---
title: "PA/04678/25: partitions to approved second floor and penthouse in Qormi | PropertyList"
url: https://propertylist.mt/permit/PA-04678-25/qormi-partitions-to-approved-second-floor-and-penthouse
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Qormi: Proposed partitions to approved second floor and penthouse level (PA2352/21). Perit JG Periti. Validated 27 August…

Planning applications › Qormi › PA0467825

# PA/04678/25: partitions to approved second floor and penthouse in Qormi

PR Business Centre, Triq l-Imdina c/w, Triq Karmenu Camilleri, Qormi

Proposed partitions to approved second floor and penthouse level (PA2352/21).

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** PR Business Centre, Triq l-Imdina c/w, Triq Karmenu Camilleri, Qormi
- **Locality:** [Qormi](https://propertylist.mt/planning-applications/qormi)
- **Applicant:** [Embark (Malta) Limited Attn: Robert Ancilleri](https://propertylist.mt/applicant/embark-malta-ltd)
- **Perit:** [JG Periti](https://propertylist.mt/perit/jg-periti)
- **Application type:** Full development permission - Summary Process
- **Zone:** Within Development Zone
- **Type of works:** Other
- **Received:** 24 June 2025
- **Validated:** 27 August 2025
- **Published:** 16 July 2025
- **Comments close:** 31 July 2025
- **Decision:** Acceptable
- **Permit expires:** 10 September 2030

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04678/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04678&caseYear=25)

## Planning activity around PR Business Centre, Triq l-Imdina c/w, Triq Karmenu Camilleri, Qormi

116 other applications within 300 m: 73 granted, 3 refused, 9 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/00452/26).

On Triq l-Imdina: 85 other applications, 53 granted and 3 refused; granted buildings are typically 3 floors, the tallest 4. Periti active on this street: [Charles Buhagiar](https://propertylist.mt/perit/charles-buhagiar), [David Mifsud Parker](https://propertylist.mt/perit/david-mifsud-parker), [architecture 360](https://propertylist.mt/perit/architecture-360), [John Attard](https://propertylist.mt/perit/john-attard), [Chris Cachia](https://propertylist.mt/perit/chris-cachia).

