title: "PA/04840/23: demolition of existing dwelling and construction of in Iklin | PropertyList"
url: https://propertylist.mt/permit/PA-04840-23/iklin-demolition-of-existing-dwelling-and-construction-of
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Granted planning application in Iklin: Proposed demolition of existing dwelling and construction of apartment block with 3 apartments and 1 penthouse,…

Planning applications › Iklin › PA0484023

# PA/04840/23: demolition of existing dwelling and construction of in Iklin

Reve, Triq Geronimo Abos, Iklin

Proposed demolition of existing dwelling and construction of apartment block with 3 apartments and 1 penthouse, underlying Class 4B unit and a basement garage. Proposal includes also a proposed sign at ground floor level.

- **Status:** Granted (This application has been approved by Planning Board / Commission.)
- **Location:** Reve, Triq Geronimo Abos, Iklin
- **Locality:** [Iklin](https://propertylist.mt/planning-applications/iklin)
- **Applicant:** [Raymanda Limited Attn: Emanuel Vella](https://propertylist.mt/applicant/raymanda-ltd)
- **Perit:** [Perit Ludovico Micallef](https://propertylist.mt/perit/ludovico-micallef)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 3 floors plus a receded floor
- **Residential units:** 4
- **Received:** 2 June 2023
- **Validated:** 16 August 2023
- **Published:** 16 August 2023
- **Comments close:** 22 September 2023
- **Recommendation:** Grant Permission
- **Decision:** Grant Permission
- **Decision date:** 19 January 2024
- **Permit expires:** 31 January 2029

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04840/23)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04840&caseYear=23)

## Planning activity around Reve, Triq Geronimo Abos, Iklin

159 other applications within 300 m: 101 granted, 4 refused, 9 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 5 floors (PA/06760/23).

On Triq Geronimo Abos: 13 other applications, 8 granted and 0 refused; granted buildings are typically 3 floors, the tallest 4. Periti active on this street: [Ramon Gauci](https://propertylist.mt/perit/ramon-gauci), [Mario Formosa](https://propertylist.mt/perit/mario-formosa), [Clive Borg Bonaci](https://propertylist.mt/perit/clive-borg-bonaci).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 26 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/06368/25** Iklin](https://propertylist.mt/permit/PA-06368-25/iklin-change-of-use-from-existing-terrace-house): Change of use from existing terrace house to Class 4C and Class 2A, and the construction of two overlying Apartments. Pending, validated 1 October 2025, 2 floors, 20 m away
- [**PA/04549/25** Iklin](https://propertylist.mt/permit/PA-04549-25/iklin-demolishing-of-existing-terraced-house-and-construction): Proposed demolishing of existing terraced house and construction of residential block at Iklin consisting of ground floor garage, three overlying two-bed room… Granted, validated 9 July 2025, 4 floors plus a receded floor, 39 m away
- [**PA/06844/25** Iklin](https://propertylist.mt/permit/PA-06844-25/iklin-demolish-the-existing-property-and-construct-a): To demolish the existing property and construct a Class 4B outlet on the ground floor, three apartments, and a recessed apartment on the topmost floor. Granted, validated 22 October 2025, 41 m away
- [**PA/03122/22** Iklin](https://propertylist.mt/permit/PA-03122-22/iklin-sanction-the-property-as-built-from-what): To sanction the property as built from what was approved in PA4446/15, including internal changes. Status being checked, 49 m away
- [**PA/02375/26** Iklin](https://propertylist.mt/permit/PA-02375-26/iklin-correction-of-site-boundary): Correction of site boundary, including sanctioning of minor alterations from approved PA2315/97. Granted, validated 28 May 2026, 56 m away
- [**PA/00062/22** Iklin](https://propertylist.mt/permit/PA-00062-22/iklin-extend-existing-building-by-three-floors-plus): To extend existing building by three floors plus a receding level, providing three three-bedroom apartments, and one two-bedroom penthouse. Status being checked, 57 m away
- [**PA/00331/20** Iklin](https://propertylist.mt/permit/PA-00331-20/iklin-incorporate-an-area-for-class-4c-use): To incorporate an area for class 4c use (ancillary to established class 4b shop (selling of gifts and household objects). Application include sanctioning of… Status being checked, 61 m away
- [**PA/06377/23** Iklin](https://propertylist.mt/permit/PA-06377-23/iklin-sanction-apartment-as-constructed-including-minor-internal): To sanction apartment as constructed including minor internal and external alterations variations from PA/02692/14. Granted, validated 28 November 2023, 62 m away
- [**PA/06478/24** Iklin](https://propertylist.mt/permit/PA-06478-24/iklin-extension-of-ground-floor-level-as-approved): Extension of ground floor level as approved in PA/00062/22, proposed excavation to provide ancillary storage for residential units. Granted, validated 25 September 2024, 63 m away
- [**PA/04902/26** Iklin](https://propertylist.mt/permit/PA-04902-26/iklin-change-from-three): Proposed change from three (3) approved car parking spaces to two (2) separate garages, including the sanctioning of internal alterations carried out under… Granted, validated 2 September 2026, 72 m away
- [**PA/07349/25** Iklin](https://propertylist.mt/permit/PA-07349-25/iklin-demolition-of-existing-roof-structure-and-part): Proposed demolition of existing roof structure and part demolition of first floor level (retaining facade and internal yard walls), and construction of 3… Granted, validated 12 November 2025, 4 floors plus a receded floor, 72 m away
- [**PA/06565/26** Iklin](https://propertylist.mt/permit/PA-06565-26/iklin-sanction-changes-from-approved-permit-pa8264-20): To sanction changes from approved permit PA8264/20. Pending, 79 m away
- [**PA/01881/23** Iklin](https://propertylist.mt/permit/PA-01881-23/iklin-sanctioning-of-minor-as-built-variations-from-originally): Proposed sanctioning of minor as-built variations from originally approved permits (PAPB223/80). Granted, validated 26 April 2023, 80 m away
- [**PA/04707/23** Iklin](https://propertylist.mt/permit/PA-04707-23/iklin-excavate-one-floor-below-street-level-for): To excavate one floor below street level for basement garages (and additional excavation to accommodate an underlying water reservoir), construct basement… Granted, validated 9 August 2023, 3 floors, 85 m away
- [**PA/06624/25** Iklin](https://propertylist.mt/permit/PA-06624-25/iklin-demolition-of-existing-2-storey-town-house): Demolition of existing 2 storey town house and garage. Excavation for and construction, semi basement and reservoir. Construction of maisonette at ground… Granted, validated 15 October 2025, 4 floors plus a receded floor, 87 m away

