PA/04339/23: Demolition of the existing CIP in Luqa
VIP Terminal, Malta International Airport, Airport, Luqa
Demolition of the existing CIP (commercially important persons)-side of the VIP terminal at the Malta International Airport, and re-building of a new terminal on ground and first floor. The new terminal is to occupy a larger footprint on ground floor, and have its first floor that extends over the roof of the adjacent ministerial-side of the VIP terminal. The proposal includes modifications to the surrounding landscaped areas, both land-side and air-side.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- VIP Terminal, Malta International Airport, Airport, Luqa
- Locality
- Luqa
- Applicant
- Malta International Airport plc Attn: Kevin Alamango
- Perit
- Valentino Architects
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Demolition & New Construction
- Height
- 2 floors
- Received
- 16 May 2023
- Validated
- 19 July 2023
- Published
- 19 July 2023
- Comments close
- 4 September 2023
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 29 November 2023
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around VIP Terminal, Malta International Airport, Airport, Luqa
No other applications recorded nearby yet.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
More by Valentino Architects
- PA/06742/26 Zebbug: Proposed alterations to an existing townhouse, including internal and external modifications, amendments to existing openings, removal and redevelopment of a…
- PA/06340/26 Mosta: To excavate basement and construct Class 3A guesthouse with 30 guestrooms throughout 4 levels and at a receded level.
- PA/06164/26 San Pawl il-Bahar: Proposed change of apertures material and specification as approved in PA209/23, change to position of entrance gate within private road together with minor…
- PA/06125/26 Iklin: Demolition of existing industrial warehouse and showroom; excavation of existing basement to add a further basement level; construction of two basement levels…
- PA/05490/26 San Gwann: Demolition of existing corner villa, including excavation and construction of a new semi-detached villa, on two floors including underlying basement and pool…
- PA/05432/26 Kalkara: Minor internal and external changes to two-storey house with setback floor.
All applications by Valentino Architects
More from Malta International Airport plc
- PA/03677/26 Luqa: Proposed changes to approved PA/06330/24, mainly consisting of the change of use of part of level 6 Block B1 from Class 4A offices and conference rooms to…
- PA/05393/24 San Pawl il-Bahar: Installation of a meteorological buoy.
- PA/06191/23 Luqa: Installation of benches and bollards as anti-terrorist mitigation measures in the terminal outer lane access road as required by governing international…
- PA/03877/23 Luqa: Malta International Airport Master Plan.