PA/04646/26: demolition of existing surface car park infrastructure in Luqa
Site within St. Vincent De Paul Residence Grounds, Triq l-Ingiered, Luqa
Proposed demolition of existing surface car park infrastructure, boundary walls, and underground services, followed by the construction of a new Class 2A Intermediate Care Hospital. The proposed development comprises of the excavation of 2 basement levels with carpark, plant and storage areas, with overlying soft landscaping, ground floor admission bays, administration offices, other ancillary areas and back of house areas, 3 overlying floors containing a total of 12 wards for a total bed capacity of 288 beds, Plant Areas at Roof Level, Access tunnel to Centru Ruzar Briffa at lower ground floor level and construction of a new Oxygen Plant.
- Status
- Pending (Screening Process)
- Location
- Site within St. Vincent De Paul Residence Grounds, Triq l-Ingiered, Luqa
- Locality
- Luqa
- Applicant
- St. Vincent de Paul Residence Grounds Jorgen Souness O.B.O
- Perit
- Perit Peter Zammit
- Type of works
- Demolition & New Construction (Residential)
- Height
- 4 floors
- Received
- 18 March 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Site within St. Vincent De Paul Residence Grounds, Triq l-Ingiered, Luqa
12 other applications within 300 m: 7 granted, 0 refused, 3 pending. 100% of decided applications nearby were granted.
On Triq l-Ingiered: 5 other applications, 4 granted and 0 refused. Periti active on this street: Frank Muscat.
Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 0 comparable decisions nearby). No granted application nearby states a height to compare with. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/00386/23 Marsa: Proposed formation of road forming part of development approved by outline permit PA8939/19.
- PA/04739/25 Marsa: To demolish existing structures and removal of rubble, and excavation of site as phase 1 of redevelopment project approved in outline application PA/08939/19.
- PA/05276/24 Marsa: Partial change of use from showroom to include for a proposal fuel station and introduction of cafeteria (Class 4D) and ancillaries within scheme already…
- PA/06364/25 Marsa: Proposed demolition and excavation of site in line with outline development permission PA8939/19. Arched room to be retained.
- PA/06759/26 Marsa: Proposed changes to approved permit PA4418/22. Changes consists in shifting in layouts at basement -2 and -1 parking, warehousing Class 6A and showroom Class…
- PA/06294/25 Marsa: To sanction a horses' therapy pool that is visible in a 1978 aerial photo.
- PA/05088/23 Luqa: Proposed renewal of permit PA1854/15: Proposed formation of access road, relocation of approved gate & reconstruction of boundary walls
- PA/07001/23 Luqa: Removal of existing limewash from facade and pointing same facade with hydraulic lime, and installation of white pvc apertures to facade.
- PA/03137/24 Luqa: Proposed construction of VIE oxygen room and installation of VIE oxygen tanks.
- PA/01448/22 Luqa: Proposed construction of lightweight enclosure for existing generator and alterations to existing apertures.
- PA/04062/24 Luqa: Proposed construction of generator room for St. Vincent de Paul Residence. Proposal also includes rearrangement of parking spaces and installation of…
- PA/05051/24 Luqa: Sanctioning of internal alterations at Ruzar Briffa following detailed site survey.
More by Peter Zammit
- PA/07363/26 Hamrun: Changes to development approved in PA/5540/25 consisting of the omission of two upper floors (Class 4A offices) and internal alterations to the Class 4D…
- PA/05047/26 Siggiewi: Change of use of proposed sub-station as approved in PA/2388/23, to a 2-car garage following consultation with Enemalta, and relocation of approved reservoirs.
- PA/04956/26 Ta' Xbiex: Proposed demolition of existing buildings including changes to development approved in PA/00566/23, proposed excavation of 3 basement levels and underlying…
- PA/04418/26 Luqa: Proposed installation of 10,000L diesel fuel storage and AdBlue admixture, for refueling of heavy vehicles and trailers belonging to site qperator.
- PA/04349/26 San Pawl il-Bahar: Sanctioning minor alterations in ODZ residence.
- PA/03690/26 Birkirkara: To sanction roof with retractable skylight in shaft.