> Withdrawn planning application in Zebbug (Gozo): Demolition of roof enclosures at roof level. Proposed construction of two floors, common area enclosure at…

Planning applications › Zebbug (Gozo) › PA0499124

# PA/04991/24: Demolition of roof enclosures at roof level in Zebbug (Gozo)

Don Bosco, Triq ta' Barda c/w, Triq il-Qbajjar, Marsalforn, Zebbug (Gozo)

Demolition of roof enclosures at roof level. Proposed construction of two floors, common area enclosure at roof level and structural reinforcement works at basement level.

- **Status:** Withdrawn (This application for development permission has been withdrawn by the applicant.)
- **Location:** Don Bosco, Triq ta' Barda c/w, Triq il-Qbajjar, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** [Alfred Zammit](https://propertylist.mt/applicant/alfred-zammit)
- **Perit:** [Perit Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** Demolition & New Construction
- **Received:** 29 April 2024
- **Validated:** 31 July 2024
- **Published:** 31 July 2024
- **Comments close:** 16 September 2024

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/04991/24)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=04991&caseYear=24)

## Planning activity around Don Bosco, Triq ta' Barda c/w, Triq il-Qbajjar, Marsalforn, Zebbug (Gozo)

132 other applications within 300 m: 86 granted, 2 refused, 7 pending. 98% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/00494/24).

On Triq ta' Barda: 10 other applications, 7 granted and 0 refused; granted buildings are typically 3 floors, the tallest 3. Periti active on this street: [Wallace Farrugia](https://propertylist.mt/perit/wallace-farrugia).

Approval estimate for demolition & new construction applications like this here: about 95% (likely range 65–100%, low reliability, from 11 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/00216/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00216-23/zebbug-gozo-change-of-use-from-garage-to-class): Change of use from garage to Class 4B shop. Proposal includes the installation of a sign and minor internal alterations. Granted, validated 1 February 2023, 11 m away
- [**PA/02109/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02109-24/zebbug-gozo-sanctioning-as-built-of-apartment-approved-in): Sanctioning as built of apartment approved in PA/06923/04. Granted, validated 28 May 2024, 16 m away
- [**PA/01082/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01082-26/zebbug-gozo-eight-flats): Proposed eight flats (4 on each floor) at levels 7 and 8 on overlying airspace. Suspended, validated 15 April 2026, 8 floors, 21 m away
- [**PA/04203/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04203-23/zebbug-gozo-sanction-minor-differences-from-pa6923-04): To sanction minor differences from PA6923/04. Granted, validated 12 July 2023, 23 m away
- [**PA/04638/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-04638-25/zebbug-gozo-sanctioning-of-minor-differences-to-unit-as): Sanctioning of minor differences to unit as approved through RG3666/18 (not affecting the original parameters that defined the RG), namely the clear internal… Granted, validated 12 August 2025, 32 m away
- [**PA/01182/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01182-26/zebbug-gozo-construct-4-residential-units-on-airspace-apporved): To construct 4 residential units on airspace apporved in RG/01217/25. To also demolish and reconstruct stairs and include a lift. Granted, validated 25 February 2026, 36 m away
- [**PA/01174/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01174-23/zebbug-gozo-sanction-existing-timber-canopy-and-also-sanctioning): To sanction existing timber canopy and also sanctioning the placing of the BCRS machine. Refused, validated 8 March 2023, 39 m away
- [**PA/06139/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06139-25/zebbug-gozo-sanction-formation-of-one-whole-aperture-instead): To sanction formation of one whole aperture instead of the window and door carried out post approval of RG2682/19. Granted, validated 18 October 2025, 40 m away
- [**PA/05804/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05804-24/zebbug-gozo-sanction-minor-changes-to-apartments-facade-approved): To sanction minor changes to apartment's facade approved in PA/02610/15. Granted, validated 3 December 2024, 40 m away
- [**PA/07757/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07757-24/zebbug-gozo-sanction-alterations-to-site-outline-following-site): To sanction alterations to site outline following site survey and other alterations to penthouse from that approved in PA/00754/22. To carry out changes to… Granted, validated 13 November 2024, 40 m away
- [**PA/00754/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00754-22/zebbug-gozo-extension-to-building-comprising-of-construction-of): Extension to building comprising of construction of two apartments at level 3, two apartments at level 4 and one receded penthouse at level 5 overlooking Triq… Status being checked, 6 floors plus a receded floor, 46 m away
- [**PA/07170/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-07170-24/zebbug-gozo-sanction-opening-and-closing-of-internal-doors): To sanction opening and closing of internal doors carried out post RG270/23 permit. Proposed replacement of cement based railing, base of front window and… Granted, validated 4 December 2024, 49 m away
- [**PA/05793/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05793-24/zebbug-gozo-sanction-differences-from-drawings-approved-in-pa-07059-21): To sanction differences from drawings approved in PA/07059/21, namely correction of survey, internal and external alterations and subdivision of approved unit… Granted, validated 5 March 2025, 51 m away
- [**PA/03004/22** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03004-22/zebbug-gozo-construct-new-balconies-at-first-and-second): To construct new balconies at first and second floor. Status being checked, 54 m away
- [**PA/00189/20** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00189-20/zebbug-gozo-construct-two-units): To construct two units, one on each floor, by extending approved but yet unbuilt unit at fourth floor level, and construct new unit at fifth receded floor. Status being checked, 5 floors plus a receded floor, 57 m away

