PA/04790/26: Construction of apartments at second in Munxar
Cassar Buildings, Flats 5,6 and 7, Triq it-Torri, Xlendi, Munxar
Construction of apartments at second, third and receded floor levels.
- Status
- Pending (Awaiting Recommendation)
- Location
- Cassar Buildings, Flats 5,6 and 7, Triq it-Torri, Xlendi, Munxar
- Locality
- Munxar
- Applicant
- Maria Tabone
- Perit
- Perit Mannie Galea
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- New Construction (Residential)
- Height
- 4 floors plus a receded floor
- Residential units
- 3
- Received
- 27 April 2026
- Validated
- 2 September 2026
- Published
- 2 September 2026
- Comments close
- 2 October 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around Cassar Buildings, Flats 5,6 and 7, Triq it-Torri, Xlendi, Munxar
61 other applications within 300 m: 33 granted, 1 refused, 6 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 2 floors (PA/08151/24).
On Triq it-Torri: 13 other applications, 8 granted and 0 refused.
Approval estimate for new construction applications like this here: about 76% (likely range 46–100%, low reliability, from 8 comparable decisions nearby). It proposes 4 floors; the tallest granted nearby is 2. Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02147/22 Munxar: To propose internal and external alterations and roof over front terrace at existing level 5 and construction of additional floor at level 6.
- PA/08346/25 Munxar: To sanction internal variations from permit PA/05130/24, to construct extension to rear bedroom and to include ensuite bathroom.
- PA/05130/24 Munxar: Additions and alterations to enlarge bedroom and add en suite.
- PA/05235/23 Munxar: Proposed front balcony.
- PA/03645/26 Munxar: Proposed sanctioning from approved PA/05634/06 and extension to existing penthouse.
- PA/02377/26 Munxar: To sanction property as built with minor difference in site configuration from that approved in PB612/87.
- PA/05203/24 Munxar: Correction of survey (showing differences in backyard and internal yard), sanctioning of internal variations, correction of site plan from previously approved…
- PA/02700/23 Munxar: Sanctioning of a driveway and a garage as built over site covered by PA/05634/06.
- PA/03425/24 Munxar: To remove the stone balostrades on dilapidated balconies and replace with wrought iron railing on the front elevation.
- PA/06998/23 Munxar: Installation of handrail in lieu of parapet wall.
- PA/02135/21 Munxar: Proposed internal alterations to common stairwell and addition of duplex unit at second and third floor.
- PA/05439/26 Munxar: To sanction first floor apartment as existing from previously approved PA/00999/88.
- PA/02276/26 Munxar: Demolition of existing washroom and construction of a third-floor flat and a receded penthouse, including the installation of a lift across all levels.
- PA/06984/26 Munxar: To sanction alterations from PA5310/03 and propose change of use from garage to 1 bed apartment.
- PA/01898/24 Munxar: To sanction layout of common parts from PA2806/10 and proposed alterations to stairs and formation of lift shaft in common parts of an apartment block.
More by Mannie Galea
- PA/07794/26 Naxxar: To excavate and construct a domestic store at basement level over site covered by PA/07034/23.
- PA/07662/26 Marsa: Alterations to a past Class 4B shop. Change of use to a Class 4B convenience shop including fixing of internally illuminated sign and a/c’s
- PA/07522/26 Birkirkara: Sanctioning of internal alterations to a Class 4A office for use of a Class 4B (EMS) - electrical muscle stimulation studio.
- PA/07488/26 Rabat: Sanctioning of an agricultural store.
- PA/07454/26 Birkirkara: Change of use of a garage into a Class 4B salon including alterations, fixing of internally illuminated sign and a/c.
- PA/07356/26 Birkirkara: Renewal to PA/04630/18 - Formation of a shower room and fixing of an internal partition at first floor level. Demolition pf existing third floor penthouse;…