PA/04522/25: installation of pv panels on the roof in Kirkop
Gibjun, Triq ir-Ramlija c/w, Triq il-Belt Valletta, Kirkop
Proposed installation of pv panels on the roof of Kirkop reservoir, installation of inverters, partial demolition of boundary wall, and construction of an electrical substation and starter room.
- Status
- Granted (This application has been approved by Planning Board / Commission.)
- Location
- Gibjun, Triq ir-Ramlija c/w, Triq il-Belt Valletta, Kirkop
- Locality
- Kirkop
- Applicant
- Karl Cilia
- Perit
- Perit Leon Gauci
- Application type
- Full development permission
- Zone
- Outside Development Zone
- Type of works
- Demolition & New Construction
- Received
- 3 June 2025
- Validated
- 9 July 2025
- Published
- 9 July 2025
- Comments close
- 25 August 2025
- Recommendation
- Grant Permission
- Decision
- Grant Permission
- Decision date
- 3 October 2025
- Permit expires
- 15 October 2030
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Gibjun, Triq ir-Ramlija c/w, Triq il-Belt Valletta, Kirkop
6 other applications within 300 m: 2 granted, 0 refused, 0 pending. Tallest granted nearby: 3 floors (PA/02049/23).
On Triq ir-Ramlija: 1 other application, 0 granted and 0 refused.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). Outside the development zone, where approvals are harder. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00782/22 Kirkop: Proposed storm water relief system at Kirkop.
- PA/06261/24 Kirkop: To propose steel car port structure over existing street level car parks with overlying solar photovoltaic panels.
- PA/02396/21 Kirkop: To sanction timber trellis in front garden and timber canopy at first floor level
- PA/04791/24 Kirkop: Sanctioning of generator enclosure and underlying Store and Refuse Area.
- PA/05996/25 Kirkop: Re labelling of floor levels from as approved in PA1778/14.
- PA/02049/23 Kirkop: Proposed internal alterations, demolition and reconstruction of existing garage, extensions at first and second floor levels, pool at second floor level and…
More by Leon Gauci
- PA/07568/26 Mellieha: Construction of storage area adjacent to existing Pumping Station as approved in PA/02287/07.
- PA/07567/26 Attard: Restoration of facade and replacement of existing roof structure.
- PA/06830/26 Qormi: Sanctioning of garage as built.
- PA/06717/26 Zurrieq: Internal alterations to a pre-1967 dwelling, including the construction of a staircase, the replacement of a deteriorated ceiling, the construction of a…
- PA/04121/26 Msida: Change of use from private garage to public service garage.
- PA/03477/26 Marsaskala: Sanctioning of domestic store at basement level following survey and minor variations in the existing property from those approved in permit PA/7370/98,…
All applications by Leon Gauci
More from Karl Cilia
- PA/04335/26 Gzira: Proposed restoration and rehabilitation of the scheduled WSC Gzira pumping station building which is to retain its use of a pumping station and a proposed…
- PA/07736/25 Ghaxaq: Proposed installation of pv panels on the roof of Ghaxaq Reservoir, including the construction of a starter room and the construction and installation of an…
- PA/07732/25 Zurrieq: Proposed installation of PV panels on the roof of Nigret Reservoir, including the construction and installation of an inverter area and inverters and starter…
- PA/07249/25 Pembroke: Demolition of existing planter and construction of a maintenance workshop and storage, transformer rooms, and storage facilities within the existing Pembroke…
- PA/07195/25 Belt Valletta: To carry out restoration works on the external elevations of waste pump premises and minor internal alterations.
- PA/06848/25 Mellieha: Proposed drilling of seawater boreholes and construction of overlying rooms, replacement of existing borehole rooms. Replacement of existing trenching, new…