## More by Nathaniel Sammut

- [**PA/07090/26** Mosta](https://propertylist.mt/permit/PA-07090-26/mosta-renewal-of-pa5021-18-to-sanction-as): Renewal of PA5021/18 - To sanction as built floor levels. Proposed alterations in the common area and third floor include; roofing over the terrace, a… Pending, 4 floors plus a receded floor
- [**PA/06826/26** Mgarr](https://propertylist.mt/permit/PA-06826-26/mgarr-sanction-construction-of-wall-in-garage-and): To sanction construction of wall in garage and other minor changes. Pending, validated 7 October 2026
- [**PA/06581/26** San Pawl il-Bahar](https://propertylist.mt/permit/PA-06581-26/san-pawl-il-bahar-changes-to-wc): Proposed changes to wc, parapet wall and facade. Pending, validated 23 September 2026
- [**PA/05245/26** Balzan](https://propertylist.mt/permit/PA-05245-26/balzan-sanction-demolition-of-wall-and-proposed-re-construction): To sanction demolition of wall and proposed re-construction. Pending, validated 29 July 2026
- [**PA/01724/26** Mgarr](https://propertylist.mt/permit/PA-01724-26/mgarr-shifting-of-greenhouse): Shifting of greenhouse, solar panels and reservoir which were approved in PA/1044/24, and proposed construction of a pump room. Granted, validated 18 March 2026
- [**PA/00487/26** Marsaxlokk](https://propertylist.mt/permit/PA-00487-26/marsaxlokk-installation-of-a-concrete-platform-and-construction): Proposed installation of a concrete platform and construction of a lightweight structure for the administration of the hardstanding facilities. Granted, validated 4 February 2026, 1 floor

[All applications by Nathaniel Sammut](https://propertylist.mt/perit/nathaniel-sammut)

## More from Alfred Zammit

- [**PA/08121/25** San Gwann](https://propertylist.mt/permit/PA-08121-25/san-gwann-sanction-the-class-shop-4b-structures-as): To sanction the Class shop 4B structures as built, in accordance with the approved permit PA/02958/15. Granted, validated 17 December 2025
- [**PA/06373/24** St Julians](https://propertylist.mt/permit/PA-06373-24/st-julians-change-the-use-of-a-class-4b): To change the use of a Class 4B shop into a Class 4C shop, to carry out minor internal and external alterations, to fix a sign and to sanction layout as built… Granted, validated 25 September 2024
- [**PA/04777/24** Zebbug](https://propertylist.mt/permit/PA-04777-24/zebbug-change-of-use-from-class-4b-to): To change of use from Class 4B to studio flat. Proposal includes also alterations to facade and other internal alterations. Granted, validated 24 July 2024
- [**PA/04735/24** Belt Valletta](https://propertylist.mt/permit/PA-04735-24/belt-valletta-sanction-facade-and-signage-as-built-from): To sanction facade and signage as built from approved PA/06854/06. No modifications to approved layout. Granted, validated 24 July 2024
- [**PA/01243/24** Hamrun](https://propertylist.mt/permit/PA-01243-24/hamrun-convert-a-3-bedroom-apartment-to-a): To convert a 3 bedroom apartment to a 5 bedroom apartment. Granted, validated 3 July 2024
- [**PA/03667/23** Marsa](https://propertylist.mt/permit/PA-03667-23/marsa-internal-alterations-to-existing-building): Internal alterations to existing building (removal of internal walls, replacing of roof slabs which are not in a structurally sound condition) and demolition… Pending, validated 21 June 2023

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)