> Withdrawn planning application in Zebbug (Gozo): To construct seven residential units in the existing airspace and to propose internal additions to the…

Planning applications › Zebbug (Gozo) › PA0523725

# PA/05237/25: construct seven residential units in the existing in Zebbug (Gozo)

'Ta' Mewg il-Bahar Court', Block G, Airspace, Triq Miegel Bahar c/w, Triq is-Salini, Marsalforn, Zebbug (Gozo)

To construct seven residential units in the existing airspace and to propose internal additions to the common areas on all levels to construct a lift shaft to accommodate a lift.

- **Status:** Withdrawn (This application for development permission has been withdrawn by the applicant.)
- **Location:** 'Ta' Mewg il-Bahar Court', Block G, Airspace, Triq Miegel Bahar c/w, Triq is-Salini, Marsalforn, Zebbug (Gozo)
- **Locality:** [Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)
- **Applicant:** [Victor Attard](https://propertylist.mt/applicant/victor-attard)
- **Perit:** [Perit Leonard Spiteri](https://propertylist.mt/perit/leonard-spiteri)
- **Application type:** Full development permission
- **Zone:** Within Development Zone
- **Type of works:** New Construction (Residential)
- **Residential units:** 7
- **Received:** 13 May 2025
- **Published:** 20 August 2025
- **Comments close:** 9 September 2025

[Case details on the Planning Authority website](https://www.pa.org.mt/pacasedetails?CaseType=PA/05237/25)

[Plans, case officer report and decision on eapps](https://eapps.pa.org.mt/Case/CaseDetails?caseType=PA&casenumber=05237&caseYear=25)

## Planning activity around 'Ta' Mewg il-Bahar Court', Block G, Airspace, Triq Miegel Bahar c/w, Triq is-Salini, Marsalforn, Zebbug (Gozo)

33 other applications within 300 m: 26 granted, 1 refused, 2 pending. 96% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/02160/24).

On Triq Miegel Bahar: 4 other applications, 3 granted and 0 refused. Periti active on this street: [Vella + Grech Periti](https://propertylist.mt/perit/vella-grech-periti), [Ivan Giordano](https://propertylist.mt/perit/ivan-giordano).

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 9 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

- [**PA/01249/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01249-26/zebbug-gozo-extension-to-unit-at-the-receded-floor): Proposed extension to unit at the receded floor level, subdividing it into two separate units and the construction of an additional two units at the existing… Granted, validated 29 April 2026, 10 m away
- [**PA/03857/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03857-26/zebbug-gozo-extension-to-existing-unit-located-at-the): Proposed extension to existing unit located at the receded floor; sub-dividing it into two units and the construction of an additional unit at the existing… Pending, validated 26 August 2026, 3 floors plus a receded floor, 11 m away
- [**PA/05947/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05947-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block I) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 24 October 2024, 17 m away
- [**PA/05945/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05945-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block H) by creating 2 new apartments and 1 new penthouse, including the installation of lift. Granted, validated 21 January 2025, 23 m away
- [**PA/03038/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03038-24/zebbug-gozo-extend-over-existing-airspace): To extend over existing airspace (Block D) by creating 4 new apartments and 1 new penthouse, including also installation of lift. Granted, validated 25 June 2024, 26 m away
- [**PA/05441/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05441-25/zebbug-gozo-extend-over-existing-airspace-by-creating-four): To extend over existing airspace by creating four (4) new units, including the common parts. Granted, validated 19 November 2025, 35 m away
- [**PA/05442/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05442-25/zebbug-gozo-extend-over-existing-airspace-by-creating-five): To extend over existing airspace by creating five (5) new units, including common parts. Granted, validated 4 November 2025, 36 m away
- [**PA/00832/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00832-26/zebbug-gozo-excavate-the-site-for-the-construction-of): To excavate the site for the construction of a reservoir, two levels of basement garages, two maisonettes, fourteen apartments, and two recessed penthouses. Granted, validated 11 February 2026, 2 floors plus a receded floor, 46 m away
- [**PA/05498/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-05498-23/zebbug-gozo-minor-internal-and-external-alterations-to-existing): Minor internal and external alterations to existing dwelling. Granted, validated 31 October 2023, 66 m away
- [**PA/02160/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02160-24/zebbug-gozo-alterations-and-additions-at-fifth-floor-level): Proposed alterations and additions at fifth floor level and to construct a penthouse at sixth floor level. Granted, validated 7 August 2024, 6 floors, 71 m away
- [**PA/06671/23** Zebbug (Gozo)](https://propertylist.mt/permit/PA-06671-23/zebbug-gozo-sanction-shifting-of-internal-walls-and-reallocation): To sanction shifting of internal walls and reallocation of rooms. Granted, validated 5 January 2024, 73 m away
- [**PA/00803/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00803-26/zebbug-gozo-alterations-and-additions-at-fifth-floor-level): Proposed alterations and additions at fifth floor level and to construct a penthouse at sixth floor level. Granted, validated 11 April 2026, 6 floors plus a receded floor, 75 m away
- [**PA/00072/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00072-26/zebbug-gozo-carry-out-alterations-to-staircase-and-proposed): To carry out alterations to staircase and proposed lift. Granted, validated 10 March 2026, 81 m away
- [**PA/02747/24** Zebbug (Gozo)](https://propertylist.mt/permit/PA-02747-24/zebbug-gozo-extend-penthouse-approved-in-rg-02541-17-by-carrying): To extend penthouse approved in RG/02541/17 by carrying out alterations to layout and facade and to construct a penthouse on top. Granted, validated 20 August 2024, 84 m away
- [**PA/03296/26** Zebbug (Gozo)](https://propertylist.mt/permit/PA-03296-26/zebbug-gozo-sanction-changes-consisting-of-site-configuration-and): To sanction changes consisting of site configuration and changes to two flats at fourth floor level and proposed changes to two flats at fifth floor level and… Granted, validated 1 July 2026, 5 floors plus a receded floor, 88 m away

