PA/05165/26: sanction site configuration in San Pawl il-Bahar
161/162, Infill Plot, Triq San Pawl, San Pawl il-Bahar
To sanction site configuration; additional excavation at rear of site resulting in a larger footprint and the retention of the two and a half feet from neighbouring property from that approved in PA/5208/24.
- Status
- Pending (Awaiting Recommendation)
- Location
- 161/162, Infill Plot, Triq San Pawl, San Pawl il-Bahar
- Locality
- San Pawl il-Bahar
- Applicant
- Raymond Camilleri
- Perit
- Perit Wayne Scerri
- Application type
- Full development permission
- Zone
- Within Development Zone
- Type of works
- Sanctioning
- Received
- 23 June 2026
- Validated
- 29 July 2026
- Published
- 29 July 2026
- Comments close
- 14 September 2026
Case details on the Planning Authority website
Plans, case officer report and decision on eapps
Planning activity around 161/162, Infill Plot, Triq San Pawl, San Pawl il-Bahar
125 other applications within 300 m: 77 granted, 2 refused, 18 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 7 floors (PA/02674/25).
On Triq San Pawl: 91 other applications, 61 granted and 0 refused; granted buildings are typically 5 floors, the tallest 7. Periti active on this street: JG Periti, Edwin Mintoff, Maria Schembri Grima, Jean Azzopardi, MODEL.
Approval estimate for sanctioning applications like this here: about 94% (likely range 64–100%, low reliability, from 22 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.
- PA/02971/25 San Pawl il-Bahar: Proposed minor internal alterations, sanctioning of structure at roof level and proposed dismantling of existing enclosed gold aluminium balcony and proposed…
- PA/00846/25 San Pawl il-Bahar: Renewal of PA/06295/16 - Demolition of existing washrooms and construction of duplex unit at 4th and 5th floor from Triq San Pawl. Proposal also include…
- PA/03465/23 San Pawl il-Bahar: Proposed division of the existing two-bedroom ground floor apartment into two separate units. A one-bedroom apartment and one-bedroom studio apartment.
- PA/01246/26 San Pawl il-Bahar: Proposed changes to approved permits PA/06167/24 and PA/01209/25. The changes include the addition of one garage (increasing the total number of garages from…
- PA/01209/25 San Pawl il-Bahar: Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first…
- PA/06167/24 San Pawl il-Bahar: Proposed demolition of existing property, excavation of a plot and construction of one garage private use at ground floor level, and 6 apartments from first…
- PA/07126/24 San Pawl il-Bahar: Retention of facade, demolition of the existing building and the construction of an office (Class 4A) at ground floor level and six overlying dwelling units.
- PA/06221/23 San Pawl il-Bahar: Renewal of PA7049/17 consisting of alterations to PA6143/16 including an additional floor, alterations to layout and modification of single storey apartment…
- PA/03335/24 San Pawl il-Bahar: Proposed new outdoor cable kiosk to replace older kiosk to service an existing pumping station.
- PA/05072/25 San Pawl il-Bahar: Proposed application in lieu of PA7049/17 as renewed in PA6221/23 including the demolition of the existing ground floor and reconfiguration of levels to…
- PA/07703/26 San Pawl il-Bahar: Proposed parapet wall at roof level to screen roof services on a pre-1967 dwelling, including pv panels.
- PA/01264/26 San Pawl il-Bahar: The development shall include alterations and additions to the development approved under PA/2674/25, namely: the demolition of the neighbouring two-storey…
- PA/02674/25 San Pawl il-Bahar: Demolition of existing structure, and construction of 7 floors of apartments.
- PA/01102/23 San Pawl il-Bahar: Proposed consolidation of two pre-1967 dwellings into a two bedroom maisonette. The following includes alterations such as opening/closing of openings,…
- PA/00004/21 San Pawl il-Bahar: To construct two additional floors and a receded floor and internal modifications to existing structure, to create three apartments and a duplex apartment.
More by Wayne Scerri
- PA/07358/26 Sliema: To demolish existing internal walls and ceilings (retaining facade), plus construction of a Class 3A guest house at ground, first, second, third and setback…
- PA/07337/26 Nadur: Proposed internal alterations to approved PA6882/22.
- PA/07302/26 Kercem: To retain facade, to partly internal additions to existing pre-1967 dwelling, to excavate and to construct 3 residential dwellings. To also carry out…
- PA/07245/26 Kercem: To demolish existing building, propose excavation and construction of reservoir, 9 garages at basement level, office Class 4A, signage, residential units at…
- PA/07175/26 Kalkara: To extend the existing washroom at setback floor level, in an existing pre-1968 dwelling.
- PA/07021/26 St Julians: To convert an existing dilipadited pre-67 residential structure on the same built up footprint consisting of internal and external modifications including…
All applications by Wayne Scerri
More from Raymond Camilleri
- PA/07036/26 Zebbug: To sanction agricultural store, underlying reservoir and wind breaker in recycled stone for citrus trees.
- PA/06192/26 Ta' Xbiex: Demolition of existing building structure (apartments) and proposed replacement of new building structure with additional three floors (including setback).
- PA/06391/25 San Pawl il-Bahar: To untie holding tied with permission PA/01068/22 (parcel of land 723132), and tie solely the holdings shown in the submitted LPIS holdings (parcel of land…
- PA/03213/25 Rabat: Sanctioning of minor internal and external alterations as-built from PA/8675/17.
- PA/01863/25 Birkirkara: Sanctioning of minor changes from approved Confectionery (Class 4b) in PA/03079/93 and proposed Take Away to include on-site cooking facilities.
- PA/01006/25 Birkirkara: To sanction apartment from approved permit PA3822/05. Proposed opramorta at roof level.