Height
4 floors plus a receded floor
Residential units
7
Received
26 May 2026
Validated
24 June 2026
Published
24 June 2026
Comments close
24 July 2026
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
27 October 2026

Premium: register with WhatsApp (free) on PropertyList to read what its planning file says: the case officer's recommendation, the reasons, conditions and consultations.

The public planning file has 34 documents: plans, reports, consultations and the decision.

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around 54, Triq il-Lunzjata, Sliema

236 other applications within 300 m: 149 granted, 5 refused, 24 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 14 floors (PA/02965/23).

On Triq il-Lunzjata: 12 other applications, 3 granted and 0 refused; granted buildings are typically 4 floors, the tallest 4. Periti active on this street: George Farrugia.

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 12 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by George Farrugia

All applications by George Farrugia

All planning applications in Sliema