---
title: "PA/04899/26: Full demolition of existing townhouse in Zebbug | PropertyList"
url: https://propertylist.mt/permit/PA-04899-26/zebbug-full-demolition-of-existing-townhouse
source: PropertyList (propertylist.mt), from the Malta Planning Authority's public register
retrieved: 2026-11-03
---

> Pending planning application in Zebbug: Full demolition of existing townhouse. Construction of apartment block on Triq Sciortino side of the site, including…

Planning applications › Zebbug › PA0489926

# PA/04899/26: Full demolition of existing townhouse in Zebbug

96, Gauci House, Triq Sciortino and, Triq l-Infetti, Zebbug

Full demolition of existing townhouse. Construction of apartment block on Triq Sciortino side of the site, including excavation of a reservoir and basement, a Class 4B retail at ground floor with signage and three residential units above with a private swimming pool on the roof.

- **Status:** Pending (The case has been referred to a Case Officer and is being assessed with a view of preparing a recommendation report to the Board/Commission)
- **Location:** 96, Gauci House, Triq Sciortino and, Triq l-Infetti, Zebbug
- **Locality:** [Zebbug](https://propertylist.mt/planning-applications/zebbug)
- **Applicant:** [Misrah Kola 2020 Ltd Attn: Dorianne Tabone](https://propertylist.mt/applicant/misrah-kola-2020-ltd)
- **Perit:** [Perit Claude Mallia](https://propertylist.mt/perit/claude-mallia)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction (Residential)
- **Height:** 2 floors
- **Residential units:** 3
- **Received:** 15 May 2026
- **Validated:** 15 July 2026
- **Published:** 15 July 2026
- **Comments close:** 31 August 2026

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04899/26)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04899&caseYear=26)

## Planning activity around 96, Gauci House, Triq Sciortino and, Triq l-Infetti, Zebbug

180 other applications within 300 m: 110 granted, 1 refused, 28 pending. 99% of decided applications nearby were granted. Tallest granted nearby: 4 floors (PA/06165/25).

On Triq Sciortino: 10 other applications, 7 granted and 0 refused. Periti active on this street: [Tancred Mifsud](https://propertylist.mt/perit/tancred-mifsud).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 13 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/07312/25** Zebbug](https://propertylist.mt/permit/PA-07312-25/zebbug-install-removable-reversible-demountable-timber-platform-and-ra): To install removable/reversible demountable timber platform and railings to place tables and chairs. Granted, validated 12 November 2025, 9 m away
- [**PA/00591/26** Zebbug](https://propertylist.mt/permit/PA-00591-26/zebbug-change-of-use-from-class-4b-beauty): Change of use from Class 4B beauty treatment to take away. Granted, validated 4 February 2026, 26 m away
- [**PA/03885/25** Zebbug](https://propertylist.mt/permit/PA-03885-25/zebbug-restoration-of-pre-1968-house-of-character): Restoration of pre-1968 house of character, including replacement of deteriorated beams and roofs, internal alterations, excavation and construction of pool… Granted, validated 18 June 2025, 40 m away
- [**PA/06156/26** Zebbug](https://propertylist.mt/permit/PA-06156-26/zebbug-extension-to-approved-area-for-tables-and): Proposed extension to approved area for tables and chairs as approved by Lands Authority. Pending, validated 9 September 2026, 41 m away
- [**PA/02943/25** Zebbug](https://propertylist.mt/permit/PA-02943-25/zebbug-sanctioning-of-deviations-from-approved-permit): Sanctioning of deviations from approved permit (PB/03019/91) and proposed alterations including demolition of existing staircase, construction of internal… Granted, validated 7 May 2025, 44 m away
- [**PA/05876/24** Zebbug](https://propertylist.mt/permit/PA-05876-24/zebbug-sanction-name-sign-on-facade-of-building): To sanction name sign on facade of building. Granted, validated 4 September 2024, 44 m away
- [**PA/00356/23** Zebbug](https://propertylist.mt/permit/PA-00356-23/zebbug-restoration-and-repair-works-of-part-of): Restoration and repair works of part of the facade of Kazin Banda San Filep. Granted, validated 8 February 2023, 45 m away
- [**PA/03378/21** Zebbug](https://propertylist.mt/permit/PA-03378-21/zebbug-change-ground-floor-shop): To change ground floor shop (Class 4B) to cafeteria (Class 4C) and change first floor maisonette into preparation area (Class 4D) for cafeteria below. To open… Status being checked, 48 m away
- [**PA/02115/26** Zebbug](https://propertylist.mt/permit/PA-02115-26/zebbug-place-removable-reversible-demountable-timber-platform-and-prop): To place removable/reversible/demountable timber platform and proposed extension of outdoor catering area Class 4D on public open space compromising of tables… Granted, validated 1 April 2026, 49 m away
- [**PA/06713/24** Zebbug](https://propertylist.mt/permit/PA-06713-24/zebbug-sanction-internal-and-external-alterations-to-a): To sanction internal and external alterations to a Class 4D Wine Bar, approved by means of PA 213/23, which consist of; the extension of the basement level,… Granted, validated 23 October 2024, 3 floors, 49 m away
- [**PA/00213/23** Zebbug](https://propertylist.mt/permit/PA-00213-23/zebbug-internal-alterations-to-an-existing-2-storey): Proposed internal alterations to an existing 2 storey dwelling, covered by RG2087/20, which works also include part demolition and reconstruction at all floor… Granted, validated 8 February 2023, 2 floors, 49 m away
- [**PA/07052/26** Zebbug](https://propertylist.mt/permit/PA-07052-26/zebbug-platform-for-the-positioning-of-tables-and): Proposed platform for the positioning of tables and chairs linked to an established commercial premises. Application includes ancillary works being… Pending, validated 14 October 2026, 51 m away
- [**PA/06283/25** Zebbug](https://propertylist.mt/permit/PA-06283-25/zebbug-sanction-part-of-property-from-approved-class): To sanction part of property from approved Class 4B to a mix of Class 4B and Class 2A clinic treatment rooms including, to sanction internal changes at ground… Pending, validated 8 October 2025, 54 m away
- [**PA/00178/20** Zebbug](https://propertylist.mt/permit/PA-00178-20/zebbug-sanction-lift-and-pool-at-basement-level): To sanction lift and pool at basement level Granted, validated 22 January 2020, 54 m away
- [**PA/04800/23** Zebbug](https://propertylist.mt/permit/PA-04800-23/zebbug-sanctioning-internal-layout-as-built-and-sanctioning): Sanctioning internal layout as built and sanctioning the change of use from Class 4B to Class 4A. Refused, validated 16 August 2023, 56 m away