## More by Ludovico Micallef

- [**PA/07489/26** Attard](https://propertylist.mt/permit/PA-07489-26/attard-renewal-of-pa-08212-18): Renewal of PA/08212/18 (Demolition of existing terraced house, excavation and construction of a building comprising of basement garages and five overlying… Pending
- [**PA/07071/26** Zurrieq](https://propertylist.mt/permit/PA-07071-26/zurrieq-restoration-and-replacement-of-wooden-apertures): Proposed restoration and replacement of wooden apertures. Pending
- [**PA/06962/26** Marsaskala](https://propertylist.mt/permit/PA-06962-26/marsaskala-sanction-minor-internal-alterations-and-railing-from): To sanction minor internal alterations and railing from PA/05347/20. Pending
- [**PA/06949/26** Marsaskala](https://propertylist.mt/permit/PA-06949-26/marsaskala-variations-from-the-official-building-alignments-in): Variations from the official building alignments in line with Circular 1/24. Pending, validated 7 October 2026
- [**PA/06197/26** Hamrun](https://propertylist.mt/permit/PA-06197-26/hamrun-renewal-of-pa-01212-15): Renewal of PA/01212/15 (addition of another flat and penthouse to existing building, including addition of lift and minor alterations to facade). Pending, validated 9 September 2026
- [**PA/06120/26** Naxxar](https://propertylist.mt/permit/PA-06120-26/naxxar-demolition-of-existing-dwelling-and-proposed-construction): Proposed demolition of existing dwelling and proposed construction of apartment block with 1 maisonette, 3 apartments, 1 penthouse and underlying basement… Granted, validated 16 October 2026, 4 floors plus a receded floor

[All applications by Ludovico Micallef](https://propertylist.mt/perit/ludovico-micallef)

## More from Raymanda Ltd

- [**PA/00829/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-00829-26/san-pawl-il-bahar-propose-changes-from-pa-01082-24): To propose changes from PA/01082/24, to change the ground floor from Class 1 to Class 2C and to construct a pool at roof level. Suspended, validated 13 May 2026
- [**PA/03480/25** San Gwann](https://propertylist.mt/permit/PA-03480-25/san-gwann-change-of-use-of-class-4a-office): Change of use of Class 4A office block as approved in PA/07340/22 to a Class 3A guesthouse with 11 guest rooms and ancillary facilities including a Class 4C… Refused, validated 28 May 2025
- [**PA/01082/24** San Pawl il-Bahar](https://propertylist.mt/permit/PA-01082-24/san-pawl-il-bahar-demolish-the-existing-house): To demolish the existing house, excavate one floor together with the reservoir and to construct a maisonette and 12 apartments and 1 penthouse. Granted, validated 28 February 2024
- [**PA/00874/24** Qormi](https://propertylist.mt/permit/PA-00874-24/qormi-demolition-of-existing-building-and-proposed-construction): Proposed demolition of existing building and proposed construction of apartment block with 2 maisonettes, 8 apartments and 1 penthouse, with underlying… Granted, validated 28 February 2024

[All planning applications in Iklin](https://propertylist.mt/planning-applications/iklin)