propertylist

PA/05008/26: Proposal change of use from a furniture in Hamrun

No. 80, The City Link Hotel, Triq il-Kbira San Guzepp, Hamrun

Proposal change of use from a furniture showroom to a Class 3B hotel, including demolition of the existing first floor slab and facade, the construction of first, second and setback floors, the installation of a lift, internal and external alterations at ground floor level, the construction of a roof level pool.

Status
Pending (Awaiting Recommendation)
Location
No. 80, The City Link Hotel, Triq il-Kbira San Guzepp, Hamrun
Locality
Hamrun
Applicant
Abdulrahman Alyasin
Perit
Perit Chris Cachia
Application type
Outline development permission
Zone
Within Development Zone
Type of works
Demolition & New Construction (Commercial)
Height
3 floors plus a receded floor
Received
15 June 2026
Validated
22 July 2026
Published
22 July 2026
Comments close
7 September 2026

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around No. 80, The City Link Hotel, Triq il-Kbira San Guzepp, Hamrun

222 other applications within 300 m: 143 granted, 8 refused, 19 pending. 95% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/07400/23).

On Triq il-Kbira San Guzepp: 94 other applications, 65 granted and 3 refused; granted buildings are typically 3 floors, the tallest 5. Periti active on this street: Mark Camilleri, Sapienza & Sullivan, Edwin Mintoff, Emmanuel Agius, David Zahra.

Approval estimate for demolition & new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 20 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Chris Cachia

All applications by Chris Cachia

All planning applications in Hamrun