## More by Claude Mallia

- [**PA/07791/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07791-26/san-pawl-il-bahar-demolition-of-existing-dwelling-and-structures-in): Demolition of existing dwelling and structures in garden; levelling of site and excavation for the construction of a reservoir; construction of 8 garages at… Pending, 2 floors
- [**PA/07334/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-07334-26/san-pawl-il-bahar-sanction-basement-as-built-including-new-ramp): To sanction basement as built including: new ramp leading to garage, alterations to the internal layouts at basement. Proposed change of use of the basement… Pending, validated 21 October 2026
- [**PA/06977/26** Hamrun](https://propertylist.mt/permit/PA-06977-26/hamrun-demolish-the-existing-3-storey-dwelling-and-construct): To demolish the existing 3-storey dwelling and construct a 5-storey apartment building, comprising a separate domestic store and Class 4B commercial premises… Pending, validated 14 October 2026, 5 floors
- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026
- [**PA/06921/26** Zabbar](https://propertylist.mt/permit/PA-06921-26/zabbar-sanctioning-of-existing-villa-and-re-positioning): Sanctioning of existing villa and re- positioning of pool as built including rebuilding of corridor joining the two buildings. Pending, validated 7 October 2026
- [**PA/06648/26** Pieta](https://propertylist.mt/permit/PA-06648-26/pieta-part-demolition-of-the-existing-building-and): Part demolition of the existing building and construction of an apartment block with a commercial ground floor. Ground floor to be Class 4C (food and drink… Pending, validated 30 September 2026, 4 floors plus a receded floor

[All applications by Claude Mallia](https://propertylist.mt/perit/claude-mallia)

## More from Misrah Kola 2020 Ltd

- [**PA/06936/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06936-26/san-pawl-il-bahar-changes-to-development-approved-in-pa-08002-25): Changes to development approved in PA/08002/25, consisting of the redesign of the internal layout of the apartments (number of units unchanged) and the… Pending, validated 7 October 2026
- [**PA/06921/26** Zabbar](https://propertylist.mt/permit/PA-06921-26/zabbar-sanctioning-of-existing-villa-and-re-positioning): Sanctioning of existing villa and re- positioning of pool as built including rebuilding of corridor joining the two buildings. Pending, validated 7 October 2026
- [**PA/05275/26** St Julians](https://propertylist.mt/permit/PA-05275-26/st-julians-demolition-of-workshop): Demolition of workshop (Class 4B), excavation of reservoir and construction of dwelling on 3 floors and receded floor (Class 1). Pending, validated 5 August 2026, 3 floors plus a receded floor
- [**PA/05243/26** Qormi](https://propertylist.mt/permit/PA-05243-26/qormi-partial-demolition-of-existing-dwelling): Partial demolition of existing dwelling, alterations and construction of extension to retained structure, excavation of 3 underground reservoirs, and… Pending, validated 29 July 2026, 2 floors
- [**PA/02457/26** Zebbug](https://propertylist.mt/permit/PA-02457-26/zebbug-sanction-drawings-as-per-survey): To sanction drawings as per survey, including the proposed demolition of portions of internal walls at all levels, partial demolition of slabs above ground… Granted, validated 6 May 2026, 5 floors
- [**PA/02356/26** Mosta](https://propertylist.mt/permit/PA-02356-26/mosta-demolition-of-existing-terraced-house): Demolition of existing terraced house; excavation of basement and reservoir; and construction of three floors plus one receded floor to accommodate four… Pending, validated 27 May 2026, 3 floors plus a receded floor

[All planning applications in Zebbug](https://propertylist.mt/planning-applications/zebbug)
