PA/04610/24: construction of a training centre for St in Paola

Site at, Triq il-Bacir c/w, Triq l-Isqof Buhagiar, Paola

Proposed construction of a training centre for St. John Malta, consisting of ground floor: 6 car spaces, 8 garages for ambulances and fire trucks, 2 stores, kitchen/dining and sanitary facilities. First floor consists of 1 lecture room, 1 multipurpose hall, 3 offices and sanitary facilities. Including fixing of sign, excavation of water reservoir, demolition and reconstruction of boundary wall, demolition and reconstruction of dilapidated roof slabs.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Site at, Triq il-Bacir c/w, Triq l-Isqof Buhagiar, Paola
Locality
Paola
Applicant
St. John Malta Attn: Michael Frendo
Perit
Perit Roderick Camilleri
Application type
Full development permission
Zone
Outside Development Zone
Type of works
Signage
Height
2 floors
Received
17 January 2024
Validated
17 July 2024
Published
17 July 2024
Comments close
2 September 2024
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
7 March 2025
Permit expires
18 March 2030

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Site at, Triq il-Bacir c/w, Triq l-Isqof Buhagiar, Paola

38 other applications within 300 m: 23 granted, 1 refused, 2 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/03641/24).

On Triq il-Bacir: 1 other application, 1 granted and 0 refused.