## More by Leonard Spiteri

- [**PA/07696/26** Gudja](https://propertylist.mt/permit/PA-07696-26/gudja-demolish-the-existing-structure-and-construct-4): To demolish the existing structure and construct 4 basement garages, 1 maisonette and 1 apartment at ground-floor level, 6 apartments at first-, second- and… Pending, 4 floors plus a receded floor
- [**PA/07485/26** Nadur](https://propertylist.mt/permit/PA-07485-26/nadur-propose-internal-and-external-alterations-and-additions): To propose internal and external alterations and additions to the existing structures, together with the excavation and construction of a swimming pool. Pending, validated 28 October 2026
- [**PA/07230/26** Msida](https://propertylist.mt/permit/PA-07230-26/msida-demolition-of-the-existing-dwelling-and-construction): Demolition of the existing dwelling and construction of ground-floor car parking spaces, together with Class 4B stationery premises, five offices at… Pending, validated 21 October 2026
- [**PA/07158/26** Fontana](https://propertylist.mt/permit/PA-07158-26/fontana-change-of-use-of-the-two-class): Change of use of the two Class 4A offices at ground-floor level, approved under PA/06591/25, to Class 4B (beautician) and a residential unit. Pending, validated 14 October 2026
- [**PA/06645/26** San Lawrenz](https://propertylist.mt/permit/PA-06645-26/san-lawrenz-construct-agricultural-store-with-underlying-reservoir-and): To construct agricultural store with underlying reservoir and to install a gate. Pending, validated 7 October 2026
- [**PA/06610/26** Xewkija](https://propertylist.mt/permit/PA-06610-26/xewkija-propose-internal-and-external-alterations-and-additions): To propose internal and external alterations and additions to a pre-1967 building. Pending, validated 23 September 2026

[All applications by Leonard Spiteri](https://propertylist.mt/perit/leonard-spiteri)

## More from Victor Attard

- [**PA/01655/25** Zebbug (Gozo)](https://propertylist.mt/permit/PA-01655-25/zebbug-gozo-renew-pa-00624-20): To renew PA/00624/20 - (To demolish existing washrooms at roof level and to construct 2 apartments and a penthouse). Withdrawn
- [**PA/00448/25** Xewkija](https://propertylist.mt/permit/PA-00448-25/xewkija-change-of-use-from-class-4b): Change of use from Class 4B (ironmongery), approved in PA/3951/18, to a Class 3C thai boxing gym. Granted, validated 29 January 2025
- [**PA/03159/22** Siggiewi](https://propertylist.mt/permit/PA-03159-22/siggiewi-sanction-existing-agricultural-store-extension-to-agricultura): To sanction existing agricultural store extension to agricultural store approved in PA980/20. To sanction existing pre-1978 agricultural store. To carry out… Status being checked
- [**PA/00980/20** Siggiewi](https://propertylist.mt/permit/PA-00980-20/siggiewi-demolish-and-re-construct-a-pre-1978-room-for): To demolish & re-construct a pre-1978 room for agricultural use with same footprint. To install PV panels on top. Status being checked
- [**PA/00624/20** Zebbug (Gozo)](https://propertylist.mt/permit/PA-00624-20/zebbug-gozo-demolish-existing-washrooms-at-roof-level-and): To demolish existing washrooms at roof level and to construct 2 apartments and a penthouse. Status being checked

[All planning applications in Zebbug (Gozo)](https://propertylist.mt/planning-applications/zebbug-gozo)