propertylist

PA/05306/23: Alteration of stairwell including construction of lift in San Pawl il-Bahar

Summer Hill, Triq Piscopo Macedonia c/w, Triq Katerina Vitale, San Pawl il-Bahar

Alteration of stairwell including construction of lift shaft, addition of two apartments and penthouse over existing apartment block, and changing of existing facade apertures and railings

Status
Granted (This application has been approved by Planning Board / Commission.)
Location
Summer Hill, Triq Piscopo Macedonia c/w, Triq Katerina Vitale, San Pawl il-Bahar
Locality
San Pawl il-Bahar
Applicant
Ernest Vella
Perit
Perit Reuben Borg
Application type
Full development permission - Summary Process
Zone
Within Development Zone
Type of works
New Construction (Residential)
Residential units
3
Received
12 June 2023
Validated
31 October 2023
Published
6 September 2023
Comments close
22 September 2023
Decision
Acceptable
Permit expires
15 November 2028

Case details on the Planning Authority website

Plans, case officer report and decision on eapps

Planning activity around Summer Hill, Triq Piscopo Macedonia c/w, Triq Katerina Vitale, San Pawl il-Bahar

103 other applications within 300 m: 62 granted, 2 refused, 10 pending. 97% of decided applications nearby were granted. Tallest granted nearby: 6 floors (PA/06990/20).

On Triq Piscopo Macedonia: 33 other applications, 22 granted and 0 refused; granted buildings are typically 6 floors, the tallest 6. Periti active on this street: Duncan Formosa, Matthew Bugeja, Michael Anastasi, Philip Micallef, Mark Camilleri.

Approval estimate for new construction applications like this here: about 93% (likely range 63–100%, low reliability, from 10 comparable decisions nearby). Indicative only. It's based on decisions for similar nearby applications, not on the drawings or the case officer's report; it gets better as documents are added from eapps.

More by Reuben Borg

All applications by Reuben Borg

All planning applications in San Pawl il-Bahar