Approval estimate for other applications like this here: about 95% (likely range 65–100%, low reliability, from 3 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/02616/25** Qormi](https://propertylist.mt/permit/PA-02616-25/qormi-changes-to-the-internal-layout-of-approved): Proposed changes to the internal layout of approved Class 4B shops (to reduce from 3 to 2 shops). Granted, validated 23 April 2025, 54 m away
- [**PA/00505/22** Qormi](https://propertylist.mt/permit/PA-00505-22/qormi-proposal-includes-demolition-of-existing-garage-structures): Proposal includes demolition of existing garage structures and excavation for the proposed construction of 28 apartments and 4 penthouses at receded floor… Status being checked, 54 m away
- [**PA/01600/21** Qormi](https://propertylist.mt/permit/PA-01600-21/qormi-internal-alterations-consisting-in-the-removal-of): Proposed internal alterations consisting in the removal of internal partition walls, proposed extension of a room at third floor level, proposed construction… Status being checked, 4 floors, 80 m away
- [**PA/01696/24** Qormi](https://propertylist.mt/permit/PA-01696-24/qormi-sanction-apartment-as-built-from-the-approved): To sanction apartment as built from the approved PA/02375/06. Granted, validated 8 May 2024, 85 m away
- [**PA/01348/21** Qormi](https://propertylist.mt/permit/PA-01348-21/qormi-minor-internal-and-external-alterations-to-approved): Minor internal and external alterations to approved Class 4B units (PA08046/17 and PA06658/17). The proposal also includes the installation of signage. Status being checked, 103 m away
- [**PA/03513/23** Qormi](https://propertylist.mt/permit/PA-03513-23/qormi-sanction-internal-alterations): To sanction internal alterations, installation of a sign & part change of use to ancillary office to an approved industrial garage. Granted, validated 14 June 2023, 110 m away
- [**PA/00545/25** Qormi](https://propertylist.mt/permit/PA-00545-25/qormi-replace-aluminium-balcony-to-an-open-balcony): To replace aluminium balcony to an open balcony plus other internal additions and alterations. Granted, validated 29 January 2025, 122 m away
- [**PA/07307/25** Qormi](https://propertylist.mt/permit/PA-07307-25/qormi-sanction-diesel-tank-and-protective-canopy): To sanction diesel tank and protective canopy. Granted, validated 12 November 2025, 126 m away
- [**PA/01860/24** Qormi](https://propertylist.mt/permit/PA-01860-24/qormi-change-of-use-from-shop-covered-by): Change of use from shop covered by PA 5641/94 to public service garage. Facade to be painted in neutral colours. Refused, validated 3 April 2024, 129 m away
- [**PA/00671/26** Qormi](https://propertylist.mt/permit/PA-00671-26/qormi-extend-the-second-floor-level-and-change): To extend the second floor level and change configuration of washroom at third floor level. Granted, validated 26 February 2026, 146 m away
- [**PA/05783/25** Luqa](https://propertylist.mt/permit/PA-05783-25/luqa-lateral-extension-to-structures-as-approved-in): Proposed lateral extension to structures as approved in virtue of PA/00766/09 and renewed thru' PA/07133/16; proposal will comprise of a one-storey building… Granted, validated 24 September 2025, 1 floor, 155 m away
- [**PA/00722/21** Qormi](https://propertylist.mt/permit/PA-00722-21/qormi-sanction-as-built-garage): To sanction as built garage. Status being checked, 157 m away
- [**PA/03122/21** Qormi](https://propertylist.mt/permit/PA-03122-21/qormi-demolish-dangerous-roof-over-second-floor-level): To demolish dangerous roof over second floor level, affect internal alterations to second floor apartment and erect third and receded floor units. To extend… Status being checked, 4 floors plus a receded floor, 163 m away
- [**PA/02675/23** Qormi](https://propertylist.mt/permit/PA-02675-23/qormi-sanction-garages-as-built): To sanction garages as built. Granted, validated 17 May 2023, 172 m away
- [**PA/08622/24** Qormi](https://propertylist.mt/permit/PA-08622-24/qormi-change-of-use-from-private-garage-to): Change of use from private garage to public service garage including other internal additions and alterations. Granted, validated 24 December 2024, 183 m away

## More by JG Periti

- [**PA/07460/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07460-26/san-pawl-il-bahar-renewal-of-pa-977-14-demolition-of-existing-bank): Renewal of PA/977/14- Demolition of existing bank and erect same including basement parking and contingency building. Pending, validated 28 October 2026
- [**PA/07376/26** Rabat](https://propertylist.mt/permit/PA-07376-26/rabat-partial-excavation-of-site): Proposed partial excavation of site, while retaining and preserving the rest of the site due to the presence of high value archeological features, and… Pending, validated 28 October 2026
- [**PA/07328/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07328-26/san-pawl-il-bahar-construction-of-pump-chamber): Proposed construction of pump chamber. Pending, validated 21 October 2026
- [**PA/07217/26** Swieqi](https://propertylist.mt/permit/PA-07217-26/swieqi-relocation-of-public-service-garage-space): Relocation of public service garage space, addition of pool at roof level, reconfiguration of reservoirs and other changes. Pending, validated 21 October 2026
- [**PA/06980/26** Tarxien](https://propertylist.mt/permit/PA-06980-26/tarxien-demolition-of-existing-dwellings): Proposed demolition of existing dwellings, removal of material, excavation, and construction of 6 basement garages, 2 maisonettes, 6 apartments and 1 penthouse. Pending, validated 14 October 2026, 3 floors plus a receded floor
- [**PA/06947/26** Iklin](https://propertylist.mt/permit/PA-06947-26/iklin-sanctioning-of-clearance-of-site-and-excavation): Sanctioning of clearance of site and excavation. Proposed open storage and construction of 2 floors of warehousing Class 6A at lower basement, basement and… Pending, validated 7 October 2026, 1 floor

[All applications by JG Periti](https://propertylist.mt/perit/jg-periti)

[All planning applications in Qormi](https://propertylist.mt/planning-applications/qormi)
