PA/04651/23: Installation in Marsa

A-Station, Il-Moll Tal-Knisja, Triq Fra Diegu, Il-Moll tal-Braken, il-Moll tal-Pont, Marsa

Installation, commissioning and operation of a battery energy storage system (BESS) within the A-Station in Marsa.

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
A-Station, Il-Moll Tal-Knisja, Triq Fra Diegu, Il-Moll tal-Braken, il-Moll tal-Pont, Marsa
Locality
Marsa
Applicant
Ismail D’Amato o.b.o. InterConnect Malta Ltd.
Perit
Perit Reuben Sammut
Application type
Full development permission
Zone
Within Development Zone
Type of works
Other
Received
20 June 2023
Validated
6 September 2023
Published
6 September 2023
Comments close
6 October 2023
Recommendation
Grant Permission
Decision
Grant Permission
Decision date
3 July 2024
Permit expires
17 July 2029

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around A-Station, Il-Moll Tal-Knisja, Triq Fra Diegu, Il-Moll tal-Braken, il-Moll tal-Pont, Marsa

63 other applications within 300 m: 34 granted, 1 refused, 12 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/03247/25).

On Il-Moll Tal-Knisja: 1 other application, 1 granted and 0 refused; granted buildings are typically 1 floors, the tallest 1.

Approval estimate for other applications like this here: about 88% (likely range 58–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Reuben Sammut

All applications by Reuben Sammut

All planning applications in Marsa